Office with commercial, 1-6 stories
130 PRINCE STREET
MANHATTAN · BIN 1007712
💬 Discuss this project
1925Year Built
5Stories
O5Building Class
M1-5/R7XZoning
62,362 sfGross Floor Area
8Units
LL97 Covered2 Open Violations 0 unresolved · 2 paperwork only ▸
Office with commercial, 1-6 stories · Owner of record: ENGLEWOOD PARTNERS LLC · 12,625 sf lot · 4.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Roof17p · 7 filings · 20 docs
Penthouse4p · 1 filing · 19 docs
Floor 56p · 5 filings · 20 docs
Floor 47p · 4 filings · 20 docs
Floor 37p · 4 filings · 20 docs
Floor 214p · 8 filings · 20 docs
Floor 153p · 20 filings · 20 docs
Cellar55p · 23 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MADISON CAPITAL16007/08/2026
ENGLEWOOD PARTNERS3903/22/2026
SCIAME CONSTRUCTION203/22/2026
130 PRINCE ASSOCIATES7703/22/2026
STUART MOORE LTD103/22/2026
LIC103/22/2026
MCNALLY JACKSON CO103/22/2026
KAUFMAN MANAGEMENT COMPANY803/21/2026
JESSICA STROKE AGENT FOR OWNER203/21/2026
KAUFMAN ADLER REALTY403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/23/2019$206.3M—— → —$3,308/sf building
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES16603/21/2026
GREEN STUDIO603/21/2026
AE DESIGN SOLUTION203/21/2026
Rigid Structural Design, LLC103/21/2026
SPRING SCAFFOLDING LLC403/21/2026
PATUXENT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCIAME CONSTRUCTION LLCGeneral Contractor4207/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor1507/08/2026
FULL CAPACITY FIRE CORPFire Protection807/08/2026
JRM CONSTRUCTION MGMT LLCGeneral Contractor707/08/2026
CMA PLUMBING & HEATING INFire Protection607/08/2026
LCS PLUMBING&CONSULT INCPlumbing507/08/2026
PAR PLUMBING CO., INCPlumbing507/08/2026
ASG CONSTRUCTION GROUP INGeneral Contractor507/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor407/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor407/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor307/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor303/21/2026
J. CAIAZZO PLBG & HTG CORPFire Protection207/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing207/08/2026
S & J INDUSTRIAL CORPPlumbing107/08/2026
GKF ELECL CONTRACTORS INCElectrical103/22/2026
LEADER ELECTRIC CO., INCElectrical103/22/2026
NEE ELECTRICAL, LLCElectrical103/22/2026
TODARO JOSEPHElectrical103/21/2026
A + SPRINKLER CORPFire Protection107/08/2026
METFLOW FIRE CONTROL LLCFire Protection107/08/2026
A PLUS PLUMBING CORPPlumbing107/08/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
GARY BORRESSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEP INSPECTIONS, INC1102312/10/2024
CATALPA SPECIAL INSPECTIO20041410/29/2024
AUTOGRAPHIC CO1579310/29/2024
METRIC CONSULTING AND INS1803608/28/2024
MILROSE CONSULTANTS LLC20031207/17/2024
SPECIAL INSPECTION SERVIC12003407/02/2024
TAN ENGINEERING, P.C.1291112/21/2021
GZA GEOENVIRONMENTAL OF N1179106/04/2021
Building Lifecycle
All (300)Filed (61)Permit Issued (55)Signed Off (39)Violation (12)Inspection (32)Objection (71)Special Inspection (30)
09/10/2026
Signed off — Alteration
M00740839-I1
09/10/2026
Signed off — Alteration
Filing for the renovation of the retail space on the 1st, cellar, and mezzanine. Work includes removal and installation of interior non load bearing partitions, doors, finish work, concrete ramp and infill. No change in use, egress, or occupancy.
M00723077-I1
05/15/2025
Signed off — Alteration
Filing for modification of mechanical system at the cellar and 1st floor. No change to use, egress, or occupancy.
M00546453-I1
04/24/2025
Signed off — Alteration
Filing for new mechanical work at the cellar and 1st floor. No change in use, egress, or occupancy.
