← Back
BuildNYC
Elevator cooperative
130 WEST 16TH STREET
MANHATTAN · BIN 1014565
💬 Discuss this project
1927Year Built
6Stories
D4Building Class
R8AZoning
32,384 sfGross Floor Area
42Units
LL97 CoveredRent Stabilized2 Active Violations 2 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: 130 W 16 Owners · 7,744 sf lot · 4.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofJc Dwight INC1p · 1 filing · 3 docs
Floor 2Under Construction3p · 1 filing · 8 docs
Floor 1Heavy duty sidewalk shed installation4p · 1 filing · 4 docs
Site & exteriorHeavy duty sidewalk shed installation9p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
130 West 16 St Owners2003/22/2026
JC Dwight1003/22/2026
130W16OWNERS Corpc Ojcdwightinc603/21/2026
130 West 16th Street303/21/2026
1 R S103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
All City Engineering108/06/2026
Jonathan B. Held AIA Architect108/05/2026
Ashraf201/14/2025
Bond Engineering101/22/2024
Haider Engineering, P.E105/02/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A K Expediting203/21/2026
Municipal Building Consultants103/21/2026
KD Designs203/21/2026
Haider Engineering, P.E103/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arsenal ScaffoldScaffold307/08/2026
RCD RestorationsGeneral Contractor203/21/2026
Irwin Electr'l Contractors, IElectrical203/21/2026
Jeco Electrical ServiceElectrical103/21/2026
Pegasus ElectricalElectrical103/21/2026
KYL ElectricElectrical103/22/2026
Nash Electric ServicesElectrical103/21/2026
Fried Electric CoElectrical103/21/2026
Empire Lic Electrical ContractorsElectrical103/21/2026
Magna-Pro ConstructionGeneral Contractor109/30/2026
Alef Electrical ContractingElectrical103/21/2026
Kings Group NYScaffold107/08/2026
Joey Electrical CoElectrical103/21/2026
RPJ ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services544108/06/2026
Jonathan B. Held AIA Architects1288108/05/2026
Rock Arch Engineering1760201/22/2024
Rock Arch Engineering7831101/22/2024
Building Lifecycle
All (106)Filed (7)Permit Issued (7)Signed Off (2)Facade (FISP) (18)Violation (60)Special Inspection (12)
09/29/2026
Permit issued — General Construction
M01218058-I1-GC
08/06/2026
Filed — Alteration
MECHANICAL FILING DESIGN INCLUDES THE INSTALLATION OF NEW MULTI SPLIT / VRF HEAT PUMPS FOR THE SPACE HEATING AND COOLING OF THE DWELLING UNIT AS WELL AS AN ENERGY RECOVERY VENTILATION UNIT FOR THE VENTILATION OF THE DWELLING UNIT. NO CHANGE IN USE, EGRESS
M01218058-S1
08/05/2026
Filed — Alteration
MECHANICAL FILING DESIGN INCLUDES THE INSTALLATION OF NEW MULTI SPLIT / VRF HEAT PUMPS FOR THE SPACE HEATING AND COOLING OF THE DWELLING UNIT AS WELL AS AN ENERGY RECOVERY VENTILATION UNIT FOR THE VENTILATION OF THE DWELLING UNIT. NO CHANGE IN USE, EGRESS
M01218058-I1
06/24/2025
Cycle 9 facade report signed — SAFE
06/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONATHAN HELD
06/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
JONATHAN HELD
06/14/2025
Special inspection requirement — Energy Code Compliance Inspections
JONATHAN HELD
06/04/2025
Violation issued (HPD, closed)
A
05/06/2025
Special inspection requirement — Interior lighting power
JONATHAN HELD
05/06/2025
Special inspection requirement — Lighting controls
JONATHAN HELD
05/06/2025
Special inspection requirement — Lighting in dwelling units
JONATHAN HELD
04/30/2025
Violation issued (ECB, closed)
Construction
04/29/2025
Special inspection requirement — Final
JONATHAN HELD
04/17/2025
Cycle 9 facade report submitted
04/14/2025
Signed off — Alteration
M01022771-I1
04/10/2025
Cycle 9 facade inspection completed
03/04/2025
Permit issued — Suspended Scaffold
M01022771-I1-SC
01/30/2025
Permit issued — Sidewalk Shed
M00993503-I1-SH
01/14/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00993503-P1
11/22/2024
Violation issued (HPD, closed)
I
11/21/2024
Cycle 9 facade report submitted
11/21/2024
Cycle 9 facade report signed — UNSAFE
11/13/2024
Cycle 9 facade inspection completed
04/11/2024
Permit issued — General Construction
M00958614-I1-GC
04/01/2024
Permit issued — Suspended Scaffold
M01022771-I1-SC
03/20/2024
Filed — Alteration
M01022771-I1
02/22/2024
Cycle 9 facade report signed — UNSAFE
02/19/2024
Cycle 9 facade report submitted
02/19/2024
Cycle 9 facade inspection completed
02/19/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2024
Permit issued — Sidewalk Shed
M00993503-I1-SH
02/01/2024
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00993503-I1
01/22/2024
Filed — Alteration
FACADE REPAIRS NO CHANGE IN USE EGRESS OR OCUUPANCY
M00958614-I1
01/12/2024
Special inspection requirement — Masonry
BRIAN O'CONNOR
01/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
Muhammad Muhaysin
01/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN O'CONNOR
11/06/2023
Special inspection requirement — Final
