← Back
BuildNYC
Elevator cooperative
131-11 KEW GARDENS ROAD
QUEENS · Kew Gardens · BIN 4206429
💬 Discuss this project
1960Year Built
6Stories
D4Building Class
R4-1Zoning
77,520 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized70 Active Violations 66 unresolved · 4 paperwork only 3 likely answered 1 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: Kew Manor Owners · 29,000 sf lot · 2.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHighrise Property Management3p · 3 filings · 10 docs
Floor 2Unit 2L1p · 1 filing · 4 docs
Floor 1Heavy duty sidewalk shed installation6p · 2 filings · 5 docs
Sub-BasementHighrise Property Management1 filing · 4 docs
Site & exteriorVenture NY Property Management8p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Kew Manor Owners903/22/2026
VNYPM407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Scherer Design Group304/17/2025
Arquitectura Varela103/08/2024
Richard Koenigsberg106/30/2021
Enthink Engineers206/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services303/21/2026
Municipal Building Consultants103/21/2026
CM3 Design Studio103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dinam DevelopmentGeneral Contractor903/21/2026
LKR Technical ServicellcGeneral Contractor303/21/2026
Atlanta Tra & Engineering CoGeneral Contractor107/08/2026
CHR PropertiesGeneral Contractor107/08/2026
Dinam DevelopmentScaffold107/08/2026
JascoScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Scherer Design Group7921304/17/2025
Sohail Humayun P E8457103/08/2024
Koenigsberg Engineering2247106/30/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
09/30/2026
Boiler inspection report filed
Initial · no defects · Accepted
08/19/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BASE .WOODEN CARBINET IN THE KITCHEN LOCATED AT APT 4M, 4th STORY,…
HPD violation · open
08/19/2026
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS . IN THE BATHROOM LOCATED AT APT 4M, 4th STORY, 5th APARTMENT FROM WEST AT NORTH
HPD violation · open
08/19/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR TILES IN THE 1st ROOM FROM NORTH LOCATED AT APT 4M, 4th…
HPD violation · open
287 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offAtlanta Tra & Engineering Co03/17/2025
DOB NOWGeneral ConstructionSigned-offCHR Properties03/22/2024
DOB NOWAntennaSigned-offLKR Technical Servicellc05/05/2022
DOB NOWStructuralSigned-offDinam Development04/27/2022
DOB NOWGeneral ConstructionSigned-offDinam Development01/24/2022
DOB NOWStructuralSigned-offDinam Development08/20/2021
DOB NOWSidewalk ShedSigned-offJasco06/17/2021
DOB NOWSupported ScaffoldPermit IssuedDinam Development05/24/2021
BISOTISSUEDTelcom Engineering GP07/21/2016
BISOTISSUEDTelcom Engineering GP07/17/2015
BISOTISSUEDTelcom Engineering GP07/03/2014
BISOTISSUEDTelcom Engineering GP11/19/2013
BISPLISSUEDJoseph Ferrigno P&H Co02/20/2008
BISFSISSUEDCastle Oil10/16/1998
BISPLISSUEDHydro Mechanical07/17/1997
BISOTISSUEDHighland Construction11/15/1996
1 project · most recent 04/17/2025
Generators
FiledStatusContractorScope
04/17/2025——Generators
1 project · most recent 04/17/2025
Gas
FiledStatusContractorScope
04/17/2025——Gas
3 projects · most recent 06/17/2021
General Wiring Boiler Controls
FiledStatusContractorScope
06/17/2021Permit IssuedRichard Neu—
06/10/2019Permit IssuedSafetech Electrical ContngGeneral Wiring
12/19/2018CompleteBlaze ElectricBoiler Controls
1 project · most recent 05/24/2021
Scaffold
FiledStatusContractorScope
05/24/2021Permit IssuedDinam DevelopmentScaffold
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/30/2024Tenant Protection Plan ComplianceCOLLEEN CONNOLLYspecial
02/29/2024Tenant Protection Plan ComplianceSOHAIL HUMAYUNspecial
02/27/2024FinalVicente Varelaprogress
06/09/2021FinalSunil Saigalprogress
05/28/2021Structural Stability – Alterations of existing buildingsRICHARD KOENIGSBERGspecial
05/28/2021FinalRICHARD KOENIGSBERGprogress
05/28/2021MasonryRICHARD KOENIGSBERGspecial
70 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account