M00723088-I1
04/22/2025
Special inspection requirement — Mechanical Systems
ERIC BERLENT
04/22/2025
Special inspection requirement — Final
ERIC BERLENT
04/04/2025
Signed off — Alteration
Filing for new sprinkler work at the cellar and 1st floor. No change in use, egress, or occupancy.
M00723129-I1
04/04/2025
Signed off — Alteration
Filing for sprinkler work in the cellar. No change in use, egress or occupancy.
M00619966-I1
03/17/2025
Objection resolved — Addressed
01/17/2025
Objection resolved — Addressed
01/17/2025
Objection resolved — Addressed
12/16/2024
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
12/16/2024
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
12/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
12/10/2024
Filed — Alteration
Filing for sprinkler work in the cellar. No change in use, egress or occupancy.
M00619966-P1
11/22/2024
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
11/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
11/19/2024
Signed off — Alteration
Filing for plumbing work at the cellar. No change in use, egress or occupancy.
M00546300-I1
11/14/2024
Special inspection requirement — Concrete - Cast-In-Place
asghar Ghodsi
11/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
11/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
11/14/2024
Special inspection requirement — Final
ERIC BERLENT
11/08/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/07/2024
Objection resolved — Addressed
11/06/2024
Signed off — Alteration
M00546260-I1
11/06/2024
Objection raised — Scope
11/04/2024
Signed off — Alteration
Filing for renovation of the cellar and 1st floor space. Work includes removal and installation of interior non load bearing partitions, doors, finish work. No change to use, egress, or occupancy.
M00545891-I1
10/29/2024
Filed — Alteration
Filing for the renovation of the retail space on the 1st, cellar, and mezzanine. Work includes removal and installation of interior non load bearing partitions, doors, finish work, concrete ramp and infill. No change in use, egress, or occupancy.
M00723077-P1
10/25/2024
Special inspection requirement — Concrete - Cast-In-Place
asghar Ghodsi
10/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
10/25/2024
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
10/25/2024
Special inspection requirement — Final
ERIC BERLENT
10/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
10/24/2024
Objection raised — Scope
10/24/2024
Objection raised — Scope
10/24/2024
Objection raised — Scope
10/18/2024
Signed off — Alteration
M00468758-I1
10/17/2024
Signed off — Alteration
Foundation work as shown on plans filed herewith. No change in egress, use or occupancy.
M00907999-S2
10/10/2024
Signed off — Alteration
M00468756-I1
10/09/2024
Signed off — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00565042-I1
10/09/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/07/2024
Filed — Alteration
Filing for modification of mechanical system at the cellar and 1st floor. No change to use, egress, or occupancy.
M00546453-P1
10/07/2024
Inspection — Fail-Final SP Permit Withdrawal
Fail
View inspection ↗
10/04/2024
Signed off — Alteration
Filing for structural work at the 1st and 2nd floor. Work includes slab openings and new framing. No change to use, egress, or occupancy.
M00546542-S1
10/04/2024
Signed off — Alteration
Filing for structural work at the 1st and 2nd floor. Work includes slab openings and new framing. No change to use, egress, or occupancy.
M00546542-I1
10/03/2024
Signed off — Alteration
Filing for interior demolition of an existing commercial space. Work includes removal of interior non load bearing partitions, convenience stairs, doors, finish work, new slab openings. No change in use egress or occupancy.
M00546427-I1
10/03/2024
Signed off — Alteration
M00723117-I1
09/09/2024
Filed — No Work
M01106704-I1
09/04/2024
Signed off — Alteration
Foundation work as shown on plans filed herewith. No change in egress, use or occupancy.
M00907999-I1
09/04/2024
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
09/04/2024
Special inspection requirement — Final
ERIC BERLENT
09/04/2024
Special inspection requirement — Footing and Foundation
SAMI HAJJAR P.E
09/04/2024
Special inspection requirement — Subgrade Inspections
SAMI HAJJAR P.E
09/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
09/04/2024
Special inspection requirement — Masonry
SAMI HAJJAR P.E
08/29/2024
Objection raised — Scope
08/29/2024
Objection resolved — Addressed
08/28/2024
Filed — Alteration
Filing for foundation work at the cellar. Work includes slab removal, shallow excavation and framing. No change in use, egress occupancy.
