One story retail building
1304 FULTON STREET
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3053753
💬 Discuss this project
1910Year Built
1Stories
K1Building Class
C4-5DZoning
7,600 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: F.H. FULTON RLTY CORP · 8,000 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscape
Roof1p · 1 filing · 20 docs
Floor 121p · 4 filings · 20 docs
Cellar11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DAFNONAS ESTATES407/08/2026
F H FULTON REALTY4307/08/2026
F.H. FULTON RITY CORP C/O103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NATIONAL SIGN AND LIGHTING203/21/2026
PROJECT EXPEDITERS CONSULTING CO.2403/21/2026
ENCORE103/21/2026
K A INTERIOR DESIGN803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VERICON CONSTRUCTION COGeneral Contractor1107/08/2026
H-BUILDER INCGeneral Contractor1007/08/2026
F&G MECHANICAL, INCPlumbing107/08/2026
MPS PLUMBING & HEATING INCPlumbing107/08/2026
NATIONAL MAINTENANCEScaffold107/08/2026
AGGRESSIVE FIRE PROT LLCFire Protection107/08/2026
NATIONAL SIGN LIGHTINGScaffold107/08/2026
SIRINA FIRE PROT CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC423808/07/2025
ALLEN SHINFELD, P.E. PLLC1305301/08/2025
MW PROFESSIONAL ENGINEERI570110/09/2024
Building Lifecycle
All (95)Filed (19)Permit Issued (19)Signed Off (11)Violation (6)Inspection (10)Special Inspection (30)
08/14/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/13/2026
Signed off — Alteration
Install new sprinkler head for Chase Bank.
B01249011-S2
08/13/2026
Signed off — Alteration
Install new sprinkler head for Chase Bank.
B01249011-I1
07/23/2026
Signed off — Alteration
Tenant fit out for Chase Bank. No change to use, egress or occupancy.
B00949619-S3
07/07/2026
Signed off — Alteration
Install new sprinkler head for Chase Bank.
B01249011-S1
07/01/2026
Signed off — Alteration
Tenant fit out for Chase Bank. No change to use, egress or occupancy.
B00949619-S4
02/26/2026
Violation issued (FDNY_NOV, closed)
11/24/2025
Violation issued (FDNY_ORDER, closed)
10/29/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/08/2025
Signed off — Alteration
Tenant fit out for Chase Bank. No change to use, egress or occupancy.
B00949619-I1
10/08/2025
Signed off — Alteration
Tenant fit out for Chase Bank. No change to use, egress or occupancy.
B00949619-S1
08/19/2025
Permit issued — Mechanical Systems
B01249011-I1-MS
08/19/2025
Permit issued — Structural
B01249011-S2-ST
08/15/2025
Special inspection requirement — Final
Young Suh
08/14/2025
Permit issued — Sprinklers
B01249011-S1-EW-SP
08/13/2025
Filed — Alteration
Install new sprinkler head for Chase Bank.
B01249011-P1
08/07/2025
Filed — Alteration
Install new sprinkler head for Chase Bank.
B01249011-S2
08/07/2025
Filed — Alteration
Install new sprinkler head for Chase Bank.
B01249011-I1
08/07/2025
Filed — Alteration
Install new sprinkler head for Chase Bank.
B01249011-S1
08/06/2025
Special inspection requirement — Duct leakage testing, insulation and design
Young Suh
08/06/2025
Special inspection requirement — Interior lighting power
Young Suh
08/06/2025
Special inspection requirement — Lighting controls
Young Suh
07/28/2025
Special inspection requirement — Fenestration areas
Young Suh
07/28/2025
Special inspection requirement — Interior lighting power
Young Suh
07/28/2025
Special inspection requirement — Lighting controls
Young Suh
07/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Young Suh
07/28/2025
Special inspection requirement — Exterior lighting power
Young Suh
07/28/2025
Special inspection requirement — Final
Young Suh
07/28/2025
Special inspection requirement — Insulation placement and R values
Young Suh
07/28/2025
Special inspection requirement — Fenestration air leakage
Young Suh
07/28/2025
Special inspection requirement — Maintenance information
Young Suh
07/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
07/24/2025
Filed — Alteration
Tenant fit out for Chase Bank. No change to use, egress or occupancy.
