HPD10/17/2009SECTION 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES WASH BASIN IN THE BATHROOM LOCATED AT APT 2FL, 2nd STORY
HPD10/17/2009SECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE WASH BASIN IN THE BATHROOM LOCATED AT APT 2FL, 2nd STORY
HPD10/17/2009SECTION 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES WASH BASIN IN THE BATHROOM LOCATED AT APT 2FL, 2nd STORY
HPD10/17/2009SECTION 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK AT BUILDING ENTRANCE METAL GATE
Two family frame · 2,520 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.