← Back
Miscellaneous religious facility
130 MANHATTAN AVENUE
BROOKLYN · East Williamsburg · BIN 3071204
💬 Discuss this project
1953Year Built
4Stories
M9Building Class
R6Zoning
14,000 sfGross Floor Area
1Units
Rent Stabilized21 Open Violations 19 unresolved · 2 paperwork only ▸FDNY Report ↗
Miscellaneous religious facility · 5,067 sf lot · 2.76 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionEquipment
Roof6p · 4 filings · 20 docs
Bulkhead2p · 2 filings · 20 docs
Floor 62p · 2 filings · 6 docs
Floor 53p · 2 filings · 16 docs
Floor 46p · 3 filings · 20 docs
Floor 35p · 3 filings · 20 docs
Floor 24p · 3 filings · 20 docs
Floor 11p · 1 filing · 3 docs
Cellar5p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WATERMARK1707/08/2026
OWNERS REP807/08/2026
WMCM203/22/2026
HEART SHARE HUMAN SERVICES203/22/2026
HEART SHARE SERVICES I103/22/2026
WATERMARK CAPITAL803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&D ENGINEERING, PLLC510/25/2022
PAUL PERDEK, PROF. ENG. PLLC412/07/2021
STEEL CORE ENGINEERING PLLC104/28/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION803/21/2026
WMCM1003/21/2026
BUILDINGS REPRISENTATIVE LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WMCM LLCGeneral Contractor1507/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor707/08/2026
PRIME PIPING & HEATING INPlumbing507/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
NATALIYA DONSKOYElectrical103/21/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
PRIME PIPING HEATING INPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394610/25/2022
Building Lifecycle
All (117)Filed (10)Permit Issued (12)Signed Off (7)Violation (44)Inspection (6)Objection (18)Special Inspection (20)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/06/2025
Signed off — Alteration
plumbing work type in conjunction with Alt 1 application 321589777
B00340124-I1
09/05/2025
Violation issued (ECB, closed)
Construction
11/25/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/06/2023
Signed off — Alteration
installation of sprinkler system as per submitted drawings in conjunction with alt 1 application 321589777
B00340127-I1
02/02/2023
Signed off — Alteration
B00340121-I1
02/02/2023
Signed off — Alteration
B00419114-I1
11/03/2022
Permit issued — Construction Fence
B00419114-I1-FN
11/03/2022
Permit issued — Mechanical Systems
B00340130-I1-MS
10/28/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/28/2022
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
10/28/2022
Special inspection requirement — Maintenance information
Paul Raymond
10/28/2022
Special inspection requirement — Electrical energy consumption
Paul Raymond
10/28/2022
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
10/28/2022
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
10/28/2022
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
10/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
10/26/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/26/2022
Special inspection requirement — Sprinkler Systems
Paul Raymond
10/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
10/25/2022
Filed — Alteration
installation of sprinkler system as per submitted drawings in conjunction with alt 1 application 321589777
B00340127-P1
10/24/2022
Objection resolved — Addressed
10/24/2022
Objection resolved — Addressed
10/24/2022
Objection resolved — Addressed
10/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
10/19/2022
Special inspection requirement — Sprinkler Systems
Paul Raymond
10/06/2022
Objection resolved — Addressed
10/06/2022
Objection resolved — Addressed
10/06/2022
Objection resolved — Addressed
10/06/2022
Objection resolved — Addressed
10/06/2022
Objection resolved — Addressed
10/06/2022
Objection resolved — Addressed
09/30/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00641539-I1
09/30/2022
Signed off — Alteration
B00641525-I1
09/30/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00641515-I1
07/29/2022
Objection raised — Scope
07/29/2022
Objection raised — Inspections
07/29/2022
Objection raised — Inspections
07/29/2022
Objection raised — Scope
07/29/2022
Objection raised — Inspections
07/29/2022
Objection raised — Other
07/29/2022
Objection raised — Other
07/29/2022
Objection raised — Other
07/29/2022
Objection raised — Other
07/28/2022
Filed — Alteration
plumbing work type in conjunction with Alt 1 application 321589777
B00340124-P1
07/27/2022
Special inspection requirement — Maintenance information
Paul Raymond
07/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
07/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
07/27/2022
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
07/27/2022
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