B00949619-P2
06/30/2025
Special inspection requirement — Final
Young Suh
06/30/2025
Special inspection requirement — Sprinkler Systems
Young Suh
06/30/2025
Special inspection requirement — Mechanical Systems
Young Suh
06/17/2025
Special inspection requirement — Maintenance information
Young Suh
06/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Young Suh
06/17/2025
Special inspection requirement — Fenestration areas
Young Suh
06/17/2025
Special inspection requirement — Lighting controls
Young Suh
06/17/2025
Special inspection requirement — Fenestration air leakage
Young Suh
06/17/2025
Special inspection requirement — Interior lighting power
Young Suh
06/17/2025
Special inspection requirement — Insulation placement and R values
Young Suh
06/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
06/17/2025
Special inspection requirement — Final
Young Suh
06/17/2025
Special inspection requirement — Exterior lighting power
Young Suh
06/10/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING STORE ON 1ST FLOOR AS PER PLAN, DIRECT REPLACE EXISTING ELECTRIC HVAC ON ROOF AND 1ST FLOOR, EXISTING DUCT TO REMAIN. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
B01118997-S1
05/23/2025
Permit issued — General Construction
B00949619-I1-GC
05/23/2025
Permit issued — Structural
B00949619-S1-ST
02/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/26/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING STORE ON 1ST FLOOR AS PER PLAN, DIRECT REPLACE EXISTING ELECTRIC HVAC ON ROOF AND 1ST FLOOR, EXISTING DUCT TO REMAIN. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
B01118997-S2
01/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/09/2025
Permit issued — General Construction
B00949619-I1-GC
01/08/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING STORE ON 1ST FLOOR AS PER PLAN, DIRECT REPLACE EXISTING ELECTRIC HVAC ON ROOF AND 1ST FLOOR, EXISTING DUCT TO REMAIN. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
B01118997-P1
01/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLEN SHINFELD
12/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/07/2024
Permit issued — Plumbing
B01118997-S1-PL
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offVERICON CONSTRUCTION CO08/19/2025
DOB NOWStructuralSigned-offVERICON CONSTRUCTION CO08/19/2025
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP08/14/2025
DOB NOWGeneral ConstructionSigned-offVERICON CONSTRUCTION CO05/23/2025
DOB NOWStructuralSigned-offVERICON CONSTRUCTION CO05/23/2025
DOB NOWGeneral ConstructionSigned-offVERICON CONSTRUCTION CO01/09/2025
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN11/07/2024
DOB NOWStructuralSigned-offH-BUILDER INC10/15/2024
DOB NOWMechanical SystemsPermit IssuedH-BUILDER INC10/10/2024
DOB NOWMechanical SystemsSigned-offH-BUILDER INC10/10/2024
DOB NOWConstruction FenceSigned-offH-BUILDER INC10/10/2024
DOB NOWSignPermit IssuedNATIONAL MAINTENANCE, INC06/06/2024
DOB NOWSprinklersSigned-offAGGRESSIVE FIRE PROT LLC03/20/2024
DOB NOWSprinklersPermit IssuedF&G MECHANICAL, INC02/12/2024
DOB NOWGeneral ConstructionSigned-offVERICON CONSTRUCTION CO12/29/2023
DOB NOWStructuralSigned-offVERICON CONSTRUCTION CO12/29/2023
DOB NOWConstruction FenceSigned-offVERICON CONSTRUCTION CO12/29/2023
DOB NOWMechanical SystemsSigned-offVERICON CONSTRUCTION CO12/29/2023
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC06/28/2019
3 projects · most recent 08/13/2025
Heating and Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
08/13/2025Signed-offVERICON CONSTRUCTION COOthers
Other
__Junk__ 111 150 CFM · Fan Coil Indoor ×2
07/24/2025Signed-offVERICON CONSTRUCTION COHeating and Air Conditioning Systems
Heat / Cool
Trane PEFY-P36NMAU-E4 289,502 BTU · Vrf Indoor ×9
PUZ-A12NKA7 22,389 BTU · Condensing Unit ×2
OABE084A3-C1B401KG-D3F00AF AKE4B20C0A4A0 2,094 tons · Rooftop Unit ×1
PEAD-A12AA7 19,310 BTU · Vrf Indoor ×1
PKA-A24KA7.TH 22,389 BTU · Vrf Indoor ×1
PURY-EP168TNU-A 289,502 BTU · Vrf Outdoor ×1
