← Back
BuildNYC
Auto body / collision or auto repair
1308 EDWARD L GRANT HIGHWAY
BRONX · BIN 2008639
💬 Discuss this project
1920Year Built
2Stories
G2Building Class
M1-2Zoning
18,680 sfGross Floor Area
1Units
0 Active Violations
Auto body / collision or auto repair · Owner of record: 1308 Real Estate · 10,964 sf lot · 1.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofColumbus Center for Medical Rehabilitation71p · 1 filing · 20 docs
BulkheadColumbus Center for Medical Rehabilitation1p · 1 filing · 20 docs
Floor 1Columbus Center for Medical Rehabilitation99p · 5 filings · 20 docs
CellarColumbus Center for Medical Rehabilitation78p · 1 filing · 20 docs
BasementColumbus Center for Medical Rehabilitation90p · 1 filing · 20 docs
Site & exteriorColumbus Center for Medical Rehabilitation, Columbus Medical30p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1308 Real Estate6908/28/2026
Daveroc Associates403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/21/2022$4.4M—— → —$236/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Somma Design Consulting4003/21/2026
Building Brothers803/21/2026
SNR Expediting Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BH Design GroupGeneral Contractor1107/08/2026
BH Design GroupScaffold604/09/2026
PFL MechanicalPlumbing307/08/2026
JascoScaffold303/21/2026
N.Y. Sign ArtSign hanger207/08/2026
Grushinsky Pipng & HeatingFire Protection207/08/2026
NY Sign Artspecialty_contractor207/08/2026
L J Electrical ServiceElectrical103/21/2026
Jimenez LuisElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Municipal Testing Laborat2302308/25/2026
Building Lifecycle
All (174)Filed (29)Permit Issued (21)Signed Off (12)Violation (16)Inspection (9)Objection (57)Special Inspection (30)
08/26/2026
Objection raised — Scope
08/25/2026
Filed — Alteration CO
Subsequent structural work.
X00638370-A6
08/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
STEPHEN LATUS
08/24/2026
Special inspection requirement — Interior lighting power
STEPHEN LATUS
08/24/2026
Special inspection requirement — Air barrier - visual inspection
STEPHEN LATUS
08/24/2026
Special inspection requirement — Electrical motors and elevators
STEPHEN LATUS
08/24/2026
Special inspection requirement — Insulation placement and R values
STEPHEN LATUS
08/24/2026
Special inspection requirement — Lighting controls
STEPHEN LATUS
04/14/2026
Signed off — Alteration CO
Subsequent structural work.
X00638370-S3
03/19/2026
Signed off — Alteration CO
Subsequent structural work.
X00638370-S2
03/17/2026
Signed off — Alteration CO
Subsequent structural work.
X00638370-S5
03/17/2026
Signed off — Alteration CO
Subsequent structural work.
X00638370-S1
03/03/2026
Signed off — Alteration
X00999433-I1
03/03/2026
Signed off — Alteration
INSTALL MARQUEE AT BUILDING ENTRANCE AS PER PLANS. SIGN ON MARQUEE FILED UNDER SEPARATE APPLICATION # X00999346. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01107270-I1
03/03/2026
Signed off — Alteration
X00999386-I1
02/19/2026
Signed off — Alteration
INSTALL ILLUMINATED SIGN ON EXTERIOR WALL (COLUMBUS MEDICAL REHABILITATION)
X00999346-I1
02/17/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00855270-I1
02/15/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01071411-I1
02/11/2026
Permit issued — Construction Fence
X00855270-I1-FN
02/03/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/26/2026
Special inspection requirement — Interior lighting power
STEPHEN LATUS
01/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
STEPHEN LATUS
01/26/2026
Special inspection requirement — Exterior lighting power
STEPHEN LATUS
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
STEPHEN LATUS
01/26/2026
Special inspection requirement — Electrical motors and elevators
STEPHEN LATUS
01/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
STEPHEN LATUS
01/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
STEPHEN LATUS
01/26/2026
Special inspection requirement — Lighting controls
STEPHEN LATUS
01/26/2026
Special inspection requirement — Maintenance information
STEPHEN LATUS
01/26/2026
Special inspection requirement — Shutoff dampers
STEPHEN LATUS
01/26/2026
Special inspection requirement — Ventilation and air distribution system
STEPHEN LATUS
01/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
STEPHEN LATUS
01/26/2026
Special inspection requirement — Metering
STEPHEN LATUS
01/26/2026
Special inspection requirement — Mechanical Systems
STEPHEN LATUS
01/26/2026
Special inspection requirement — Heating Systems
STEPHEN LATUS
01/26/2026
Special inspection requirement — Final
STEPHEN LATUS
01/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
STEPHEN LATUS
01/10/2026
Filed — Alteration CO
Subsequent structural work.
X00638370-A4
12/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
11/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
STEPHEN LATUS
11/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
STEPHEN LATUS
11/19/2025
Special inspection requirement — Maintenance information
STEPHEN LATUS
11/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
STEPHEN LATUS
11/06/2025
Filed — Alteration CO
Subsequent structural work.