BRIAN O'CONNOR
02/16/2022
Violation issued (HPD, closed)
A
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/01/2021
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/07/2019
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00161990-I1
07/24/2019
Cycle 8 facade report submitted
07/11/2019
Cycle 8 facade report signed — SWARMP
06/28/2019
Cycle 8 facade inspection completed
06/26/2019
Violation issued (HPD, closed)
B
06/26/2019
Violation issued (HPD, closed)
B
06/26/2019
Violation issued (HPD, closed)
A
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2019
Permit issued — Sidewalk Shed
M00161990-I1-SH
05/02/2019
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00161990-I1
05/02/2019
Special inspection requirement — Final
JAFAR HAIDER
04/30/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/10/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/10/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/21/2017
Violation issued (ECB, closed)
Construction
10/11/2017
Violation issued (ECB, closed)
Unknown
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMagna-Pro Construction09/29/2026
DOB NOWSuspended ScaffoldSigned-offRCD Restorations03/04/2025
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold01/30/2025
DOB NOWGeneral ConstructionPermit IssuedRCD Restorations04/11/2024
DOB NOWSuspended ScaffoldSigned-offRCD Restorations04/01/2024
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold02/02/2024
DOB NOWSidewalk ShedSigned-offKings Group NY05/03/2019
BISOTISSUEDV&S Quality Renovation Co08/28/2018
BISOTISSUEDV&S Quality Renovation Co06/12/2018
BISOTISSUEDDasanti Construction04/13/2018
BISPLISSUEDValley Construction Services03/01/2018
BISOTISSUEDDasanti Construction02/28/2018
BISMHISSUEDM Squared Contractors02/09/2018
BISPLISSUEDAll Pro Plumbing & Heating02/07/2018
BISOTISSUEDM Squared Contractors02/02/2018
BISPLISSUEDDemar Plumbing07/25/2017
BISOTISSUEDPrime Renovations06/22/2017
BISPLISSUEDProto P & H Services07/25/2016
BISOTISSUEDHome Tech Group07/19/2016
BISPLISSUEDBell Fuel Oil11/02/2015
BISPLISSUEDPeter Plumbing Associates09/10/2015
BISPLISSUEDDo Rite Mechanical12/17/2014
BISFSISSUEDAbilene10/30/2014
BISPLISSUEDBell Fuel Oil10/30/2014
BISOTISSUEDPlus K Construction10/09/2014
BISOTISSUEDKevin Bell02/19/2014
BISPLISSUEDDo Rite Mechanical12/04/2013
BISOTISSUEDKevin Bell11/18/2013
BISEQRE-ISSUEDRock Group NY10/25/2013
BISPLISSUEDDumont Plumbing & Heating05/15/2013
BISOTISSUEDYour Building Solution05/07/2013
BISMHISSUEDYour Building Solution05/07/2013
BISOTISSUEDYour Building Solution03/05/2013
BISPLISSUEDSeaview Plumbing07/02/2012
BISOTISSUEDNew York City Construction04/05/2010
BISPLISSUEDSeaview Plumbing02/10/2010
BISOTISSUEDBestco Building Maintenance07/02/2009
BISOTISSUEDDavid Turner Architect06/20/2008
BISOTISSUEDFranco Remodeling01/25/2006
BISEQISSUEDOutdoor Installations01/03/2006
+ 7 more permits on file
1 project · most recent 08/06/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/06/2026Permit IssuedMagna-Pro ConstructionHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXTA48AAVJU 52,000 BTU · Vrf Outdoor ×1
Ventilation
Broan BLP150E75NS-HW 135 CFM · Erv ×2
10 projects · most recent 09/20/2026
General Wiring
FiledStatusContractorScope
09/20/2026Permit IssuedDanube Electric CoGeneral Wiring
08/07/2025CompleteEmpire Lic Electrical ContractorsGeneral Wiring
01/23/2024Permit IssuedNash Electric Services—
01/12/2024Permit IssuedJeco Electrical ServiceGeneral Wiring
08/08/2023CompleteBass ElectricalGeneral Wiring
04/08/2022CompleteKYL ElectricGeneral Wiring
05/03/2019Permit IssuedRichard Neu—
07/03/2018CompleteIrwin Electr'l Contractors, I—
01/31/2018CompleteIrwin Electr'l Contractors, IGeneral Wiring
01/18/2018Permit IssuedIrwin Electr'l Contractors, IGeneral Wiring
1 project · most recent 01/14/2025
Sidewalk Shed
FiledStatusContractorScope
01/14/2025Permit IssuedArsenal ScaffoldSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
06/14/2025Fire-Resistant Penetrations and JointsJONATHAN HELDspecial
06/14/2025Fire-Resistance Rated ConstructionJONATHAN HELDprogress
06/14/2025Energy Code Compliance InspectionsJONATHAN HELDprogress
05/06/2025Interior lighting powerJONATHAN HELDenergy_progress
05/06/2025Lighting controlsJONATHAN HELDenergy_progress
05/06/2025Lighting in dwelling unitsJONATHAN HELDenergy_progress
04/29/2025FinalJONATHAN HELDprogress
01/12/2024MasonryBRIAN O'CONNORspecial
01/12/2024Tenant Protection Plan ComplianceMuhammad Muhaysinspecial
01/12/2024Structural Stability – Alterations of existing buildingsBRIAN O'CONNORspecial
11/06/2023FinalBRIAN O'CONNORprogress
05/02/2019FinalJAFAR HAIDERprogress
▾Documents — 321 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/28/2026M00958614-I1Request digital key ↗
08/27/2026M01022771-I1Request digital key ↗