M00545551-P3
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC06/07/2024
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR03/28/2024
DOB NOWSprinklersSigned-offANTHONY CAIAZZO03/28/2024
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP12/14/2023
DOB NOWPlumbingSigned-offA PLUS PLUMBING CORP11/09/2023
DOB NOWSprinklersSigned-offA + SPRINKLER CORP11/08/2023
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP11/08/2023
DOB NOWFoundationSigned-offJRM CONSTRUCTION MGMT LLC10/25/2023
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC10/20/2023
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC10/18/2023
DOB NOWStructuralSigned-offJRM CONSTRUCTION MGMT LLC10/18/2023
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP09/05/2023
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC03/15/2023
DOB NOWSprinklersSigned-offANTHONY CAIAZZO01/26/2023
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR01/26/2023
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC01/17/2023
DOB NOWFoundationSigned-offSCIAME CONSTRUCTION LLC01/12/2023
DOB NOWStructuralPermit IssuedSCIAME CONSTRUCTION LLC12/15/2022
DOB NOWGeneral ConstructionSigned-offSCIAME CONSTRUCTION LLC12/08/2022
DOB NOWMechanical SystemsSigned-offSCIAME CONSTRUCTION LLC12/07/2022
DOB NOWGeneral ConstructionSigned-offSCIAME CONSTRUCTION LLC12/07/2022
DOB NOWGeneral ConstructionSigned-offSCIAME CONSTRUCTION LLC12/07/2022
DOB NOWMechanical SystemsSigned-offSCIAME CONSTRUCTION LLC12/07/2022
DOB NOWMechanical SystemsSigned-offSCIAME CONSTRUCTION LLC12/07/2022
DOB NOWMechanical SystemsSigned-offASG CONSTRUCTION GROUP IN11/16/2022
DOB NOWSprinklersPermit IssuedFULL CAPACITY FIRE CORP07/26/2022
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP07/26/2022
DOB NOWGeneral ConstructionSigned-offASG CONSTRUCTION GROUP IN07/19/2022
DOB NOWStructuralSigned-offASG CONSTRUCTION GROUP IN07/07/2022
DOB NOWConstruction FenceSigned-offTRI BOROUGH SCAFFOLDING06/23/2022
DOB NOWFoundationSigned-offSCIAME CONSTRUCTION LLC04/21/2022
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP04/19/2022
DOB NOWGeneral ConstructionSigned-offTRI BOROUGH SCAFFOLDING04/15/2022
DOB NOWGeneral ConstructionSigned-offTRI BOROUGH SCAFFOLDING04/15/2022
DOB NOWStandpipeSigned-offFULL CAPACITY FIRE CORP04/14/2022
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP04/14/2022
DOB NOWBoiler EquipmentSigned-offARCO PLBG AND HTG INC03/24/2022
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC03/17/2022
DOB NOWStructuralSigned-offSCIAME CONSTRUCTION LLC02/28/2022
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC02/23/2022
+ 60 more permits on file
24 projects · most recent 05/13/2026
General Wiring
FiledStatusContractorScope
05/13/2026CompleteGKF ELECL CONTRACTORS INCGeneral Wiring
03/13/2026CompleteLEADER ELECTRIC CO., INCGeneral Wiring
03/13/2026CompleteLEADER ELECTRIC CO., INCGeneral Wiring
02/06/2026CompleteMETROPOLIS ELECTRIC CORPGeneral Wiring
11/30/2025CancelledLEADER ELECTRIC CO., INCGeneral Wiring
11/30/2025CancelledLEADER ELECTRIC CO., INCGeneral Wiring
11/27/2025CompleteLEADER ELECTRIC CO., INC—
11/26/2025CompleteLEADER ELECTRIC CO., INC—
11/26/2025CompleteLEADER ELECTRIC CO., INCGeneral Wiring
11/25/2025CompleteLEADER ELECTRIC CO., INCGeneral Wiring
11/10/2025CompleteTITAN ELEC'L & ELEV CONTRGeneral Wiring
06/26/2025CompleteNEE ELECTRICAL, LLC—
11/28/2023CompleteERNE VALLEY ELECTRICAL INGeneral Wiring
01/27/2023Permit IssuedAPOLLO ELECTRIC INC.General Wiring
04/28/2022Complete5 J'S ELECTL CONTS CORP—
1 project · most recent 08/28/2024
Steel Concrete Masonry
FiledStatusContractorScope
08/28/2024Permit IssuedSCIAME CONSTRUCTION LLCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 32
DateTypeResultReport
11/08/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/09/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/07/2024Fail-Final SP Permit WithdrawalFailView ↗
07/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/27/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/24/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/21/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/26/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/20/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/15/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/13/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/09/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/09/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 32.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/22/2025Mechanical SystemsERIC BERLENTspecial