X00638370-A5
11/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
STEPHEN LATUS
11/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
STEPHEN LATUS
10/21/2025
Filed — Alteration CO
Subsequent structural work.
X00638370-A3
10/08/2025
Signed off — Alteration CO
Subsequent structural work.
X00638370-S4
09/12/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/08/2025
Filed — Alteration CO
Subsequent structural work.
X00638370-A2
09/08/2025
Permit issued — Sprinklers
X00638370-S4-EW-SP
08/25/2025
Objection raised — Admin
08/25/2025
Objection resolved — Addressed
08/21/2025
Filed — Alteration CO
Subsequent structural work.
X00638370-A1
08/21/2025
Filed — Alteration CO
Subsequent structural work.
X00638370-P9
07/01/2025
Filed — Alteration CO
Subsequent structural work.
X00638370-P8
04/21/2025
Permit issued — Plumbing
X00638370-S3-PL
03/21/2025
Permit issued — General Construction
X01107270-I1-GC
Latest 60 of 174 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offBH Design Group02/11/2026
DOB NOWSprinklersSigned-offGrushinsky Pipng & Heating09/08/2025
DOB NOWPlumbingSigned-offPFL Mechanical04/21/2025
DOB NOWGeneral ConstructionSigned-offNY Sign Art03/21/2025
DOB NOWGeneral ConstructionPermit IssuedBH Design Group02/12/2025
DOB NOWSignSigned-offSkanska Building08/12/2024
DOB NOWMechanical SystemsSigned-offBH Design Group08/09/2024
DOB NOWSprinklersSigned-offGrushinsky Pipng & Heating08/06/2024
DOB NOWSupported ScaffoldSigned-offJasco07/12/2024
DOB NOWConstruction FenceSigned-offBH Design Group07/08/2024
DOB NOWSidewalk ShedSigned-offBH Design Group06/26/2024
DOB NOWPlumbingSigned-offPFL Mechanical04/23/2024
DOB NOWSignSigned-offSkanska Building03/28/2024
DOB NOWStructuralSigned-offNY Sign Art03/28/2024
DOB NOWGeneral ConstructionPermit IssuedBH Design Group11/21/2023
DOB NOWStructuralSigned-offBH Design Group10/23/2023
DOB NOWPlumbingSigned-offPFL Mechanical05/22/2023
DOB NOWConstruction FenceSigned-offBH Design Group04/11/2023
DOB NOWFoundationSigned-offBH Design Group11/19/2022
DOB NOWStructuralSigned-offBH Design Group10/17/2022
DOB NOWGeneral ConstructionPermit IssuedBH Design Group09/20/2022
BISSPISSUEDOrion Plumbing & Heating11/14/2012
BISPLISSUEDOrion Plumbing & Heating11/14/2012
BISMHISSUEDFire Violations Services11/09/2012
BISPLISSUEDM. Farbman & Sons05/03/1991
BISOTISSUEDFort Washington Auto Body04/26/1991
1 project · most recent 08/25/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/25/2026Permit IssuedBH Design GroupHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MUZ-HM12NA 1,151 CFM · Condensing Unit ×4
PUHY-EP192TNU-A1 12,700 CFM · Vrf Outdoor ×2
PURY-EP72TNU-A 6,000 CFM · Vrf Outdoor ×2
Trane YHH180G3V 15 tons · Rooftop Unit ×2
YHH240G3V 20 tons · Rooftop Unit ×2
Ventilation
Greenheck GB-140 1,000 CFM · Exhaust Fan ×6
SQ-130-VG 1,800 CFM · Exhaust Fan ×4
BSQ-140HP 1,300 CFM · Exhaust Fan ×2
CSP-A390-VG 300 CFM · Exhaust Fan ×2
SQ-95-G 300 CFM · Exhaust Fan ×2
1 project · most recent 08/25/2026
Sprinkler System
FiledStatusContractorScope
08/25/2026Signed-offGrushinsky Pipng & HeatingSprinkler System
1 project · most recent 08/25/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/25/2026Signed-offPFL MechanicalGas, Storm, Water/Sanitary
8 projects · most recent 07/21/2026
General Wiring
FiledStatusContractorScope
07/21/2026CompleteItz ElectricGeneral Wiring
02/25/2026CompletePower Direct Electric—
02/19/2026CompleteKings Electric CoGeneral Wiring
02/11/2026CompleteSpectrum on Broadway-Electric—
02/11/2026CompleteSpectrum on Broadway-Electric—
06/27/2024CompleteRichard Neu—
03/04/2024CompleteKings Electric Co1 meters, 1 new_meters
01/17/2023CompleteKings Electric Co—
1 project · most recent 08/25/2026
Steel Concrete
FiledStatusContractorScope
08/25/2026Signed-offGrushinsky Pipng & HeatingSteel, Concrete
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/16/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 101
DateRequirementInspectorRole
08/24/2026Insulation placement and R valuesSTEPHEN LATUSenergy_progress
08/24/2026Interior lighting powerSTEPHEN LATUSenergy_progress
08/24/2026Electrical motors and elevatorsSTEPHEN LATUSenergy_progress
08/24/2026Structural Stability – Alterations of existing buildingsSTEPHEN LATUSspecial
08/24/2026Lighting controlsSTEPHEN LATUSenergy_progress
08/24/2026Air barrier - visual inspectionSTEPHEN LATUSenergy_progress
01/26/2026Interior lighting powerSTEPHEN LATUSenergy_progress
01/26/2026Lighting controlsSTEPHEN LATUSenergy_progress
01/26/2026HVAC-R and service water heating equipmentSTEPHEN LATUSenergy_progress
01/26/2026Heating SystemsSTEPHEN LATUSspecial
01/26/2026Structural Stability – Alterations of existing buildingsSTEPHEN LATUSspecial
01/26/2026Mechanical SystemsSTEPHEN LATUSspecial
01/26/2026FinalSTEPHEN LATUSprogress
