← Back
Over six families without stores
1300 HOE AVENUE
BRONX · BIN 2010641
💬 Discuss this project
1914Year Built
5Stories
C1Building Class
R7-1Zoning
18,125 sfGross Floor Area
21Units
Rent Stabilized144 Open Violations ▸
Over six families without stores · Owner of record: BEULAH CLUSTER HOUSING DEVELOPMENT FUND COMPANY · 5,000 sf lot · 3.63 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BEULAH HDFC2707/08/2026
JIMMY G CONSTRUCTION407/08/2026
TRIERA CONTRACTING INC503/22/2026
BEULAH CLUSTER HOUSING DEVELOPMENT FUND COMPANY103/22/2026
NEW HAVEN BEULAH ASSOCIAT103/22/2026
HPD503/21/2026
DEPT.OF REAL ESTATE INREM103/21/2026
BEULAH CLUSTER HDFC403/21/2026
SOUTH BRONX CHURCH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OCV ARCHITECTS903/15/2025
ENTHINK ENGINEERS LLC101/12/2023
SYED ENGINEERING, P.C.103/29/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OCV ARCHITECTS903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONROCK CONSTRUCTION LLCGeneral Contractor507/08/2026
TRIERA CONTRACTING INCGeneral Contractor303/21/2026
PIPE SOLUTIONS ADVIS INCPlumbing207/08/2026
SPEZIALE, JOSEPHElectrical203/21/2026
JIMMY G CONSTRUCTION CORPGeneral Contractor107/08/2026
FRANK MERESHENSKYElectrical103/21/2026
ZEREGA CONTRACTING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE ENGINEERING, PLLC267312/08/2023
Building Lifecycle
All (118)Filed (11)Permit Issued (9)Signed Off (5)Violation (60)Inspection (4)Objection (16)Special Inspection (13)
04/30/2026
Violation issued (HPD, closed)
A
03/18/2026
Violation issued (HPD, closed)
C
03/18/2026
Violation issued (HPD, open)
C
12/13/2025
Violation issued (HPD, closed)
B
12/13/2025
Violation issued (HPD, closed)
B
11/15/2025
Violation issued (HPD, open)
C
11/15/2025
Violation issued (HPD, closed)
C
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
10/22/2025
Violation issued (HPD, closed)
C
10/01/2025
Violation issued (HPD, closed)
C
10/01/2025
Violation issued (HPD, open)
C
10/01/2025
Violation issued (HPD, closed)
B
10/01/2025
Violation issued (HPD, closed)
B
10/01/2025
Violation issued (HPD, closed)
B
10/01/2025
Violation issued (HPD, closed)
B
09/12/2025
Violation issued (HPD, closed)
C
09/10/2025
Violation issued (HPD, closed)
C
08/28/2025
Violation issued (HPD, closed)
B
07/30/2025
Signed off — Alteration
RENOVATION INCLUDES REPAIR OF EXISTING WINDOWS & EXT.DOORS. SPRAY APPLIED RECOVERY OF EXISTING MEMBRANE, MASONRY REPAIR & FACADE WORK. REPAIR EXISTING BOILER TO HIGH EFFICIENCY GAS-FIRED BOILER.NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00606916-S2
07/29/2025
Violation issued (HPD, closed)
B
07/16/2025
Signed off — Alteration
RENOVATION INCLUDES REPAIR OF EXISTING WINDOWS & EXT.DOORS. SPRAY APPLIED RECOVERY OF EXISTING MEMBRANE, MASONRY REPAIR & FACADE WORK. REPAIR EXISTING BOILER TO HIGH EFFICIENCY GAS-FIRED BOILER.NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00606916-S1
06/25/2025
Signed off — Alteration
RENOVATION INCLUDES REPAIR OF EXISTING WINDOWS & EXT.DOORS. SPRAY APPLIED RECOVERY OF EXISTING MEMBRANE, MASONRY REPAIR & FACADE WORK. REPAIR EXISTING BOILER TO HIGH EFFICIENCY GAS-FIRED BOILER.NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00606916-I1
06/09/2025
Permit issued — Plumbing
X00606916-S2-PL
06/01/2025
Violation issued (HPD, closed)
C
05/24/2025
Violation issued (HPD, closed)
A
05/24/2025
Violation issued (HPD, closed)
A
05/24/2025
Violation issued (HPD, closed)
B
05/24/2025
Violation issued (HPD, closed)
A
05/24/2025
Violation issued (HPD, closed)
A
05/24/2025
Violation issued (HPD, closed)
A
05/24/2025
Violation issued (HPD, closed)
A
05/24/2025
Violation issued (HPD, closed)
A
05/24/2025
Violation issued (HPD, closed)
B
05/24/2025
Violation issued (HPD, closed)
B
05/24/2025
Violation issued (HPD, closed)
C
05/24/2025
Violation issued (HPD, closed)
A
05/23/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/03/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X00811646-I1
03/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
03/15/2025
Filed — Alteration
