← Back
Primarily 2 family with 1 store or office
1307 SHEEPSHEAD BAY ROAD
💬 Discuss this project
1925Year Built
2Stories
S2Building Class
R4Zoning
2,640 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · 1,705 sf lot · 1.55 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Floor 19p · 2 filings · 20 docs
Cellar4p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NASIR J, KHANZADA LLC1007/19/2023
ASKON ARCHITECTS, P.C.106/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NASIR J. KHANZADA LLC2003/21/2026
LIQUID DESIGN STUDIO & ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MEDRA EXHAUST SYSTEMS CORGeneral Contractor303/21/2026
AZM HOME IMPROVEMENTS INCGeneral Contractor107/08/2026
LIONHEART CONSTRUCTION COGeneral Contractor107/08/2026
GREGG NY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NASIR J. KHANZADA LLC1527907/19/2023
Building Lifecycle
All (92)Filed (11)Permit Issued (4)Signed Off (3)Violation (16)Inspection (5)Objection (32)Special Inspection (21)
03/17/2026
Violation issued (FDNY_ORDER, closed)
03/17/2026
Violation issued (FDNY_ORDER, closed)
03/17/2026
Violation issued (FDNY_ORDER, closed)
03/17/2026
Violation issued (FDNY_ORDER, closed)
03/17/2026
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
04/18/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/08/2024
Signed off — Alteration
SUBSEQUENT FILING FORINSTALLATION OF COMMERCIALKITCHEN HOOD AND DUCT TO THEFIRST FLOOR FOR RESTAURANT
B08051839-S1
04/05/2024
Signed off — Alteration
APPLICATION FILED TO INSTALLPLUMBING FIXTURE IN CONJUNCTIONWITH ALT-2 B08051839-I1 FILING FOR INTERIORRENOVATION OF EXISTING STORE
B08051779-I1
07/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
07/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
07/19/2023
Filed — Alteration
APPLICATION FILED TO INSTALLPLUMBING FIXTURE IN CONJUNCTIONWITH ALT-2 B08051839-I1 FILING FOR INTERIORRENOVATION OF EXISTING STORE
B08051779-P7
06/23/2023
Filed — Alteration
APPLICATION FILED TO INSTALLPLUMBING FIXTURE IN CONJUNCTIONWITH ALT-2 B08051839-I1 FILING FOR INTERIORRENOVATION OF EXISTING STORE
B08051779-P6
06/20/2023
Filed — Alteration
APPLICATION FILED TO INSTALLPLUMBING FIXTURE IN CONJUNCTIONWITH ALT-2 B08051839-I1 FILING FOR INTERIORRENOVATION OF EXISTING STORE
B08051779-P5
04/11/2023
Filed — Alteration
APPLICATION FILED TO INSTALLPLUMBING FIXTURE IN CONJUNCTIONWITH ALT-2 B08051839-I1 FILING FOR INTERIORRENOVATION OF EXISTING STORE
B08051779-P4
04/07/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/03/2023
Filed — Alteration
APPLICATION FILED TO INSTALLPLUMBING FIXTURE IN CONJUNCTIONWITH ALT-2 B08051839-I1 FILING FOR INTERIORRENOVATION OF EXISTING STORE
B08051779-P3
04/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
04/03/2023
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
03/28/2023
Permit issued — Plumbing
B08051779-I1-PL
03/23/2023
Objection raised — Other
03/23/2023
Objection resolved — Addressed
03/23/2023
Objection raised — Other
03/23/2023
Objection resolved — Addressed
03/23/2023
Objection raised — Other
03/23/2023
Objection resolved — Addressed
03/23/2023
Objection raised — Other
03/23/2023
Objection resolved — Addressed
03/22/2023
Filed — Alteration
APPLICATION FILED TO INSTALLPLUMBING FIXTURE IN CONJUNCTIONWITH ALT-2 B08051839-I1 FILING FOR INTERIORRENOVATION OF EXISTING STORE
B08051779-P2
03/17/2023
Permit issued — Mechanical Systems
B08051839-S1-MS
03/14/2023
Filed — Alteration
APPLICATION FILED TO INSTALLPLUMBING FIXTURE IN CONJUNCTIONWITH ALT-2 B08051839-I1 FILING FOR INTERIORRENOVATION OF EXISTING STORE
B08051779-P1
03/07/2023
Objection raised — Scope
03/07/2023
Objection resolved — Addressed
02/27/2023
Objection raised — Inspections
02/27/2023
Objection resolved — Addressed
02/27/2023
Objection raised — Mechanical
02/27/2023
Objection resolved — Addressed
02/27/2023
Objection raised — Scope
02/27/2023
Objection resolved — Addressed
02/27/2023
Objection raised — Scope
02/27/2023
Objection resolved — Addressed
02/23/2023
Filed — Alteration
SUBSEQUENT FILING FORINSTALLATION OF COMMERCIALKITCHEN HOOD AND DUCT TO THEFIRST FLOOR FOR RESTAURANT
B08051839-S1
02/10/2023
Permit issued — Mechanical Systems
B08051839-I1-GC-CX
02/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/10/2023
Special inspection requirement — Energy Code Compliance Inspections
02/10/2023
Special inspection requirement — Mechanical Systems
Nasir Khanzada
02/10/2023
Special inspection requirement — Final
Nasir Khanzada
01/25/2023
Signed off — Alteration
Application filed to remove wood frame canopy at the rear of the building in order to resolve ECB violation. No change in use, egress & occupancy.