01/26/2026Energy Code Compliance InspectionsSTEPHEN LATUSprogress
01/26/2026Electrical motors and elevatorsSTEPHEN LATUSenergy_progress
01/26/2026Shutoff dampersSTEPHEN LATUSenergy_progress
01/26/2026Maintenance informationSTEPHEN LATUSenergy_progress
01/26/2026Ventilation and air distribution systemSTEPHEN LATUSenergy_progress
01/26/2026HVAC-R and service water heating system controlsSTEPHEN LATUSenergy_progress
01/26/2026MeteringSTEPHEN LATUSenergy_progress
01/26/2026Duct leakage testing, insulation and designSTEPHEN LATUSenergy_progress
01/26/2026Exterior lighting powerSTEPHEN LATUSenergy_progress
01/26/2026HVAC-R and service water piping design and insulationSTEPHEN LATUSenergy_progress
11/19/2025HVAC-R and service water piping design and insulationSTEPHEN LATUSenergy_progress
11/19/2025Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
Latest 25 of 101.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Columbus Medical RehabMedical / HealthcareFloor 1
Project X01107270 Alteration · LOC Issued · 03/05/2025
Columbus Center for Medical RehabilitationMedical / HealthcareCellar, Basement, Floor 1, Roof
Project X00638370 Alteration CO · Permit Entire · 12/16/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 186 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch28
08/23/2026X00855270-I1Request digital key ↗
08/22/2026X00638370-P6Request digital key ↗
08/22/2026X00638370-S1Request digital key ↗
Showing 3 of 28 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION3
03/03/2026220172355Open ↗
10/22/2012220238320Open ↗
03/08/2012220172355Open ↗
▸BISWORK PERMIT APPLICATION3
11/15/2012220238320Open ↗
11/15/2012220238320Open ↗
11/13/2012220238320Open ↗
▸DOB NOWHPD - Permit Notice1
08/13/2026X00638370-I1Open ↗
▸Seals & Professional Certifications87
▸DOB NOWSpecial Inspector Seal & Signature31
10/03/2026X00638370-S2Open ↗
10/03/2026X00638370-S2Open ↗
10/03/2026X00638370-S5Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature28
08/23/2026X00855270-I1Open ↗
08/21/2026X00999386-I1Open ↗
08/21/2026X00999433-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
10/09/2026X01107270-I1Open ↗
10/03/2026X00638370-S2Open ↗
10/03/2026X00638370-S2Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
08/05/2013220238320Open ↗
10/22/2012220238320Open ↗
10/22/2012220238320Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/22/2012220238320Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/22/2012220238320Open ↗
▸Trade Schedules & Equipment7
▸BISSELF-CERT PLUMBING NOTICE4
02/13/2013220238320Open ↗
02/13/2013220238320Open ↗
01/14/2013220238320Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
10/22/2012220238320Open ↗
09/10/2012220172355Open ↗
03/08/2012220172355Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/13/2026X00638370-P3Open ↗
08/13/2026X00638370-I1Open ↗
08/13/2026X00638370-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00638370-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00638370-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00638370-I1Open ↗
▸Environmental & Asbestos25
▸DOB NOWOER: Notice to Proceed11
08/13/2026X00638370-S2Open ↗
08/13/2026X00638370-S3Open ↗
08/13/2026X00638370-A2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/13/2026X00638370-S4Open ↗
08/13/2026X00638370-I1Open ↗
08/13/2026X00638370-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
08/15/2026X00638370-I1Open ↗
08/13/2026X00638370-S3Open ↗
08/13/2026X00638370-S5Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/22/2013220238320Open ↗
10/22/2012220238320Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/08/2012220172355Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/22/2012220238320Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/08/2012220172355Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/05/2013220238320Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/22/2026X00638370-S2Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/15/2026X00638370-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWTR5 Test Report1
08/13/2026X00638370-S5Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/03/2026220172355Open ↗
08/05/2013220238320Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/22/2013220238320Open ↗
08/17/2013220238320Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
10/22/2012220238320Open ↗
03/08/2012220172355Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
08/05/2013220238320Open ↗
08/05/2013220238320Open ↗
10/22/2012220238320Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
10/22/2012220238320Open ↗
03/08/2012220172355Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification5
08/13/2026X00638370-A2Open ↗
08/13/2026X00638370-P6Open ↗
08/13/2026X00638370-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/13/2026X00638370-I1Open ↗