RENOVATION INCLUDES REPAIR OF EXISTING WINDOWS & EXT.DOORS. SPRAY APPLIED RECOVERY OF EXISTING MEMBRANE, MASONRY REPAIR & FACADE WORK. REPAIR EXISTING BOILER TO HIGH EFFICIENCY GAS-FIRED BOILER.NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00606916-P6
03/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/24/2025
Violation issued (HPD, closed)
B
01/24/2025
Violation issued (HPD, closed)
B
01/24/2025
Violation issued (HPD, closed)
B
01/24/2025
Violation issued (HPD, closed)
A
01/24/2025
Violation issued (HPD, closed)
A
01/24/2025
Violation issued (HPD, closed)
C
01/24/2025
Violation issued (HPD, closed)
A
01/24/2025
Violation issued (HPD, closed)
B
01/24/2025
Violation issued (HPD, closed)
B
01/24/2025
Violation issued (HPD, closed)
B
01/24/2025
Violation issued (HPD, closed)
B
01/24/2025
Violation issued (HPD, closed)
B
01/24/2025
Violation issued (HPD, closed)
B
01/24/2025
Violation issued (HPD, closed)
B
11/12/2024
Violation issued (HPD, closed)
B
11/12/2024
Violation issued (HPD, closed)
B
11/12/2024
Violation issued (HPD, closed)
C
11/12/2024
Violation issued (HPD, closed)
B
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZEREGA CONTRACTING CORP06/09/2025
DOB NOWGeneral ConstructionSigned-offCONROCK CONSTRUCTION LLC09/17/2024
DOB NOWGeneral ConstructionSigned-offCONROCK CONSTRUCTION LLC04/11/2024
DOB NOWBoiler EquipmentSigned-offPIPE SOLUTIONS ADVIS INC10/11/2023
DOB NOWPlumbingSigned-offPIPE SOLUTIONS ADVIS INC10/02/2023
DOB NOWGeneral ConstructionSigned-offCONROCK CONSTRUCTION LLC04/24/2023
DOB NOWGeneral ConstructionSigned-offCONROCK CONSTRUCTION LLC02/02/2023
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC01/12/2023
DOB NOWSidewalk ShedSigned-offJIMMY G CONSTRUCTION CORP04/01/2019
BIS—ISSUEDBUILDERS-R-US CONSTRUCTION05/05/2001
BISEQISSUEDCITY SCAFFOLDING CORP01/16/2001
BISEQISSUEDBUILDERS-R-US CONSTRUCTION09/01/2000
BISPLISSUEDHURON INC.08/11/2000
BIS—ISSUEDBUILDERS-R-US CONSTRUCTION06/26/2000
BIS—ISSUEDJ.F. CONTRACTING CORP.06/15/1990
2 projects · most recent 01/12/2023
FiledStatusContractorScope
01/12/2023CompleteRICHARD NEU—
03/29/2019CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/23/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/28/2023Pass-Final Boiler Equipment InspectionPassView ↗
12/27/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/13/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
03/18/2025Tenant Protection Plan ComplianceMatthew Wavrospecial
03/13/2025Tenant Protection Plan Compliance—special
01/30/2024Tenant Protection Plan Compliance—special
12/08/2023Tenant Protection Plan ComplianceMatthew Wavrospecial
08/30/2023Tenant Protection Plan Compliance—special
08/29/2023HVAC-R and service water heating system controlsMatthew Wavroenergy_progress
08/29/2023HVAC-R and service water piping design and insulationMatthew Wavroenergy_progress
08/29/2023HVAC-R and service water heating equipmentMatthew Wavroenergy_progress
08/29/2023Tenant Protection Plan ComplianceMatthew Wavrospecial
08/29/2023Heating SystemsMatthew Wavrospecial
08/29/2023Maintenance informationMatthew Wavroenergy_progress
10/06/2021FinalJOHN COOGANprogress
03/27/2019FinalRAFI HAMIDprogress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch10
08/25/2026X00606916-P6Request digital key ↗
08/25/2026X00606916-P5Request digital key ↗
08/25/2026X00606916-P4Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00147359-I1Request digital key ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/26/2026X00147359-I1Open ↗
08/25/2026X00606916-I1Open ↗
08/25/2026X00606916-P6Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026X00606916-S1Open ↗
09/23/2026X00606916-S1Open ↗
09/23/2026X00606916-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026X00606916-S1Open ↗
09/23/2026X00606916-S1Open ↗
09/01/2026X00606916-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/25/2026X00606916-P6Open ↗
08/25/2026X00606916-P5Open ↗
08/25/2026X00606916-P4Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00606916-S1Open ↗
08/13/2026X00606916-S2Open ↗
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/13/2026X00606916-P1Open ↗
08/13/2026X00606916-I1Open ↗
08/13/2026X00606916-P3Open ↗
Showing 3 of 10 on file for this type