131 EAST 29 STREET
MANHATTAN · Murray Hill-Kips Bay · BIN 1018254
💬 Discuss this project
1915Year Built
4Stories
C3Building Class
C6-2AZoning
4,220 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation ▸
Four families · 1,975 sf lot · 2.14 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 1 filing · 20 docs
Floor 4Under Construction15p · 1 filing · 20 docs
Floor 3Under Construction25p · 1 filing · 20 docs
Floor 2Under Construction21p · 1 filing · 20 docs
Floor 1Under Construction22p · 1 filing · 20 docs
CellarUnder Construction8p · 1 filing · 20 docs
Sub-BasementUnder Construction17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
337 E 18 ST1004/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/30/2025$4.0M—— → —$960/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEVIN ENGINEERING PLLC308/03/2026
DNB ENGINEERING PLLC101/23/2026
EDIFICE DRAFTING AND SERVICES201/12/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METHOD GENERAL CONTRACTORGeneral Contractor304/09/2026
P.H. WORKS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416508/03/2026
Building Lifecycle
All (101)Filed (6)Permit Issued (4)Violation (5)Inspection (4)Objection (52)Special Inspection (30)
08/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/17/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/03/2026
Filed — Alteration
alteration application for interior fit out. no change to use, egress nor occupancy
M01317557-P2
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
07/27/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
07/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
07/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
07/27/2026
Special inspection requirement — Maintenance information
ELIAS RASABI
07/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
05/12/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/29/2026
Violation issued (HPD, open)
A
03/20/2026
Permit issued — Mechanical Systems
M01317557-S2-MS
03/02/2026
Permit issued — General Construction
M01317557-I1-GC
02/13/2026
Permit issued — Plumbing
M01317557-S4-PL
02/06/2026
Permit issued — General Construction
M01317557-I1-GC
02/06/2026
Objection resolved — Addressed
02/06/2026
Objection resolved — Addressed
02/06/2026
Objection resolved — Addressed
02/06/2026
Objection resolved — Addressed
02/06/2026
Objection resolved — Addressed
02/06/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
02/03/2026
Objection raised — Structural
02/03/2026
Objection raised — Structural
02/03/2026
Objection raised — Admin
02/03/2026
Objection raised — Structural
02/03/2026
Objection raised — Cost
02/03/2026
Objection raised — Admin
01/26/2026
Objection raised — Cost
01/23/2026
Filed — Alteration
alteration application for interior fit out. no change to use, egress nor occupancy
M01317557-S1
01/23/2026
Objection resolved — Addressed
01/20/2026
Objection raised — Admin
01/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
01/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
01/20/2026
Special inspection requirement — Metering
ELIAS RASABI
01/20/2026
Special inspection requirement — Maintenance information
ELIAS RASABI
01/20/2026
Special inspection requirement — Interior lighting power
ELIAS RASABI
01/20/2026
Special inspection requirement — Fenestration areas
ELIAS RASABI
01/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ELIAS RASABI
01/20/2026
Special inspection requirement — Fenestration air leakage
ELIAS RASABI
01/20/2026
Special inspection requirement — Lighting controls
ELIAS RASABI
01/20/2026
Special inspection requirement — Lighting in dwelling units
ELIAS RASABI
01/20/2026
Special inspection requirement — Final
ELIAS RASABI
01/15/2026
Filed — Alteration
alteration application for interior fit out. no change to use, egress nor occupancy
M01317557-S4
01/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
01/14/2026
Special inspection requirement — Wood – Seismic Resistance
ELIAS RASABI
01/14/2026
Special inspection requirement — Masonry
ELIAS RASABI
01/14/2026
Special inspection requirement — Post-installed Anchors
