← Back
BuildNYC
Two family converted from one family
131-21 FARMERS BOULEVARD
QUEENS · St. Albans · BIN 4279662
💬 Discuss this project
1930Year Built
2Stories
B3Building Class
R3AZoning
2,712 sfGross Floor Area
2Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Two family converted from one family · Owner of record: Action No 53 · 5,070 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofResidential solar electric generation array installation1 filing · 6 docs
Floor 25p · 2 filings · 20 docs
Floor 15p · 2 filings · 20 docs
Cellar7p · 2 filings · 20 docs
Site & exteriorProposed 2 story building with sidewalk1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Blackstone Real Group1407/08/2026
South Jamaica Holdings 2203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/08/2025$1.3M—ACTION NO 53 LLC → Private party$479/sf building
05/14/2024$247K—Private party → ACTION NO 53 LLC$91/sf building
03/02/2021$397K—Private party → SOUTH JAMAICA HOLDINGS 2 LLC$146/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Momentum Solar101/28/2026
J.k.design405/27/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yafe MeodGeneral Contractor303/21/2026
Roney ElectricElectrical103/22/2026
NY City Construction*Scaffold107/08/2026
Rock E Small Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV Sia9281101/28/2026
HRF Services5616305/27/2025
Building Lifecycle
04/01/2026
Permit expired, never signed off — Solar
The city's record still shows this permit as issued, with no sign-off on its filing
Q01352149-I1-SL
01/29/2026
Permit issued — Solar
Q01352149-I1-SL
01/28/2026
Filed — Alteration
installation of solar panels, rooftop, railed, grid-tied, 51 modules, 20.91 KW
Q01352149-I1
01/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
01/28/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
63 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMomentum Solar01/29/2026
DOB NOWPlumbingSigned-offRock E Small Plumbing & Heating02/10/2025
DOB NOWStructuralPermit IssuedYafe Meod11/15/2024
DOB NOWConstruction FenceSigned-offNY City Construction*11/07/2024
BIS—ISSUEDHoward Last, P.E09/18/1989
2 projects · most recent 01/28/2026
General Wiring
FiledStatusContractorScope
01/28/2026Permit IssuedIsland Electric—
11/25/2024CompleteRoney ElectricGeneral Wiring
1 project · most recent 05/27/2025
Concrete Wood
FiledStatusContractorScope
05/27/2025Permit IssuedYafe MeodConcrete, Wood
1 project · most recent 01/28/2026
FiledStatusContractorScope
01/28/2026Permit IssuedMomentum Solar—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/21/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/13/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/13/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
01/28/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
01/28/2026Air barrier - visual inspectionMina Makarenergy_progress
01/27/2026Fire-Resistant Penetrations and JointsMina Makarspecial
01/27/2026Energy Code Compliance InspectionsMina Makarprogress
01/27/2026FinalMina Makarprogress
06/30/2025Subgrade InspectionsFAHAD FATEHspecial
06/30/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
06/30/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
06/30/2025Structural Wood FrameFAHAD FATEHprogress
06/30/2025Footing and FoundationFAHAD FATEHprogress
06/30/2025FinalFAHAD FATEHprogress
06/30/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
06/30/2025Interior lighting powerFAHAD FATEHenergy_progress
06/30/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/30/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
06/30/2025MeteringFAHAD FATEHenergy_progress
06/30/2025Permanent certificateFAHAD FATEHenergy_progress
06/30/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
06/30/2025Fenestration air leakageFAHAD FATEHenergy_progress
06/30/2025Electric vehicle service equipment requirementsFAHAD FATEHenergy_progress
06/30/2025Fenestration areasFAHAD FATEHenergy_progress
06/30/2025Maintenance informationFAHAD FATEHenergy_progress
06/30/2025Concrete - Cast-In-PlaceFAHAD FATEHspecial
06/30/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
06/30/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
Latest 25 of 26.
41 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account