← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
130 PROSPECT PLACE
BROOKLYN · Prospect Heights · BIN 3255806
💬 Discuss this project
1889Year Built
5Stories
RMBuilding Class
R7AZoning
14,752 sfGross Floor Area
14Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 130 132 PROSPECT PLACE CORP · 3,297 sf lot · 4.47 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BK CONSTRUCTIONDBA SRT CONSTRUCTION504/09/2026
BK CONSTRUCTION SVCS203/22/2026
130-132 PROSPECT PLACE CONDOMINIUM103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP208/19/2025
MICHAEL HANSON ARCHITECT207/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LLOYD NOEL BUILDING CONSULTANT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BK CONSTRUCTION SVCS INCGeneral Contractor404/09/2026
PRO-MONTE GROUP LLCGeneral Contractor303/21/2026
P.S.I. MECHANICALPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018107/23/2024
Building Lifecycle
All (45)Filed (4)Permit Issued (4)Signed Off (4)Violation (16)Inspection (2)Objection (12)Special Inspection (3)
01/27/2026
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.
B01273894-S1
01/27/2026
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.
B01273894-I1
09/03/2025
Violation issued (ECB, closed)
Construction
09/03/2025
Violation issued (ECB, closed)
Construction
08/20/2025
Permit issued — Sidewalk Shed
B01273894-I1-SH
08/20/2025
Permit issued — Supported Scaffold
B01273894-S1-SF
08/19/2025
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.
B01273894-S1
08/19/2025
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.
B01273894-I1
10/25/2024
Signed off — Alteration
Renovation of existing apart on the 4th floor removal and/or relocation of non-load bearing partitions to reconfigured storage room, new bathroom, coat closet & laundry closet with non-vented electric dryer. No change of use, occupancy and egress.
B01060560-I1
10/25/2024
Signed off — Alteration
Renovation of existing 3rd floor apartment. Removal and installation of plumbing fixtures. No change of use, egress or occupancy under this application.
B01078984-I1
10/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/10/2024
Permit issued — Plumbing
B01078984-I1-PL
09/06/2024
Permit issued — General Construction
B01060560-I1-GC
08/13/2024
Objection raised — Other
08/13/2024
Objection resolved — Addressed
08/13/2024
Objection raised — Scope
08/13/2024
Objection resolved — Addressed
08/13/2024
Objection raised — Scope
08/13/2024
Objection resolved — Addressed
08/13/2024
Objection raised — Scope
08/13/2024
Objection resolved — Addressed
08/10/2024
Objection resolved — Addressed
07/29/2024
Objection raised — Scope
07/26/2024
Objection raised — Scope
07/26/2024
Objection resolved — Addressed
07/23/2024
Filed — Alteration
Renovation of existing apart on the 4th floor removal and/or relocation of non-load bearing partitions to reconfigured storage room, new bathroom, coat closet & laundry closet with non-vented electric dryer. No change of use, occupancy and egress.
B01060560-I1
07/23/2024
Filed — Alteration
Renovation of existing 3rd floor apartment. Removal and installation of plumbing fixtures. No change of use, egress or occupancy under this application.
B01078984-I1
07/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
07/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
William Ryan
06/03/2024
Special inspection requirement — Final
MICHAEL HANSON
03/24/2023
Violation issued (HPD, closed)
A
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/28/2017
Violation issued (HPD, closed)
I
11/14/2016
Violation issued (HPD, closed)
I
10/13/2015
Violation issued (HPD, closed)
I
03/01/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC08/20/2025
DOB NOWSupported ScaffoldSigned-offBK CONSTRUCTION SVCS INC08/20/2025
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL09/10/2024
DOB NOWGeneral ConstructionSigned-offPRO-MONTE GROUP LLC09/06/2024
2 projects · most recent 08/22/2025
General Wiring
FiledStatusContractorScope
08/22/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
07/10/2019CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/11/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
07/11/2024Fire-Resistance Rated ConstructionWilliam Ryanprogress
06/03/2024FinalMICHAEL HANSONprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026B01273894-S1Request digital key ↗
08/20/2026B01273894-I1Request digital key ↗
08/15/2026B01060560-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
08/13/2026B01060560-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026B01273894-S1Open ↗
08/20/2026B01273894-I1Open ↗
08/13/2026B01078984-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026B01060560-I1Open ↗
09/23/2026B01060560-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026B01060560-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026B01078984-I1Open ↗
08/13/2026B01060560-I1Open ↗
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/13/2026B01078984-I1Open ↗
08/13/2026B01060560-I1Open ↗