04/22/2025FinalERIC BERLENTprogress
12/16/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
12/16/2024Post-installed AnchorsNicolas Crosettospecial
12/16/2024Sprinkler SystemsNicolas Crosettospecial
11/22/2024Post-installed AnchorsNicolas Crosettospecial
11/22/2024Fire-Resistant Penetrations and JointsNicolas Crosettospecial
11/14/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
11/14/2024Fire-Resistance Rated ConstructionERIC BERLENTprogress
11/14/2024FinalERIC BERLENTprogress
11/14/2024Concrete - Cast-In-Placeasghar Ghodsispecial
10/25/2024Concrete - Cast-In-Placeasghar Ghodsispecial
10/25/2024FinalERIC BERLENTprogress
10/25/2024Fire-Resistance Rated ConstructionERIC BERLENTprogress
10/25/2024Sprinkler SystemsNicolas Crosettospecial
10/25/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
09/04/2024Subgrade InspectionsSAMI HAJJAR P.Especial
09/04/2024FinalERIC BERLENTprogress
09/04/2024Footing and FoundationSAMI HAJJAR P.Eprogress
09/04/2024Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
09/04/2024Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
09/04/2024MasonrySAMI HAJJAR P.Especial
08/26/2024Post-installed AnchorsSAMI HAJJAR P.Especial
08/26/2024Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
08/26/2024MasonrySAMI HAJJAR P.Especial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
BlackboxRetailCellar, Floor 1
Project M00546260 Alteration · LOC Issued · 11/10/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,633 on file (BIS + DOB NOW)
▸Plans & Drawings96
▸DOB NOWPlans/Sketch51
09/04/2026M00468756-I1Request digital key ↗
09/03/2026M00520171-I1Request digital key ↗
09/03/2026M00559069-I1Request digital key ↗
Showing 3 of 51 on file for this type
▸DOB NOWPlans/Sketch - Plumbing10
09/04/2026M00371149-I1Request digital key ↗
09/03/2026M00427653-I1Request digital key ↗
09/03/2026M00427653-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems8
09/04/2026M00371945-P2Request digital key ↗
09/04/2026M00371945-P3Request digital key ↗
09/03/2026M00371138-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold5
09/04/2026M00403849-I1Request digital key ↗
09/03/2026M00427080-I1Request digital key ↗
Showing 2 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/04/2026M00427666-P5Request digital key ↗
09/04/2026M00427666-I1Request digital key ↗
09/02/2026M00371928-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
09/02/2026M00448553-P3Request digital key ↗
09/02/2026M00448553-P1Request digital key ↗
09/02/2026M00448553-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/04/2026M00468756-I1Request digital key ↗
09/04/2026M00468171-I1Request digital key ↗
09/04/2026M00468758-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe3
09/02/2026M00371928-P3Request digital key ↗
09/02/2026M00371928-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
09/02/2026M00796500-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00140121-I1Request digital key ↗
09/04/2026M00458258-I1Request digital key ↗
▸Applications & Permits289
▸BISPLAN / WORK APPROVAL APPLICATION150
02/13/2026120674911Open ↗
04/04/2025140933319Open ↗
04/01/2025120677133Open ↗
Showing 3 of 150 on file for this type
▸BISWORK PERMIT APPLICATION83
01/10/2025122849052Open ↗
10/23/2024122849052Open ↗
08/06/2024122849052Open ↗
Showing 3 of 83 on file for this type
▸DOB NOWLPC Approval/Permit50
09/04/2026M00371945-P2Open ↗
09/04/2026M00371945-P3Open ↗
09/04/2026M00371149-I1Open ↗
Showing 3 of 50 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)3
04/21/2021140933319Open ↗
Showing 1 of 3 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)3
04/21/2021140933319Open ↗
Showing 1 of 3 on file for this type
▸Seals & Professional Certifications414
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION117
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 117 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature97
09/30/2026M00545551-P1Open ↗
09/30/2026M00545551-P1Open ↗
09/30/2026M00545551-P1Open ↗
Showing 3 of 97 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature92