07/27/2022
Special inspection requirement — Electrical energy consumption
Paul Raymond
07/27/2022
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
07/20/2022
Permit issued — Plumbing
B00340124-I1-PL
07/19/2022
Permit issued — Construction Fence
B00419114-I1-FN
06/17/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/17/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/17/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offWMCM LLC11/03/2022
DOB NOWMechanical SystemsSigned-offWMCM LLC11/03/2022
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/20/2022
DOB NOWConstruction FenceSigned-offWMCM LLC07/19/2022
DOB NOWSprinklersSigned-offA M B MECHANICAL INC03/22/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC12/09/2021
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC12/08/2021
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC12/08/2021
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/23/2021
DOB NOWStructuralSigned-offWMCM LLC07/20/2021
DOB NOWConstruction FenceSigned-offWMCM LLC07/16/2021
DOB NOWConstruction FenceSigned-offWMCM LLC11/04/2020
BIS—ISSUEDWMCM LLC11/02/2022
BIS—ISSUEDWMCM LLC12/10/2021
BISOTISSUEDWMCM LLC11/04/2021
BISOTISSUEDWMCM LLC07/15/2021
BISOTISSUEDWMCM LLC10/20/2020
BISFPISSUEDCHIEF FIRE PREVETION AND MECH10/09/2003
BISBLISSUEDGEORGE BASSOLINO INC05/22/1992
4 projects · most recent 12/26/2022
General Wiring
FiledStatusContractorScope
12/26/2022CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
04/07/2022CompleteSTAR ELEC'L CONTRACTORS C—
12/03/2021CompleteV. VASS ELECTRIC CORP—
10/28/2020CompleteHIVOLTS ELECTRICAL INC—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/28/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/26/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/17/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/17/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
10/28/2022HVAC and service water heating equipment Paul Raymondenergy_progress
10/28/2022Maintenance informationPaul Raymondenergy_progress
10/28/2022Electrical energy consumptionPaul Raymondenergy_progress
10/28/2022Energy Code Compliance InspectionsPaul Raymondprogress
10/28/2022Fire-Resistance Rated ConstructionPaul Raymondprogress
10/28/2022HVAC and service water heating system controls Paul Raymondenergy_progress
10/28/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
10/26/2022Sprinkler SystemsPaul Raymondspecial
10/26/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
10/19/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
10/19/2022Sprinkler SystemsPaul Raymondspecial
07/27/2022Maintenance informationPaul Raymondenergy_progress
07/27/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
07/27/2022Energy Code Compliance InspectionsPaul Raymondprogress
07/27/2022Fire-Resistance Rated ConstructionPaul Raymondprogress
07/27/2022HVAC and service water heating system controls Paul Raymondenergy_progress
07/27/2022Electrical energy consumptionPaul Raymondenergy_progress
07/27/2022HVAC and service water heating equipment Paul Raymondenergy_progress
12/03/2021FinalPaul Perdekprogress
12/03/2021FinalPaul Perdekprogress
▾Documents — 154 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch3
08/31/2026B00641525-I1Request digital key ↗
08/31/2026B00641539-I1Request digital key ↗
08/31/2026B00641515-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00340127-P1Request digital key ↗
09/02/2026B00340127-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00340124-I1Request digital key ↗
08/15/2026B00340124-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00340121-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00419114-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00340130-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION13
07/22/2025321589777Open ↗
02/15/2023321589777Open ↗
12/20/2022321589777Open ↗
Showing 3 of 13 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)2
12/10/2021321589777Open ↗
10/20/2020340768805Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)2
12/10/2021321589777Open ↗
10/20/2020340768805Open ↗
▸BISWORK PERMIT APPLICATION2
12/10/2021321589777Open ↗
10/20/2020340768805Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/04/2021340733451Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM3
01/18/2022321589777Open ↗
12/10/2021321589777Open ↗
01/06/2021321589777Open ↗
▸BISJOB # 321386077 LOCATED ON THE SAMEZONING LOT, SHALL AMEND ZONINGANALYSIS AND ZD1 IN ACCORDANCE WITH PROPOSED CHANGES UNDER DOC #21
02/21/2023321589777Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/13/2020321589777Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
08/13/2020321589777Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