01/08/2025Signed-offH-BUILDER INCHeating and Air Conditioning Systems
Heat / Cool
Carrier 24SCA460N301 ( PRODUCT NUMBER 24SCA460N0030103 ) 5 tons · Condensing Unit ×1
58SBOB135M24--20 5 tons · Furnace ×1
2 projects · most recent 08/13/2025
FiledStatusContractorScope
08/13/2025Signed-offSIRINA FIRE PROT CORP4 heads
07/24/2025Signed-offAGGRESSIVE FIRE PROT LLC—
3 projects · most recent 08/13/2025
Gas Water/Sanitary
FiledStatusContractorScope
08/13/2025———
07/24/2025Permit IssuedF&G MECHANICAL, INCGas, Water/Sanitary
01/08/2025Signed-offMPS PLUMBING & HEATING INGas
6 projects · most recent 07/24/2025
General Wiring
FiledStatusContractorScope
07/24/2025CompleteUNITY ELECTRIC CO. INCGeneral Wiring
06/07/2024Permit IssuedHOME RUN ELECTRIC—
04/12/2024CompleteADCO ELEC'L CORPGeneral Wiring
07/24/2019Permit IssuedNATIONAL MAINT. INC—
05/07/2019CompleteMADISON ELECTRIC, INCGeneral Wiring
01/23/2019CompleteMADISON ELECTRIC, INC—
3 projects · most recent 08/13/2025
Steel Concrete
FiledStatusContractorScope
08/13/2025Signed-offVERICON CONSTRUCTION CO2 scope_items
07/24/2025Signed-offVERICON CONSTRUCTION COSteel
01/08/2025Signed-offMPS PLUMBING & HEATING INSteel, Concrete
2 projects · most recent 07/24/2025
Fence
FiledStatusContractorScope
07/24/2025Signed-offVERICON CONSTRUCTION COFence
01/08/2025Signed-offMPS PLUMBING & HEATING INFence
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/14/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
08/15/2025FinalYoung Suhprogress
08/06/2025Duct leakage testing, insulation and designYoung Suhenergy_progress
08/06/2025Interior lighting powerYoung Suhenergy_progress
08/06/2025Lighting controlsYoung Suhenergy_progress
07/28/2025Fenestration areasYoung Suhenergy_progress
07/28/2025Interior lighting powerYoung Suhenergy_progress
07/28/2025Lighting controlsYoung Suhenergy_progress
07/28/2025Fenestration and door U-factor and product ratingsYoung Suhenergy_progress
07/28/2025Exterior lighting powerYoung Suhenergy_progress
07/28/2025FinalYoung Suhprogress
07/28/2025Insulation placement and R valuesYoung Suhenergy_progress
07/28/2025Fenestration air leakageYoung Suhenergy_progress
07/28/2025Maintenance informationYoung Suhenergy_progress
07/28/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
06/30/2025FinalYoung Suhprogress
06/30/2025Sprinkler SystemsYoung Suhspecial
06/30/2025Mechanical SystemsYoung Suhspecial
06/17/2025Maintenance informationYoung Suhenergy_progress
06/17/2025Fenestration and door U-factor and product ratingsYoung Suhenergy_progress
06/17/2025Fenestration areasYoung Suhenergy_progress
06/17/2025Lighting controlsYoung Suhenergy_progress
06/17/2025Fenestration air leakageYoung Suhenergy_progress
06/17/2025Interior lighting powerYoung Suhenergy_progress
06/17/2025Insulation placement and R valuesYoung Suhenergy_progress
06/17/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
Latest 25 of 55.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
J.P. Morgan ChaseOfficeFloor 1
Project B01249011 Alteration · LOC Issued · 08/07/2025
JPMorgan Chase BankRetailCellar, Floor 1
Project B00949619 Alteration · Permit Entire · 11/13/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch17
08/24/2026B01041834-I1Request digital key ↗
08/23/2026B01118997-S1Request digital key ↗
08/23/2026B01118997-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/24/2026B01074670-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/02/2026B00160512-I1Request digital key ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026B01249011-I1Open ↗
09/23/2026B01249011-I1Open ↗
09/23/2026B01249011-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/02/2026B00160512-I1Open ↗
08/24/2026B01074670-I1Open ↗
08/23/2026B01118997-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026B01249011-I1Open ↗
09/23/2026B01249011-S1Open ↗
09/01/2026B01118997-I1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/02/2026B00160512-I1Open ↗
08/23/2026B01118997-P1Open ↗
08/23/2026B01118997-S3Open ↗
Showing 3 of 15 on file for this type