← Back
BuildNYC
Elevator apt, fireproof without stores
Starrett City
130 VANDALIA AVENUE · BIN 3343583
💬 Discuss this project
1970Year Built
20Stories
D3Building Class
R5Zoning
1,688,760 sfGross Floor Area
2,926Units
LL97 CoveredRent Stabilized23 Active Violations 19 unresolved · 4 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: BSC Housing Company · 1,073,857 sf lot · 1.57 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Bsc Housing Company, INC2p · 1 filing · 3 docs
Site & exteriorBsc Housing Company, INC11p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Grenadire Realty703/21/2026
Starrett City303/21/2026
BSC Owner203/21/2026
BSC Housing Company103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company110/18/2024
Sandeep Gunnala Engineering109/13/2023
Paul Perdek, Prof. Engineering206/25/2021
Cowley Engineering104/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution403/21/2026
Theresa Voltaggio103/21/2026
Core Consultants NYC103/21/2026
New York & Company203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.B. Demolitionspecialty_contractor303/21/2026
Proto Restoration ConstructionScaffold303/21/2026
Advanced Plumbing MechanicalGeneral Contractor203/22/2026
Spieler & Ricca Electrical CoElectrical103/21/2026
Pna ContractingGeneral Contractor107/08/2026
Advanced Plumbing MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851110/18/2024
Sandeep Gunnala Engineering8482109/13/2023
Cowley Engineering186104/03/2021
Building Lifecycle
All (93)Filed (5)Permit Issued (4)Signed Off (4)Facade (FISP) (12)Violation (60)Inspection (3)Special Inspection (5)
06/30/2026
Violation issued (HPD, closed)
C
06/21/2026
Violation issued (HPD, closed)
C
07/28/2025
Signed off — Alteration
REMOVAL OF EXISTING CONCRETE SIDEWALK AND ASPHALT DRIVEWAY, POURING OF NEW CONCRETE WALKWAY & ASPHALT DRIVEWAY, INSTALLATION OF NEW CURB, REINSTALLEXISTING LIGHTING ON NEW CONCRETE FOOTING, INSTALL GUARDRAIL, PERMEABLE PAVERS, BOLLARDS
B00921807-I1
05/08/2025
Permit issued — General Construction
B00921807-I1-GC
01/30/2025
Signed off — Alteration
REGISTER GAS DRYERS (BUILDING NO. D2).
B01094806-I1
12/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2024
Violation issued (HPD, closed)
C
12/05/2024
Violation issued (HPD, closed)
C
11/18/2024
Permit issued — Plumbing
B01094806-I1-PL
10/18/2024
Filed — Alteration
REGISTER GAS DRYERS (BUILDING NO. D2).
B01094806-I1
08/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2023
Violation issued (HPD, closed)
C
11/08/2023
Violation issued (HPD, closed)
C
10/09/2023
Violation issued (HPD, closed)
A
10/09/2023
Violation issued (HPD, closed)
B
10/09/2023
Violation issued (HPD, closed)
B
09/13/2023
Filed — Alteration
REMOVAL OF EXISTING CONCRETE SIDEWALK AND ASPHALT DRIVEWAY, POURING OF NEW CONCRETE WALKWAY & ASPHALT DRIVEWAY, INSTALLATION OF NEW CURB, REINSTALLEXISTING LIGHTING ON NEW CONCRETE FOOTING, INSTALL GUARDRAIL, PERMEABLE PAVERS, BOLLARDS
B00921807-I1
09/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
08/29/2023
Special inspection requirement — Concrete - Cast-In-Place
Sandeep Gunnala
08/29/2023
Special inspection requirement — Post-installed Anchors
Sandeep Gunnala
08/18/2023
Special inspection requirement — Final
Sandeep Gunnala
05/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/14/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00501068-I1
06/06/2022
Cycle 9 facade report submitted
06/06/2022
Cycle 9 facade report signed — SAFE
04/12/2022
Cycle 9 facade inspection completed
12/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/12/2021
Violation issued (HPD, closed)
B
12/12/2021
Violation issued (HPD, closed)
A
12/12/2021
Violation issued (HPD, closed)
B
12/12/2021
Violation issued (HPD, closed)
C
12/12/2021
Violation issued (HPD, closed)
C
12/12/2021
Violation issued (HPD, closed)
C
12/12/2021
Violation issued (HPD, closed)
B
12/12/2021
Violation issued (HPD, closed)
B
12/12/2021