08/13/2020321589777Open ↗
▸BISJOB # 321598829 LOCATED ON THE SAMEZONING LOT, SHALL AMEND ZONING ANALYSISAND ZD1 IN ACCORDANCE WITH PROPOSEDCHANGES UNDER DOC #21
02/21/2023321589777Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature14
08/31/2026B00340124-P1Open ↗
08/31/2026B00340124-P1Open ↗
08/31/2026B00340124-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/02/2026B00419114-I1Open ↗
08/31/2026B00641525-I1Open ↗
08/13/2026B00340124-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B00340127-I1Open ↗
09/02/2026B00340127-I1Open ↗
08/31/2026B00340124-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/14/2020340768805Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/14/2020340768805Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWFDNY: Letter of No Objection2
08/13/2026B00340127-P1Open ↗
08/13/2026B00340127-I1Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
02/02/2023321589777Open ↗
▸BISDEP STORMWATER/SEWER CERTIFICATION (HCP/SCP)1
01/06/2021321589777Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/02/2023321589777Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
02/02/2023321589777Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
12/07/2021321589777Open ↗
09/30/2021340733451Open ↗
▸BISSTREET TREE CHECKLIST2
10/04/2021340733451Open ↗
12/21/2020321589777Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/13/2020321589777Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026B00340124-I1Open ↗
08/13/2026B00340130-I1Open ↗
08/13/2026B00340127-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00340124-I1Open ↗
08/13/2026B00340124-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/14/2020340768805Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/10/2021321589777Open ↗
12/07/2021321589777Open ↗
01/11/2021321589777Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/02/2023321589777Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
01/11/2021321589777Open ↗
▸BISINTERIOR LIGHTING POWER1
02/02/2023321589777Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/02/2023321589777Open ↗
▸BISFENESTRATION AREAS1
02/02/2023321589777Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/02/2023321589777Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/02/2023321589777Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/02/2023321589777Open ↗
▸BISELECTRIC MOTORS1
02/02/2023321589777Open ↗
▸BISLIGHTING CONTROLS1
02/02/2023321589777Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/02/2023321589777Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
02/02/2023321589777Open ↗
▸BISEXTERIOR LIGHTING POWER1
02/02/2023321589777Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/09/2023340768805Open ↗
12/07/2021321589777Open ↗
12/21/2020321589777Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/02/2023321589777Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/02/2023321589777Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
10/20/2020340768805Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
02/02/2023321589777Open ↗
▸Approvals, Objections & Sign-offs16
▸BISSCHEDULE A - OCCUPANCY / USE7
12/20/2022321589777Open ↗
01/04/2022321589777Open ↗
12/06/2021321589777Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/18/2020321589777Open ↗
10/23/2020321589777Open ↗
10/23/2020321589777Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/31/2026B00641525-I1Open ↗
08/13/2026B00641515-I1Open ↗
08/13/2026B00641539-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/10/2023340768805Open ↗
▸BISFINAL1
02/08/2023340768805Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
02/06/2023321589777Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
07/24/2025321589777Open ↗
07/14/2025321589777Open ↗
12/21/2020321589777Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/08/2023340768805Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION5
02/25/2022340733451Open ↗
01/18/2022321589777Open ↗
12/27/2021321589777Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/30/2021340733451Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/14/2020340768805Open ↗
▸Other Documents10
▸BISSD1 & SD2 DEP SITE CONNECTION1
08/13/2020321589777Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
01/06/2021321589777Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
02/02/2023321589777Open ↗
▸BISVESTIBULES1
02/02/2023321589777Open ↗
▸BISMAINTENANCE INFORMATION1
02/02/2023321589777Open ↗
▸BISPERMANENT CERTIFICATE1
02/02/2023321589777Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/30/2021340733451Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
02/02/2023321589777Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/30/2021340733451Open ↗
▸BISPLOT DIAGRAM1
08/13/2020321589777Open ↗