4 Open Violations 2 unresolved · 2 paperwork only▸
DOB04/06/2011FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/13/2011FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB01/07/2010WORK W/O A PERMIT. NOTED: AT FRONT YARD, LOT LINE OF PREMISES ERECTED JOB SITE FENCE NO DOB PERMITS OBTAINED OR ISSUED AT TIME OF INSPECTION. REMEDY: OBTAIN PERMIT FORTHWITH!Nothing owed — awaiting certificate of correction
ECB11/30/2009WORK W.O PERMIT. AT CELLAR LEVEL ERECTED FULL HEIGHT PARTITIONS CREATING 2 RMS USED AS BEDROOMS. INSTALLED WATER & WASTE LINES FOR 1 PC BATHROOM (TOILET,SINK,TUB) & RESIDENTIAL SINK AT KITCHEN AREA. ALSO INSTALNothing owed — awaiting certificate of correction
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.