ELIAS RASABI
01/14/2026
Special inspection requirement — Structural Steel - Details
ELIAS RASABI
01/14/2026
Special inspection requirement — Structural Wood Frame
ELIAS RASABI
01/12/2026
Filed — Alteration
alteration application for interior fit out. no change to use, egress nor occupancy
M01317557-P1
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection resolved — Addressed
12/22/2025
Objection raised — Cost
12/22/2025
Objection raised — Zoning
12/12/2025
Filed — Alteration
alteration application for interior fit out. no change to use, egress nor occupancy
M01317557-S2
12/12/2025
Special inspection requirement — Ventilation and air distribution system
ELIAS RASABI
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMETHOD GENERAL CONTRACTOR03/20/2026
DOB NOWGeneral ConstructionPermit IssuedMETHOD GENERAL CONTRACTOR03/02/2026
DOB NOWPlumbingPermit IssuedP.H. WORKS INC02/13/2026
DOB NOWGeneral ConstructionPermit IssuedMETHOD GENERAL CONTRACTOR02/06/2026
1 project · most recent 08/03/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/03/2026Permit IssuedMETHOD GENERAL CONTRACTORHeating and Air Conditioning Systems
Heat / Cool
Daikin Daikin RTXA48AAVJU 47,500 BTU · Condensing Unit ×4
1 project · most recent 08/03/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/03/2026Permit IssuedP.H. WORKS INCGas, Water/Sanitary
2 projects · most recent 08/27/2026
General Wiring
FiledStatusContractorScope
08/27/2026Permit IssuedMETHOD ELECTRIC LLCGeneral Wiring
02/20/2026Permit IssuedBLU ELECTRICAL SVS INCGeneral Wiring
1 project · most recent 08/03/2026
Wood
FiledStatusContractorScope
08/03/2026Permit IssuedMETHOD GENERAL CONTRACTORWood
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/17/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/12/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
07/27/2026Fire-Resistant Penetrations and JointsELIAS RASABIspecial
07/27/2026Energy Code Compliance InspectionsELIAS RASABIprogress
07/27/2026HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
07/27/2026HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
07/27/2026Maintenance informationELIAS RASABIenergy_progress
07/27/2026HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
01/20/2026Fire-Resistance Rated ConstructionELIAS RASABIprogress
01/20/2026Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
01/20/2026Fire-Resistant Penetrations and JointsELIAS RASABIspecial
01/20/2026Energy Code Compliance InspectionsELIAS RASABIprogress
01/20/2026MeteringELIAS RASABIenergy_progress
01/20/2026Maintenance informationELIAS RASABIenergy_progress
01/20/2026Interior lighting powerELIAS RASABIenergy_progress
01/20/2026Fenestration areasELIAS RASABIenergy_progress
01/20/2026Fenestration and door U-factor and product ratingsELIAS RASABIenergy_progress
01/20/2026Fenestration air leakageELIAS RASABIenergy_progress
01/20/2026Lighting controlsELIAS RASABIenergy_progress
01/20/2026Lighting in dwelling unitsELIAS RASABIenergy_progress
01/20/2026FinalELIAS RASABIprogress
01/14/2026Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
01/14/2026Wood – Seismic ResistanceELIAS RASABIspecial
01/14/2026MasonryELIAS RASABIspecial
01/14/2026Post-installed AnchorsELIAS RASABIspecial
01/14/2026Structural Steel - DetailsELIAS RASABIspecial
01/14/2026Structural Wood FrameELIAS RASABIprogress
Latest 25 of 37.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/19/2026M01317557-P1Request digital key ↗
08/19/2026M01317557-S2Request digital key ↗
08/19/2026M01317557-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026M01317557-S2Open ↗
09/23/2026M01317557-S2Open ↗
09/01/2026M01317557-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/19/2026M01317557-P2Open ↗
08/13/2026M01317557-S2Open ↗
08/13/2026M01317557-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026M01317557-S2Open ↗
09/01/2026M01317557-I1Open ↗
08/29/2026M01317557-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/19/2026M01317557-P2Open ↗
08/13/2026M01317557-S4Open ↗
08/13/2026M01317557-S1Open ↗
Showing 3 of 6 on file for this type