Violation issued (HPD, closed)
B
12/12/2021
Violation issued (HPD, closed)
B
12/12/2021
Violation issued (HPD, closed)
C
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/26/2021
Violation issued (HPD, closed)
B
10/26/2021
Violation issued (HPD, closed)
B
10/26/2021
Violation issued (HPD, closed)
B
10/19/2021
Violation issued (HPD, closed)
B
10/19/2021
Violation issued (HPD, closed)
C
10/13/2021
Violation issued (HPD, closed)
A
10/13/2021
Violation issued (HPD, closed)
B
10/13/2021
Violation issued (HPD, closed)
C
10/13/2021
Violation issued (HPD, closed)
C
09/02/2021
Signed off — Alteration
B00494922-I1
06/30/2021
Special inspection requirement — Final
Paul Perdek
06/25/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00501068-P1
06/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/12/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00501068-I1
05/12/2021
Permit issued — Sidewalk Shed
B00501068-I1-SH
05/07/2021
Permit issued — General Construction
B00494922-I1-GC
04/15/2021
Violation issued (HPD, closed)
A
04/08/2021
Violation issued (ECB, open)
Elevators
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offD.B. Demolition05/08/2025
DOB NOWPlumbingSigned-offAdvanced Plumbing Mechanical11/18/2024
DOB NOWSidewalk ShedSigned-offProto Restoration Construction05/12/2021
DOB NOWGeneral ConstructionSigned-offPna Contracting05/07/2021
BISOTISSUEDAllstate Restoration03/21/2012
BISEQISSUEDRock Scaffolding03/19/2012
BISOTISSUEDNJK Contracting04/17/2002
BISOTISSUEDNJK Contracting11/01/2001
BISOTISSUEDNJK Contracting03/20/2000
1 project · most recent 05/19/2021
FiledStatusContractorScope
05/19/2021Permit IssuedTop Shelf Electric—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/06/2023Tenant Protection Plan ComplianceSandeep Gunnalaspecial
08/29/2023Concrete - Cast-In-PlaceSandeep Gunnalaspecial
08/29/2023Post-installed AnchorsSandeep Gunnalaspecial
08/18/2023FinalSandeep Gunnalaprogress
06/30/2021FinalPaul Perdekprogress
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00494922-I1Request digital key ↗
09/01/2026B00501068-I1Request digital key ↗
09/01/2026B00501068-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
03/22/2012320438013Open ↗
09/02/2011320341073Open ↗
12/01/2009320085180Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
03/22/2012320438013Open ↗
03/22/2012320341073Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00494922-I1Open ↗
09/01/2026B00501068-I1Open ↗
09/01/2026B00501068-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
05/24/2012320341073Open ↗
03/22/2012320438013Open ↗
09/02/2011320341073Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026B00501068-I1Open ↗
08/22/2026B00921807-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/22/2012320438013Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/22/2012320438013Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026B00921807-I1Open ↗
▸Environmental & Asbestos3
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/02/2011320341073Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/19/2009320085180Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/01/2026B00494922-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
10/26/2011320341073Open ↗
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
09/01/2026B00494922-I1Open ↗
09/01/2026B00501068-I1Open ↗
09/01/2026B00501068-P1Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
03/22/2012320438013Open ↗
07/29/2011320341073Open ↗
10/19/2009320085180Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
05/09/2014320438013Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/09/2014320438013Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/24/2012320341073Open ↗
09/02/2011320341073Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
03/22/2012320438013Open ↗
09/02/2011320341073Open ↗
10/19/2009320085180Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
12/10/2009320085180Open ↗