1901Year Built
2Stories
B3Building Class
R6BZoning
1,920 sfGross Floor Area
2Units
Two family converted from one family · 1,891 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
Plumbing
Basement1p · 1 filing · 3 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/18/2025$2.8M—Private party → Private party$1,432/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDWARD RACZKOWSKI108/05/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDRA ENGINEERING & INSPEC2820108/05/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Inspection (5)
02/13/2026
Signed off — Alteration
OIL TO GAS BOILER CONVERSION PREVIOUSLY PERMITTED UNDER #300761879-LLA, INSTALL (1) NEW GAS WATER HEATER, REPLACE EXIST. GAS PIPING AND (1) EXIST. GAS METER IN THE CELLAR, AND INSTALL (2) NEW WM & (2) NEW DW IN THE BASEMENT AND SECOND FLOOR APARTMENTS.
B01261975-I1
12/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/04/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/16/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/14/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/21/2025
Permit issued — Plumbing
B01261975-I1-PL
08/05/2025
Filed — Alteration
OIL TO GAS BOILER CONVERSION PREVIOUSLY PERMITTED UNDER #300761879-LLA, INSTALL (1) NEW GAS WATER HEATER, REPLACE EXIST. GAS PIPING AND (1) EXIST. GAS METER IN THE CELLAR, AND INSTALL (2) NEW WM & (2) NEW DW IN THE BASEMENT AND SECOND FLOOR APARTMENTS.
B01261975-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC08/21/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/04/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026B01261975-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026B01261975-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026B01261975-I1Open ↗