← Back
BuildNYC
Church, synagogue, chapel
130 WATKINS STREET
BROOKLYN · Brownsville · BIN 3081105
💬 Discuss this project
1930Year Built
3Stories
M1Building Class
R7AZoning
7,950 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Church, synagogue, chapel · Owner of record: The Antioch Church of Our Lord Jesus CHR Ist · 2,650 sf lot · 3 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 21 filing
Floor 1
Cellar1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Christian Crossroads1203/21/2026
Wonderline503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Inga Consulting Engineers102/12/2019
Building Lifecycle
All (25)Filed (1)Violation (14)
11/25/2025
Elevator Category 1 inspection report filed
06/17/2025
Boiler inspection report filed
Initial · no defects · Accepted
11/07/2024
Closed: Stop all work make site safe contact DOB
DOB violation · closed on the city's record
06/04/2024
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
01/30/2024
Boiler inspection report filed
Initial · no defects · Accepted
01/31/2023
Boiler inspection report filed
Initial · no defects · Accepted
02/16/2022
Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed · Issued 2022; DOB's record still lists it as active
02/07/2022
Boiler inspection report filed
Initial · no defects · Accepted
12/23/2021
Elevator Category 5 inspection report filed
11/19/2021
Class 2: provide in-car alarm switch., provide in-car emergency phone., provide top of car hoist rope code date tag., provide top of car governor…
ECB violation · closed
04/26/2021
Boiler inspection report filed
Initial · no defects · Accepted
08/18/2020
Boiler inspection report filed
Initial · no defects · Accepted
12/16/2019
Boiler inspection report filed
Initial · no defects · Accepted
12/03/2019
: failed to conduct requir test/inspection vc 20:
FDNY_NOV violation · closed
02/12/2019
Filed — No Work
B00130102-I1
08/22/2018
Boiler inspection report filed
Initial · no defects · Accepted
10/17/2017
Closed: Violation issued for failure to file annual boiler 2012 inspection report
DOB violation · closed on the city's record
09/21/2017
Closed: Violation issued to elevator-failure to file category 1 2016 inspection/test
DOB violation · closed on the city's record
09/15/2017
Violation issued to elevator-failure to file category 1 2016 inspection/test
DOB violation · closed · Issued 2017; DOB's record still lists it as active
05/15/2014
Violation issued for failure to file annual boiler 2012 inspection report
DOB violation · closed · Issued 2014; DOB's record still lists it as active
02/25/2012
Stop all work make site safe contact DOB
DOB violation · closed · Issued 2012; DOB's record still lists it as active
08/18/2009
Closed: Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed on the city's record
01/19/2007
Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed · Issued 2007; DOB's record still lists it as active
01/06/2006
Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed · Issued 2006; DOB's record still lists it as active
03/19/2003
Plumbing work w/out a permit. Installation of a new 2" gas in basement reducing in size down to 1/2" and running up through all 3 floors and…
ECB violation · closed
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—Samantha Construction—
BIS—Zara Plumbing—
BIS—Zara Plumbing—
BIS—Orion Plumbing & Heating—
BIS—Modern Builders & Contracting—
BIS—B.h.plbg & Heating—
BIS—Pasquale Quaratino—
BIS—Pasquale Quaratino—
BIS—At-T Builders—
BIS—Daffodil General Contracting—
BIS—Pasquale Quaratino—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Place of Assembly1
09/02/2026B00130102-I1Request the plans ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION6
07/10/2025310072373Open ↗
03/25/2024310072373Open ↗
08/12/2019310072373Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
04/09/2024310072373Open ↗
04/09/2024310072373Open ↗
12/28/2015310072373Open ↗
Showing 3 of 5 on file for this type
▸BISPLACE OF ASSEMBLY2
01/22/2019321917128Open ↗
06/28/2016321376881Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/01/2019310072373Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/30/2015310072373Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISRESTRICTION: EASEMENT AGREEMENT1
09/12/2008310072373Open ↗
▸BISVERIFY TAX LOT1
10/07/2025310072373Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
05/13/2008310072373Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/10/2025310072373Open ↗
▸Seals & Professional Certifications4
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/22/2019321917128Open ↗
06/28/2016321376881Open ↗
▸BISPC FULL REPORT1
09/15/2008310072373Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/02/2026B00130102-I1Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/19/2014310072373Open ↗
06/07/2014310072373Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
07/15/2025310072373Open ↗
05/08/2009310072373Open ↗
▸BISSCHEDULE B - PLUMBING1
04/22/2014310072373Open ↗
▸Environmental & Asbestos2
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
05/13/2008310072373Open ↗
01/03/2008310072373Open ↗
▸Inspections & Test Reports6
▸BISMECHANICAL SYSTEMS1
11/13/2024310072373Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/19/2025301659523Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/13/2024310072373Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
09/15/2025310072373Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
09/19/2025301659523Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/13/2024310072373Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/22/2025301659523Open ↗
01/22/2019321917128Open ↗
01/22/2019321917128Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
08/12/2019310072373Open ↗
09/16/2008310072373Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/21/2007310072373Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/22/2025301659523Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
09/02/2026B00130102-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT (FINAL): PW31
11/14/2024310072373Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION2
04/22/2014310072373Open ↗
05/08/2009310072373Open ↗
▸Other Documents2
▸BIS* FIRE STOPS 27-3451
09/19/2025301659523Open ↗
▸DOB NOWApproved Plans with no change in layout1
09/02/2026B00130102-I1Open ↗