09/04/2026M00371945-P1Open ↗
09/04/2026M00371945-P3Open ↗
09/04/2026M00371945-P2Open ↗
Showing 3 of 92 on file for this type
▸DOB NOWProgress Inspector Seal & Signature35
09/30/2026M00545551-P1Open ↗
09/30/2026M00545551-P1Open ↗
09/27/2026M00520171-I1Open ↗
Showing 3 of 35 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Trade Schedules & Equipment56
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos132
▸DOB NOWDEP ACP-5: Asbestos Assessment Report75
09/04/2026M00371945-P2Open ↗
09/04/2026M00371945-P3Open ↗
09/04/2026M00371149-I1Open ↗
Showing 3 of 75 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)35
06/18/2021140945208Open ↗
Showing 1 of 35 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸Energy Compliance64
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISNYCECC EXEMPTION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/11/2025122849052Open ↗
11/11/2025122849052Open ↗
11/11/2025122849052Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFENESTRATION AREAS1
09/15/2022140980017Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
09/15/2022140980017Open ↗
▸BISINTERIOR LIGHTING POWER1
09/15/2022140980017Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/15/2022140980017Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports67
▸BISTECHNICAL REPORT: RESPONSIBILITY45
08/08/2024122849052Open ↗
03/30/2022110319138Open ↗
03/30/2022140980017Open ↗
Showing 3 of 45 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION7
08/08/2024122849052Open ↗
08/18/2022140980017Open ↗
05/03/2022110319138Open ↗
Showing 3 of 7 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)6
08/08/2024122849052Open ↗
08/18/2022140980017Open ↗
05/03/2022110319138Open ↗
Showing 3 of 6 on file for this type
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS3
03/30/2022110319138Open ↗
03/23/2022140933239Open ↗
03/23/2022140933239Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS2
03/23/2022140933319Open ↗
01/14/2022140933337Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
03/23/2022140933319Open ↗
12/15/2021140933337Open ↗
▸BISMASONRY1
03/23/2022140933319Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
04/21/2021140933319Open ↗
▸Approvals, Objections & Sign-offs186
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST67
04/07/2025140933319Open ↗
11/07/2024122055346Open ↗
11/02/2023140980017Open ↗
Showing 3 of 67 on file for this type
▸BISLANDMARKS APPROVAL48
06/18/2021140945208Open ↗
03/01/2021140980017Open ↗
Showing 2 of 48 on file for this type
▸BISADMINISTRATIVE OBJECTIONS22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE18
05/16/2024122849052Open ↗
02/16/2024122849052Open ↗
05/16/2022122849052Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
04/01/2025120677133Open ↗
03/23/2021140980017Open ↗
03/01/2021140980017Open ↗
Showing 3 of 12 on file for this type
▸BISLANDMARKS SIGNOFF10
02/14/2025110319138Open ↗
02/14/2025140933319Open ↗
11/07/2024122055346Open ↗
Showing 3 of 10 on file for this type
▸BISFINAL6
08/18/2022140980017Open ↗
03/23/2022140945208Open ↗
03/23/2022140933319Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER3
10/23/2024122849052Open ↗
06/07/2022140980017Open ↗
04/04/2022110319138Open ↗
▸Cost, Insurance & Ownership101
▸BISCOST AFFIDAVIT93
08/06/2021140933239Open ↗
03/23/2021140980017Open ↗
Showing 2 of 93 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW38
11/06/2024122055346Open ↗
03/23/2022140945208Open ↗
03/15/2022140980017Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms165
▸BISBOROUGH INTAKE FORM56
01/10/2025122849052Open ↗
10/23/2024122849052Open ↗
08/09/2024122849052Open ↗
Showing 3 of 56 on file for this type
▸BISADDITIONAL INFORMATION50
08/05/2024122849052Open ↗
08/05/2024122849052Open ↗
06/04/2024122849052Open ↗
Showing 3 of 50 on file for this type
▸BISEFILING COVER SHEET47
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 47 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸Other Documents24
▸DOB NOWProof of Historic Building7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
06/18/2021140945208Open ↗
02/26/2021110319138Open ↗
02/26/2021110319138Open ↗
Showing 3 of 6 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAlternate Plan 42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type