08/25/2026M00993503-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00161990-I1Request digital key ↗
▸Applications & Permits68
▸BISPLAN / WORK APPROVAL APPLICATION38
02/15/2024121538309Open ↗
12/12/2023121538309Open ↗
12/05/2023121538309Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION30
08/30/2018123587975Open ↗
06/12/2018123587975Open ↗
04/13/2018123357848Open ↗
Showing 3 of 30 on file for this type
▸Seals & Professional Certifications70
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
02/03/2020121839555Open ↗
02/03/2020121839555Open ↗
02/03/2020121839555Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
06/06/2018123587975Open ↗
08/10/2016122836324Open ↗
07/22/2016122836324Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
06/06/2018123587975Open ↗
07/22/2016122836324Open ↗
07/22/2016122836324Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/05/2026M00161990-I1Open ↗
08/25/2026M00993503-P1Open ↗
08/25/2026M00993503-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M00958614-I1Open ↗
08/31/2026M01218058-I1Open ↗
08/31/2026M01218058-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M00958614-I1Open ↗
09/01/2026M00958614-I1Open ↗
09/01/2026M00958614-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/29/2014140273692Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/23/2017140608732Open ↗
▸Trade Schedules & Equipment23
▸BISSELF-CERT PLUMBING NOTICE7
12/24/2015140273692Open ↗
11/04/2015140258254Open ↗
10/27/2015140258254Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
10/10/2019103488708Open ↗
06/26/2018123133019Open ↗
06/11/2018123133019Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING7
02/23/2017140608732Open ↗
Showing 1 of 7 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
07/17/2015140273692Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/29/2014140273692Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES4
03/28/2024121538309Open ↗
02/23/2017140608732Open ↗
06/06/2018123587975Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos17
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
10/10/2019103488708Open ↗
06/06/2018123587975Open ↗
02/27/2018123357848Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026M01218058-I1Open ↗
08/16/2026M01218058-S1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00958614-I1Open ↗
▸Energy Compliance33
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
02/03/2020121839555Open ↗
02/12/2019140608732Open ↗
08/06/2018123133019Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
01/28/2021123587975Open ↗
02/18/2020121839555Open ↗
02/12/2019140608732Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
11/30/2023121538309Open ↗
01/28/2021123587975Open ↗
01/28/2021123587975Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
10/29/2014140273692Open ↗
Showing 1 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLIGHTING IN DWELLING UNITS1
03/21/2024121538309Open ↗
▸BISLIGHTING CONTROLS1
03/21/2024121538309Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/21/2024121538309Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY7
11/30/2023121538309Open ↗
01/28/2021123587975Open ↗
01/28/2021123587975Open ↗
Showing 3 of 7 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/21/2024121538309Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/21/2024121538309Open ↗
▸BISMECHANICAL SYSTEMS1
03/21/2024121538309Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
03/21/2024121538309Open ↗
▸Approvals, Objections & Sign-offs18
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
01/28/2021123587975Open ↗
07/09/2020121839555Open ↗
02/25/2020121839555Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/26/2016140273692Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL1
03/21/2024121538309Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
06/06/2018123587975Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT21
01/28/2021123587975Open ↗
02/25/2020121839555Open ↗
02/12/2019140608732Open ↗
Showing 3 of 21 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
06/12/2018123587975Open ↗
▸Filing & Intake Forms44
▸BISBOROUGH INTAKE FORM15
02/25/2020121839555Open ↗
02/10/2020121839555Open ↗
01/21/2020121839555Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION14
02/15/2024121538309Open ↗
10/15/2020123587975Open ↗
07/26/2018123133019Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING COVER SHEET12
06/06/2018123587975Open ↗
02/27/2018123357848Open ↗
01/04/2018123133019Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
02/23/2017140608732Open ↗
Showing 1 of 3 on file for this type
▸Other Documents4
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01022771-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/05/2026M00161990-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01022771-I1Open ↗