← Back
Over six families without stores
1305 FINDLAY AVENUE
BRONX · Mount Eden-Claremont (West) · BIN 2007214
💬 Discuss this project
1930Year Built
2Stories
C1Building Class
R7-1Zoning
4,297 sfGross Floor Area
10Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 1305 FINDLAY AVE LLC · 3,500 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionGeneralOther
Floor 211p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Cellar16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY CREATIVE DEVELOPERS2007/08/2026
1305 FINDLAY AVE LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/24/2023$1.1M—Private party → 1305 FINDLAY AVE LLC$268/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT107/19/2026
ADB ASSOCIATES602/20/2024
VASILIOS ARTEMIOU PE108/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH CONSTRUCTION CORPGeneral Contractor307/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616702/20/2024
Building Lifecycle
All (89)Filed (8)Permit Issued (4)Signed Off (3)Violation (17)Inspection (8)Objection (19)Special Inspection (30)
07/19/2026
Filed — Alteration
(please assign to dev hub to the same examiner as job # X01243818-I1 as this is in conjunction with the NB.) NO WORK APPLICATION FILED TO UPDATE METES AND BOUNDS, MERGING ZONING LOT 76, 78, 80, AND 84, REMAINING SEPARATE TAX LOTS.
X01425932-I1
07/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/02/2026
Special inspection requirement — Final
06/25/2026
Violation issued (HPD, open)
B
06/25/2026
Violation issued (HPD, open)
A
06/25/2026
Violation issued (HPD, open)
B
06/25/2026
Violation issued (HPD, open)
B
01/23/2026
Violation issued (HPD, closed)
C
01/23/2026
Violation issued (HPD, closed)
C
01/23/2026
Violation issued (HPD, closed)
C
11/17/2025
Violation issued (HPD, closed)
I
09/24/2025
Violation issued (HPD, open)
B
09/24/2025
Violation issued (HPD, closed)
A
09/24/2025
Violation issued (HPD, closed)
B
02/01/2025
Violation issued (HPD, closed)
C
02/01/2025
Violation issued (HPD, closed)
A
02/01/2025
Violation issued (HPD, closed)
C
02/01/2025
Violation issued (HPD, closed)
C
02/01/2025
Violation issued (HPD, closed)
C
02/01/2025
Violation issued (HPD, closed)
C
08/20/2024
Signed off — Alteration CO
Filing to install MS system subsequent to primary application X00893879-I1
X00893879-S4
03/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/27/2024
Signed off — Alteration CO
Filing to install MS system subsequent to primary application X00893879-I1
X00893879-S1
02/26/2024
Signed off — Alteration CO
Filing to install MS system subsequent to primary application X00893879-I1
X00893879-S3
02/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/22/2024
Special inspection requirement — Final
FAHAD FATEH
02/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/22/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
02/22/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
02/22/2024
Special inspection requirement — Heating Systems
FAHAD FATEH
02/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
02/20/2024
Filed — Alteration CO
Filing to install MS system subsequent to primary application X00893879-I1
X00893879-P2
02/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/19/2024
Special inspection requirement — Heating Systems
FAHAD FATEH
02/19/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
02/19/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
02/19/2024
Special inspection requirement — Final
FAHAD FATEH
02/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
02/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/14/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/13/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/13/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/13/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/09/2024
Filed — Alteration CO
Filing to install MS system subsequent to primary application X00893879-I1
X00893879-P1
02/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/05/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
02/05/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
02/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
02/05/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/06/2023
Permit issued — Plumbing
X00893879-S4-PL
11/30/2023
Permit issued — Mechanical Systems
X00893879-S1-MS
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN12/06/2023
DOB NOWMechanical SystemsSigned-offMJH CONSTRUCTION CORP11/30/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC11/27/2023
DOB NOWGeneral ConstructionPermit IssuedMJH CONSTRUCTION CORP11/21/2023
BISPLISSUEDVAN-B PLBG HTG CO. INC07/29/1996
1 project · most recent 02/20/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/20/2024Signed-offMJH CONSTRUCTION CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RX12BXVJU 170,800 BTU · Heat Pump Outdoor ×7
2MXS18WMVJU9 36,900 BTU · Heat Pump Outdoor ×1
3MXS24WMVJU9 48,000 BTU · Condensing Unit ×1
4MXS36WMVJU9 72,000 BTU · Condensing Unit ×1
Ventilation
Nutone AEN110 50 CFM · Exhaust Fan ×10
QTXEN150 100 CFM · Kitchen Exhaust ×10
1 project · most recent 02/20/2024
Sprinkler System
FiledStatusContractorScope
02/20/2024Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 02/20/2024
Water/Sanitary
FiledStatusContractorScope
02/20/2024Signed-offA M B MECHANICAL INCWater/Sanitary
1 project · most recent 07/10/2024
General Wiring
FiledStatusContractorScope
07/10/2024CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/13/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/13/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/13/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
07/13/2026Tenant Protection Plan Compliance—special
07/02/2026Final—progress
02/22/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
02/22/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
02/22/2024FinalFAHAD FATEHprogress
02/22/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/22/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/22/2024Post-installed AnchorsFAHAD FATEHspecial
02/22/2024Mechanical SystemsFAHAD FATEHspecial
02/22/2024Heating SystemsFAHAD FATEHspecial
02/22/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
02/19/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/19/2024Heating SystemsFAHAD FATEHspecial
02/19/2024Mechanical SystemsFAHAD FATEHspecial
02/19/2024Post-installed AnchorsFAHAD FATEHspecial
02/19/2024FinalFAHAD FATEHprogress
02/19/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
02/19/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
02/19/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/19/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
02/05/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/05/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/05/2024Maintenance informationFAHAD FATEHenergy_progress
02/05/2024Permanent certificateFAHAD FATEHenergy_progress
02/05/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
Latest 25 of 51.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026X00893879-P2Request digital key ↗
08/21/2026X00893879-P1Request digital key ↗
08/21/2026X00893879-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00893879-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature10
09/29/2026X00893879-S2Open ↗
09/29/2026X00893879-S2Open ↗
09/26/2026X00893879-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026X00893879-P2Open ↗
08/21/2026X00893879-P1Open ↗
08/21/2026X00893879-S4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/29/2026X00893879-S2Open ↗
09/26/2026X00893879-P1Open ↗
09/19/2026X00893879-S1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026X00893879-P2Open ↗
08/21/2026X00893879-P1Open ↗
08/21/2026X00893879-S1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/21/2026X00893879-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00893879-I1Open ↗