HPD03/18/2021§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BASEMENT DOOR LOCKED AT BOILER ROOM
HPD10/24/2019§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD02/25/2019§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT C UPPER LEVEL, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD02/25/2019§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND SOUTH WALL (5 SQ. FT.) IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT C UPPER LEVEL, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 12930131 ISSUED 25-FEB-19 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE ''27-2017.3a(3)(a) or (b).
HPD02/25/2019§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT C UPPER LEVEL, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD02/25/2019§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT C UPPER LEVEL, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
ECB03/26/2018PERMANENT DWELLING USED/CONVERTED FOR OTHER THAN PERMANENT-RESIDENTIAL PURPOSED. DOB RECORDS INDICATES BLDG TO BE LEGALLY APPROVED AS A CLASS 'A' MULTIPLE DWELLING, NOW APT REAR DUPLEX IS USED/CONVERTED TO TRANNothing owed — awaiting certificate of correction
ECB06/02/1992WORK WITHOUT A PERMIT. WORK NOTED: 20'*10'*8' WOOD SHACK ERECTED ON VACANT LOT. REMEDY: REMOVE ILLEGAL STRUCTURENothing owed — awaiting certificate of correction
Condo, residential unit in walk-up building · 25,027 sf lot · 1.63 FAR built · Flood zone X