← Back
One story retail building
1300 BURKE AVENUE
BRONX · Pelham Gardens · BIN 2056098
💬 Discuss this project
1962Year Built
1Stories
K1Building Class
R6BZoning
3,652 sfGross Floor Area
2Units
6 Open Violations 5 unresolved · 1 paperwork only ▸
One story retail building · Owner of record: 1300 LLC · 5,425 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1300 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/12/2015$630K—— → —$173/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M B KIM ARCHITECT P C101/25/2023
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M B KIM ARCHITECT P C4257101/25/2023
Building Lifecycle
All (19)Filed (1)Permit Issued (2)Signed Off (1)Violation (10)Inspection (1)Special Inspection (4)
03/05/2026
Violation issued (ECB, closed)
Construction
02/20/2026
Violation issued (ECB, closed)
Construction
05/24/2023
Signed off — Alteration
REPLACE EXISTING 10 HP OIL-FIRED HIGH PRESSURE STEAM BOILER WITH NEW 10 HP OIL-FIRED HIGH PRESSURE STEAM BOILER AT EXISTING BOILER ROOM AT CELLAR. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
X00816345-I1
05/10/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/28/2023
Permit issued — Boiler Equipment
X00816345-I1-BE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/06/2023
Permit issued — Boiler Equipment
X00816345-I1-BE
01/25/2023
Filed — Alteration
REPLACE EXISTING 10 HP OIL-FIRED HIGH PRESSURE STEAM BOILER WITH NEW 10 HP OIL-FIRED HIGH PRESSURE STEAM BOILER AT EXISTING BOILER ROOM AT CELLAR. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
X00816345-I1
01/20/2023
Special inspection requirement — Heating Systems
MOON KIM
01/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
MOON KIM
01/20/2023
Special inspection requirement — Maintenance information
MOON KIM
01/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
MOON KIM
02/24/2010
Violation issued (ECB, closed)
Boilers
02/24/2009
Violation issued (ECB, open)
Boilers
03/30/2004
Violation issued (ECB, closed)
Boilers
05/02/1990
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/1990
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/1990
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/01/1990
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offWASOFF PLBG. & UTL.CO INC04/28/2023
DOB NOWBoiler EquipmentSigned-offWASOFF PLBG. & UTL.CO INC02/06/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/10/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
01/20/2023Heating SystemsMOON KIMspecial
01/20/2023HVAC-R and service water heating system controlsMOON KIMenergy_progress
01/20/2023Maintenance informationMOON KIMenergy_progress
01/20/2023HVAC-R and service water heating equipmentMOON KIMenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026X00816345-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026X00816345-I1Open ↗
09/23/2026X00816345-I1Open ↗
09/23/2026X00816345-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026X00816345-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026X00816345-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026X00816345-I1Open ↗
▸DOB NOWOER: Notice to Proceed1
08/13/2026X00816345-I1Open ↗