← Back
One story - permanent living quarter
131-47 233 STREET
QUEENS · Laurelton · BIN 4279107
💬 Discuss this project
1940Year Built
1.75Stories
A2Building Class
R2AZoning
1,254 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
One story - permanent living quarter · 6,480 sf lot · 0.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof4p · 1 filing · 19 docs
Cellar5p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
135-223 STREET707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PETER CHO ARCHITECTS, PLLC302/19/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RISHON HOMES CORPGeneral Contractor107/08/2026
Building Lifecycle
All (56)Filed (3)Permit Issued (1)Violation (5)Objection (17)Special Inspection (30)
05/08/2026
Permit issued — Construction Fence
Q01361533-I1-FN
03/24/2026
Objection raised — Energy
03/16/2026
Objection resolved — Addressed
03/16/2026
Objection resolved — Addressed
03/16/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/05/2026
Objection resolved — Addressed
03/03/2026
Objection raised — Admin
03/03/2026
Objection raised — Structural
03/03/2026
Objection raised — Zoning
03/03/2026
Objection raised — Admin
03/03/2026
Objection raised — Admin
03/03/2026
Objection raised — Fire_Protection
03/02/2026
Objection raised — Admin
02/24/2026
Objection raised — Energy
02/19/2026
Filed — Alteration
Q01361533-I1
02/18/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
CONVERSION OF THE EXISTING 1-1/2 STORY ONE-FAMILY BUILDING INTO A 2-STORY ONE-FAMILY BUILDING & ONE A.D.U. AT 02 FLR AS SHOWN ON THE PLANS. PROPOSED VERTICAL & HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01354279-I1
02/18/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
CONVERSION OF THE EXISTING 1-1/2 STORY ONE-FAMILY BUILDING INTO A 2-STORY ONE-FAMILY BUILDING & ONE A.D.U. AT 02 FLR AS SHOWN ON THE PLANS. PROPOSED VERTICAL & HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01354279-S2
02/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/18/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
02/18/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
02/18/2026
Special inspection requirement — Energy Code Compliance Inspections
02/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/18/2026
Special inspection requirement — Maintenance information
02/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/02/2026
Special inspection requirement — Structural Steel - Details
02/02/2026
Special inspection requirement — Structural Steel - High Strength Bolting
02/02/2026
Special inspection requirement — Subgrade Inspections
02/02/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
02/02/2026
Special inspection requirement — Final
02/02/2026
Special inspection requirement — Footing and Foundation
02/02/2026
Special inspection requirement — Energy Code Compliance Inspections
02/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
02/02/2026
Special inspection requirement — Structural Wood Frame
02/02/2026
Special inspection requirement — Electric vehicle service equipment requirements
02/02/2026
Special inspection requirement — Air barrier — testing
02/02/2026
Special inspection requirement — Maintenance information
02/02/2026
Special inspection requirement — Air barrier - visual inspection
02/02/2026
Special inspection requirement — Fenestration air leakage
02/02/2026
Special inspection requirement — Fenestration areas
02/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/02/2026
Special inspection requirement — Ventilation and air distribution system
02/02/2026
Special inspection requirement — Metering
02/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/02/2026
Special inspection requirement — Insulation placement and R values
11/11/2021
Violation issued (HPD, closed)
C
11/11/2021
Violation issued (HPD, closed)
C
05/24/2021
Violation issued (HPD, open)
I
05/22/2021
Violation issued (HPD, closed)
C
05/22/2021
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedRISHON HOMES CORP05/08/2026
1 project · most recent 02/18/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/18/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Cooper & Hunter CH-N48LCU-230VO 48,000 BTU · Condensing Unit ×1
CH-N60LCU-230VO 60,000 BTU · Condensing Unit ×1
Heating
Cooper & Hunter CH-48AHU 48,000 BTU · Fan Coil Indoor ×1
CH-60AHU 60,000 BTU · Fan Coil Indoor ×1
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×5
Delta Breeze SMT150 150 CFM · Exhaust Fan ×2
1 project · most recent 02/18/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/18/2026——Gas, Storm, Water/Sanitary
1 project · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026Permit IssuedRONEY ELECTRIC INCGeneral Wiring
1 project · most recent 02/18/2026
Steel Wood
FiledStatusContractorScope
02/18/2026——Steel, Wood
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
02/18/2026Fire-Resistant Penetrations and Joints—special
02/18/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
02/18/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
02/18/2026Energy Code Compliance Inspections—progress
02/18/2026HVAC-R and service water piping design and insulation—energy_progress
02/18/2026HVAC-R and service water heating system controls—energy_progress
02/18/2026Maintenance information—energy_progress
02/18/2026HVAC-R and service water heating equipment—energy_progress
02/02/2026Structural Steel - Details—special
02/02/2026Structural Steel - High Strength Bolting—special
02/02/2026Subgrade Inspections—special
02/02/2026Subsurface Investigations (Borings/Test Pits)—special
02/02/2026Final—progress
02/02/2026Footing and Foundation—progress
02/02/2026Energy Code Compliance Inspections—progress
02/02/2026Fire-Resistance Rated Construction—progress
02/02/2026Structural Wood Frame—progress
02/02/2026Electric vehicle service equipment requirements—energy_progress
02/02/2026Air barrier — testing —energy_progress
02/02/2026Maintenance information—energy_progress
02/02/2026Air barrier - visual inspection—energy_progress
02/02/2026Fenestration air leakage—energy_progress
02/02/2026Fenestration areas—energy_progress
02/02/2026Fenestration and door U-factor and product ratings—energy_progress
02/02/2026HVAC-R and service water piping design and insulation—energy_progress
Latest 25 of 41.
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026Q01354279-P2Request digital key ↗
08/17/2026Q01354279-P1Request digital key ↗
08/17/2026Q01354279-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026Q01354279-P2Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026Q01354279-P2Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026Q01354279-S2Open ↗
08/17/2026Q01354279-P2Open ↗
08/17/2026Q01354279-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/17/2026Q01354279-P2Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification2
08/17/2026Q01354279-I1Open ↗
08/17/2026Q01354279-P2Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026Q01354279-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026Q01354279-P2Open ↗