← Back
Two family frame
1304 HERKIMER STREET
BROOKLYN · Ocean Hill · BIN 3042616
💬 Discuss this project
1901Year Built
2Stories
B2Building Class
R5Zoning
1,188 sfGross Floor Area
2Units
Two family frame · 1,280 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 21p · 1 filing · 16 docs
Floor 1
Cellar1p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BNM HOLDINGS1107/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/26/2024$1.3M—1304 HERKIMER LLC → Private party$1,094/sf building
08/10/2023$550K—Private party → 1304 HERKIMER LLC$463/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC302/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING SOLUTIONS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor303/21/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415202/22/2024
Building Lifecycle
All (41)Filed (3)Permit Issued (2)Signed Off (2)Inspection (4)Special Inspection (30)
10/25/2024
Signed off — Alteration
HEREWITH FILING TO PROPOSED TO RELAMINATE EXISTING WALLS, NEW GYP BOARD, REPLACE WINDOWS & ALL FINISHES AS PER PLANS; EXISTING 2 STORY WITH BASEMENT 2 FAMILY DWELLING. NO CHANGE IN USE, BULK, OCCUPANCY, OR EGRESS
B00954114-S1
09/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/24/2024
Signed off — Alteration
HEREWITH FILING TO PROPOSED TO RELAMINATE EXISTING WALLS, NEW GYP BOARD, REPLACE WINDOWS & ALL FINISHES AS PER PLANS; EXISTING 2 STORY WITH BASEMENT 2 FAMILY DWELLING. NO CHANGE IN USE, BULK, OCCUPANCY, OR EGRESS
B00954114-I1
07/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/09/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/06/2024
Permit issued — Plumbing
B00954114-S1-PL
02/26/2024
Filed — Alteration
HEREWITH FILING TO PROPOSED TO RELAMINATE EXISTING WALLS, NEW GYP BOARD, REPLACE WINDOWS & ALL FINISHES AS PER PLANS; EXISTING 2 STORY WITH BASEMENT 2 FAMILY DWELLING. NO CHANGE IN USE, BULK, OCCUPANCY, OR EGRESS
B00954114-S1
02/26/2024
Permit issued — General Construction
B00954114-I1-GC
02/23/2024
Special inspection requirement — Lighting controls
JEFFREY BELL
02/23/2024
Special inspection requirement — Fenestration areas
JEFFREY BELL
02/23/2024
Special inspection requirement — Fenestration air leakage
JEFFREY BELL
02/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
JEFFREY BELL
02/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
02/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
02/23/2024
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
02/23/2024
Special inspection requirement — Final
JEFFREY BELL
02/23/2024
Special inspection requirement — Air barrier - visual inspection
JEFFREY BELL
02/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
JEFFREY BELL
02/23/2024
Special inspection requirement — Lighting in dwelling units
JEFFREY BELL
02/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JEFFREY BELL
02/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JEFFREY BELL
02/23/2024
Special inspection requirement — Insulation placement and R values
JEFFREY BELL
02/23/2024
Special inspection requirement — Interior lighting power
JEFFREY BELL
02/23/2024
Special inspection requirement — Maintenance information
JEFFREY BELL
02/23/2024
Special inspection requirement — Permanent certificate
JEFFREY BELL
02/22/2024
Filed — Alteration
HEREWITH FILING TO PROPOSED TO RELAMINATE EXISTING WALLS, NEW GYP BOARD, REPLACE WINDOWS & ALL FINISHES AS PER PLANS; EXISTING 2 STORY WITH BASEMENT 2 FAMILY DWELLING. NO CHANGE IN USE, BULK, OCCUPANCY, OR EGRESS
B00954114-P1
02/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
02/14/2024
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
02/14/2024
Special inspection requirement — Final
DOYUN KIM
02/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
02/14/2024
Special inspection requirement — Fenestration areas
DOYUN KIM
02/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DOYUN KIM
02/14/2024
Special inspection requirement — Air barrier - visual inspection
DOYUN KIM
02/14/2024
Special inspection requirement — Lighting controls
DOYUN KIM
02/14/2024
Special inspection requirement — Lighting in dwelling units
DOYUN KIM
02/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
DOYUN KIM
02/14/2024
Special inspection requirement — Fenestration air leakage
DOYUN KIM
02/14/2024
Special inspection requirement — Insulation placement and R values
DOYUN KIM
02/14/2024
Special inspection requirement — Maintenance information
DOYUN KIM
11/07/2023
Filed — Alteration
HEREWITH FILING TO PROPOSED TO RELAMINATE EXISTING WALLS, NEW GYP BOARD, REPLACE WINDOWS & ALL FINISHES AS PER PLANS; EXISTING 2 STORY WITH BASEMENT 2 FAMILY DWELLING. NO CHANGE IN USE, BULK, OCCUPANCY, OR EGRESS
B00954114-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC03/06/2024
DOB NOWGeneral ConstructionSigned-offNYC BUILDING SOLUTIONS CO02/26/2024
1 project · most recent 08/27/2024
General Wiring
FiledStatusContractorScope
08/27/2024CompleteK.A.B. ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
02/23/2024Lighting controlsJEFFREY BELLenergy_progress
02/23/2024Fenestration areasJEFFREY BELLenergy_progress
02/23/2024Fenestration air leakageJEFFREY BELLenergy_progress
02/23/2024HVAC-R and service water heating equipmentJEFFREY BELLenergy_progress
02/23/2024Fire-Resistant Penetrations and JointsDOYUN KIMspecial
02/23/2024Fire-Resistance Rated ConstructionDOYUN KIMprogress
02/23/2024Energy Code Compliance InspectionsDOYUN KIMprogress
02/23/2024FinalJEFFREY BELLprogress
02/23/2024Air barrier - visual inspectionJEFFREY BELLenergy_progress
02/23/2024HVAC-R and service water heating system controlsJEFFREY BELLenergy_progress
02/23/2024Lighting in dwelling unitsJEFFREY BELLenergy_progress
02/23/2024HVAC-R and service water piping design and insulationJEFFREY BELLenergy_progress
02/23/2024Fenestration and door U-factor and product ratingsJEFFREY BELLenergy_progress
02/23/2024Insulation placement and R valuesJEFFREY BELLenergy_progress
02/23/2024Interior lighting powerJEFFREY BELLenergy_progress
02/23/2024Maintenance informationJEFFREY BELLenergy_progress
02/23/2024Permanent certificateJEFFREY BELLenergy_progress
02/14/2024Fire-Resistant Penetrations and JointsDOYUN KIMspecial
02/14/2024Energy Code Compliance InspectionsDOYUN KIMprogress
02/14/2024FinalDOYUN KIMprogress
02/14/2024Fire-Resistance Rated ConstructionDOYUN KIMprogress
02/14/2024Fenestration areasDOYUN KIMenergy_progress
02/14/2024HVAC-R and service water piping design and insulationDOYUN KIMenergy_progress
02/14/2024Air barrier - visual inspectionDOYUN KIMenergy_progress
02/14/2024Lighting controlsDOYUN KIMenergy_progress
Latest 25 of 34.
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026B00954114-P1Request digital key ↗
08/26/2026B00954114-I1Request digital key ↗
08/26/2026B00954114-S1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B00954114-I1Open ↗
09/01/2026B00954114-I1Open ↗
09/01/2026B00954114-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026B00954114-I1Open ↗
08/26/2026B00954114-P1Open ↗
08/26/2026B00954114-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00954114-I1Open ↗
08/29/2026B00954114-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026B00954114-I1Open ↗
08/26/2026B00954114-S1Open ↗
08/26/2026B00954114-P1Open ↗