B00707988-I1
01/20/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/20/2023
Special inspection requirement — Duct leakage testing, insulation and design
Nasir Khanzada
01/19/2023
Filed — Alteration
APPLICATION FILED TO INSTALLPLUMBING FIXTURE IN CONJUNCTIONWITH ALT-2 B08051839-I1 FILING FOR INTERIORRENOVATION OF EXISTING STORE
B08051779-I1
12/20/2022
Objection raised — Scope
12/20/2022
Objection resolved — Addressed
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC03/28/2023
DOB NOWMechanical SystemsSigned-offMEDRA EXHAUST SYSTEMS COR03/17/2023
DOB NOWMechanical SystemsPermit IssuedAZM HOME IMPROVEMENTS02/10/2023
DOB NOWGeneral ConstructionSigned-offLIONHEART CONSTRUCTION CO08/16/2022
1 project · most recent 02/23/2023
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/23/2023Signed-offMEDRA EXHAUST SYSTEMS CORHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane TYSC060G3 210,000 BTU · Chiller ×1
Ventilation
Captiveaire BDV 24 22,500 CFM · Exhaust Fan ×1
1 project · most recent 02/13/2023
General Wiring
FiledStatusContractorScope
02/13/2023Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/18/2024Fail-Final General Construction Non-Directive 14FailView ↗
04/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/20/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/20/2023Energy Code Compliance InspectionsNasir Khanzadaprogress
07/20/2023Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
04/03/2023Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
04/03/2023Energy Code Compliance InspectionsNasir Khanzadaprogress
02/10/2023Fire-Resistant Penetrations and Joints—special
02/10/2023Energy Code Compliance Inspections—progress
02/10/2023Mechanical SystemsNasir Khanzadaspecial
02/10/2023FinalNasir Khanzadaprogress
01/20/2023Duct leakage testing, insulation and designNasir Khanzadaenergy_progress
12/08/2022Fire-Resistance Rated ConstructionNasir Khanzadaprogress
12/08/2022HVAC-R and service water heating system controlsNasir Khanzadaenergy_progress
12/08/2022HVAC-R and service water heating equipmentNasir Khanzadaenergy_progress
12/08/2022Lighting controlsNasir Khanzadaenergy_progress
12/08/2022Maintenance informationNasir Khanzadaenergy_progress
12/08/2022HVAC-R and service water piping design and insulationNasir Khanzadaenergy_progress
12/08/2022Interior lighting powerNasir Khanzadaenergy_progress
12/08/2022Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
12/08/2022Mechanical SystemsNasir Khanzadaspecial
12/08/2022Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
12/08/2022Energy Code Compliance InspectionsNasir Khanzadaprogress
12/08/2022FinalNasir Khanzadaprogress
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/29/2026B00707988-I1Request digital key ↗
08/27/2026B08051779-P4Request digital key ↗
08/27/2026B08051779-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/29/2026B00707988-I1Open ↗
08/27/2026B08051839-I1Open ↗
08/27/2026B08051839-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/29/2026B08051839-I1Open ↗
08/29/2026B08051839-I1Open ↗
08/28/2026B08051839-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026B08051839-I1Open ↗
08/28/2026B08051839-S1Open ↗
08/24/2026B08051779-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/29/2026B00707988-I1Open ↗
08/27/2026B08051779-P4Open ↗
08/27/2026B08051779-P3Open ↗
Showing 3 of 11 on file for this type