← Back
BuildNYC
Two family converted from one family
131-06 FOCH BOULEVARD
QUEENS · South Ozone Park · BIN 4253023
💬 Discuss this project
1960Year Built
2Stories
B3Building Class
R3-2Zoning
2,848 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family converted from one family · 4,777 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation4p · 2 filings · 20 docs
Floor 216p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar15p · 1 filing · 20 docs
Site & exteriorConstruction fence installation21p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/12/2025$1.3M—Private party → Private party$447/sf building
04/10/2019$630K—Private party → Private party$221/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering112/03/2025
Maz Design809/18/2025
A & M Associates208/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
Maz Design803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Get It Done Now USAScaffold707/08/2026
Associated Building ConstructionGeneral Contractor303/21/2026
Kishan PlumbingPlumbing207/08/2026
Kepler Electrical ContElectrical103/22/2026
Maz 247Scaffold107/08/2026
Sunrun Installation Servicespecialty_contractor104/09/2026
Get It Done Now USAGeneral Contractor108/12/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272112/03/2025
Empire Design5474208/07/2025
Building Lifecycle
03/26/2026
Signed off — Alteration CO
application filing to convert 1-2 family including horizontal and vertical extension as per plan to obtain certificate of occupancy (CO).
Q00816579-I1
03/17/2026
Signed off — Alteration
Q01327246-I1
12/09/2025
Permit issued — Solar
Q01327246-I1-SL
12/03/2025
Filed — Alteration
Q01327246-I1
12/03/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
76 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service12/09/2025
DOB NOWPlumbingSigned-offN and S Plumbing02/13/2025
DOB NOWGeneral ConstructionPermit IssuedAssociated Building Construction11/22/2023
DOB NOWPlumbingSigned-offN and S Plumbing11/21/2023
DOB NOWConstruction FenceSigned-offMaz 24711/14/2023
DOB NOWConstruction FenceSigned-offGet It Done Now USA11/19/2021
DOB NOWConstruction FenceSigned-offGet It Done Now USA03/16/2021
DOB NOWConstruction FenceSigned-offGet It Done Now USA06/16/2020
BISOTISSUEDGet It Done Now USA08/12/2020
1 project · most recent 08/07/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/07/2025Signed-offKishan PlumbingGas, Storm, Water/Sanitary
3 projects · most recent 12/03/2025
General Wiring
FiledStatusContractorScope
12/03/2025CompleteSunrun Solar Electl—
01/03/2025CompleteAdam Electrical ContrngGeneral Wiring
11/26/2023CompleteKepler Electrical Cont—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/18/2025Fail-Final CND-Occupancy InspectionFailView ↗
02/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/24/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/05/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/07/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
12/03/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
12/03/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/02/2025FinalWalid Abdullaprogress
12/02/2025Energy Code Compliance InspectionsWalid Abdullaprogress
12/02/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
09/09/2025HVAC-R and service water heating equipmentMD SHAHJADAenergy_progress
09/09/2025Fenestration air leakageMD SHAHJADAenergy_progress
09/09/2025Subgrade InspectionsMd Rashidspecial
09/09/2025Fenestration areasMD SHAHJADAenergy_progress
09/09/2025Lighting controlsMD SHAHJADAenergy_progress
09/09/2025Structural Stability – Alterations of existing buildingsMd Rashidspecial
09/09/2025Fire-Resistant Penetrations and JointsMd Rashidspecial
09/09/2025Concrete - Cast-In-PlaceMd Rashidspecial
09/09/2025Protection of exposed foundation insulationMD SHAHJADAenergy_progress
08/06/2025Fenestration air leakageMD SHAHJADAenergy_progress
08/06/2025Concrete - Cast-In-PlaceMd Rashidspecial
08/06/2025Fire-Resistant Penetrations and JointsMd Rashidspecial
08/06/2025Structural Stability – Alterations of existing buildingsMd Rashidspecial
08/06/2025Subgrade InspectionsMd Rashidspecial
08/06/2025HVAC-R and service water heating equipmentMD SHAHJADAenergy_progress
08/06/2025Fenestration areasMD SHAHJADAenergy_progress
08/06/2025Lighting controlsMD SHAHJADAenergy_progress
08/06/2025Protection of exposed foundation insulationMD SHAHJADAenergy_progress
05/06/2025HVAC-R and service water heating equipmentMD SHAHJADAenergy_progress
05/06/2025Energy Code Compliance InspectionsMD SHAHJADAprogress
Latest 25 of 43.
111 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account