← Back
Two family converted from one family
131-23 SUTTER AVENUE
QUEENS · BIN 4254968
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3-2Zoning
1,318 sfGross Floor Area
2Units
Two family converted from one family · 2,994 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Floor 210p · 2 filings · 20 docs
Floor 110p · 2 filings · 20 docs
Cellar11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
131-23 SUTTER2007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/02/2024$885K—131-23 SUTTER LLC → Private party$671/sf building
06/27/2023$450K—Private party → 131-23 SUTTER LLC$341/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KING DAVID ARCHITECTURE PC506/17/2024
CL ENGINEERING P.C.204/03/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEMAZIA CONSTRUCTION INCGeneral Contractor603/21/2026
POWER SURGE ELECTRIC, INCElectrical203/22/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781706/17/2024
Building Lifecycle
All (23)Filed (7)Permit Issued (3)Signed Off (2)Inspection (11)
09/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/15/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/08/2024
Signed off — Alteration
THIS PAA IS TO SHOW CORRECTLY WHAT IS EXISTING CONNECTING TO EXITING METER AND WHAT IS PROPOSED CONNECTED TO PROPOSED METER.
Q00918722-I1
07/05/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/17/2024
Filed — Alteration CO
MINOR CHANGES TO APPROVED PLANS ONLY
Q00861121-P2
06/10/2024
Filed — Alteration
THIS PAA IS TO SHOW CORRECTLY WHAT IS EXISTING CONNECTING TO EXITING METER AND WHAT IS PROPOSED CONNECTED TO PROPOSED METER.
Q00918722-P1
05/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/08/2024
Signed off — Alteration
Q00900756-I1
05/08/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/22/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
04/10/2024
Filed — Alteration CO
MINOR CHANGES TO APPROVED PLANS ONLY
Q00861121-P1
04/04/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/03/2024
Filed — Alteration
Q00900756-P1
03/29/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/26/2024
Permit issued — Plumbing
Q00918722-I1-PL
02/07/2024
Permit issued — General Construction
Q00861121-I1-GC
08/14/2023
Filed — Alteration
THIS PAA IS TO SHOW CORRECTLY WHAT IS EXISTING CONNECTING TO EXITING METER AND WHAT IS PROPOSED CONNECTED TO PROPOSED METER.
Q00918722-I1
07/27/2023
Permit issued — General Construction
Q00900756-I1-GC
07/24/2023
Filed — Alteration
Q00900756-I1
07/05/2023
Filed — Alteration CO
MINOR CHANGES TO APPROVED PLANS ONLY
Q00861121-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC03/26/2024
DOB NOWGeneral ConstructionPermit IssuedLEMAZIA CONSTRUCTION INC02/07/2024
DOB NOWGeneral ConstructionSigned-offLEMAZIA CONSTRUCTION INC07/27/2023
2 projects · most recent 08/07/2024
General Wiring
FiledStatusContractorScope
08/07/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
09/06/2023CompleteMARTIN DORKINGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
09/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/05/2024Fail-Final CND-Occupancy InspectionFailView ↗
06/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/08/2024Fail-Final CND-Occupancy InspectionFailView ↗
04/22/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
04/04/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/29/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/29/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
08/13/2024Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
08/13/2024PreliminaryCHRISTIAN LOZADAprogress
08/13/2024MeteringCHRISTIAN LOZADAenergy_progress
08/13/2024Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
08/13/2024Electric vehicle service equipment requirementsCHRISTIAN LOZADAenergy_progress
08/13/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
08/13/2024Fenestration air leakageCHRISTIAN LOZADAenergy_progress
08/13/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
08/13/2024Fenestration areasCHRISTIAN LOZADAenergy_progress
08/13/2024Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
08/13/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
06/24/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
06/24/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
06/07/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
06/07/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
04/10/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/10/2024PreliminaryCHRISTIAN LOZADAprogress
08/15/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/15/2023FinalCHRISTIAN LOZADAprogress
08/15/2023PreliminaryCHRISTIAN LOZADAprogress
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026Q00900756-P1Request digital key ↗
08/24/2026Q00900756-I1Request digital key ↗
08/24/2026Q00918722-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/14/2026Q00861121-I1Open ↗
08/13/2026Q00861121-P1Open ↗
08/13/2026Q00861121-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026Q00861121-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature14
09/10/2026Q00900756-P1Open ↗
08/27/2026Q00918722-P1Open ↗
08/26/2026Q00861121-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026Q00900756-I1Open ↗
08/24/2026Q00900756-P1Open ↗
08/24/2026Q00918722-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/10/2026Q00900756-P1Open ↗
08/27/2026Q00918722-P1Open ↗
08/26/2026Q00861121-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/23/2026Q00861121-P1Open ↗
08/15/2026Q00861121-P2Open ↗
08/14/2026Q00861121-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026Q00861121-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026Q00900756-I1Open ↗
08/24/2026Q00900756-P1Open ↗
08/24/2026Q00918722-I1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/14/2026Q00861121-I1Open ↗
08/13/2026Q00861121-P1Open ↗
08/13/2026Q00861121-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/14/2026Q00861121-I1Open ↗
08/13/2026Q00861121-P2Open ↗
08/13/2026Q00861121-P1Open ↗
▸DOB NOWPlot Diagram3
08/14/2026Q00861121-I1Open ↗
08/13/2026Q00861121-P1Open ↗
08/13/2026Q00861121-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/23/2026Q00861121-P1Open ↗
08/15/2026Q00861121-P2Open ↗
08/14/2026Q00861121-I1Open ↗
▸DOB NOWFinal Survey1
08/14/2026Q00861121-I1Open ↗