P.S. 195 Manhattan Beach
131 IRWIN STREET · BIN 3246519
💬 Discuss this project
1948Year Built
2Stories
W1Building Class
R3-1Zoning
31,780 sfGross Floor Area
1Units
LL97 Covered2 Active Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 99,531 sf lot · 0.32 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 195 Manhattan BeachUnder Construction17p · 3 filings · 20 docs
AtticP.S. 195 Manhattan BeachUnder Construction16p · 1 filing · 20 docs
Floor 2P.S. 195 Manhattan BeachUnder Construction2p · 2 filings · 20 docs
Floor 1P.S. 195 Manhattan BeachUnder Construction2p · 2 filings · 20 docs
Site & exteriorP.S. 195 Manhattan BeachUnder Construction35p · 5 filings · 20 docs
Filed — no permit issuedP.S. 195 Manhattan Beach5p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority9510/04/2026
NYC Department of Education103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AK Consulting Services509/21/2026
GC Engineering & Associates207/02/2025
Terrence O'Neal Architect407/01/2025
Silman304/22/2024
Dseny Engineering Services111/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dseny Engineering Services203/21/2026
AK Consulting Services603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Steel ConstructionScaffold1407/08/2026
Ash ContractingGeneral Contractor807/08/2026
Whitestone ConstructionScaffold207/08/2026
Aujla ElectricElectrical103/22/2026
Charan Electrical Enterp'sElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Municipal Testing Laborat230704/23/2024
Building Lifecycle
All (131)Filed (15)Permit Issued (15)Signed Off (1)Violation (60)Objection (18)Special Inspection (22)
09/21/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 195K AT 131 IRWIN STREET, BROOKLYN IN CONJUNCTION WITH JOB # B01233574, B01449113, B01449126 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01449109-I1
09/15/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD FOR PS 195K AT 131 IRWIN STREET, BROOKLYN IN CONJUNCTION WITH JOB # B01233574, B01449109, B01449113 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01449126-I1
08/20/2026
Special inspection requirement — Post-installed Anchors
05/20/2026
Permit issued — General Construction
B00692440-I1-GC
03/18/2026
Violation issued (ECB, open)
Construction
03/04/2026
Violation issued (FDNY_ORDER, closed)
03/04/2026
Violation issued (FDNY_ORDER, closed)
03/04/2026
Violation issued (FDNY_ORDER, closed)
03/04/2026
Violation issued (FDNY_ORDER, closed)
03/04/2026
Violation issued (FDNY_ORDER, closed)
03/04/2026
Violation issued (FDNY_ORDER, closed)
03/04/2026
Violation issued (FDNY_ORDER, closed)
08/19/2025
Objection resolved — Addressed
08/19/2025
Objection resolved — Addressed
08/14/2025
Violation issued (ECB, closed)
Construction
08/14/2025
Violation issued (ECB, open)
Construction
08/08/2025
Objection resolved — Addressed
07/14/2025
Violation issued (ECB, closed)
Construction
07/14/2025
Violation issued (ECB, closed)
Construction
07/08/2025
Objection raised — Other
07/08/2025
Objection raised — Other
07/08/2025
Objection raised — Other
07/02/2025
Filed — Alteration
HVAC work associated with alteration of existing building.
B01233574-S2
07/02/2025
Filed — Alteration
HVAC work associated with alteration of existing building.
B01233574-S1
07/01/2025
Filed — Alteration
HVAC work associated with alteration of existing building.
B01233574-I1
07/01/2025
Special inspection requirement — Masonry
07/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/01/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
07/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
HAKEEM ALSHAWABKEH
07/01/2025
Special inspection requirement — Fire-Resistance Rated Construction
06/10/2025
Special inspection requirement — Mechanical Systems
HAKEEM ALSHAWABKEH
06/10/2025
Special inspection requirement — Final
HAKEEM ALSHAWABKEH
06/06/2025
Violation issued (FDNY_ORDER, closed)
05/28/2025
Permit issued — General Construction
B00692440-I1-GC
05/22/2025
Permit issued — Structural
B00692440-S1-ST
07/17/2024
Objection resolved — Addressed
06/27/2024
Special inspection requirement — Post-installed Anchors
05/15/2024
Permit issued — Supported Scaffold
B00880582-I1-SF
05/14/2024
Permit issued — Structural
B00692440-S1-ST
05/14/2024
Permit issued — General Construction
B00692440-I1-GC
05/08/2024
Permit issued — Sidewalk Shed
B00880574-I1-SH
05/08/2024
Permit issued — Construction Fence
B00880578-I1-FN
04/29/2024
Objection raised — Other
04/29/2024
Special inspection requirement — Structural Steel - Details
STEPHEN LATUS
04/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
STEPHEN LATUS
04/29/2024
Special inspection requirement — Final
STEPHEN LATUS
04/23/2024
Filed — Alteration
Structural work associated with alteration of existing building. No change in use, egress, or occupancy. See below for SCA project information.
B00692440-P3
04/22/2024
Filed — Alteration
Structural work associated with alteration of existing building. No change in use, egress, or occupancy. See below for SCA project information.
B00692440-P4
04/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
STEPHEN LATUS
04/16/2024
Special inspection requirement — Final
STEPHEN LATUS
04/16/2024
Special inspection requirement — Masonry
STEPHEN LATUS
04/16/2024
Special inspection requirement — Structural Steel - Details
STEPHEN LATUS
10/27/2023
Violation issued (FDNY_ORDER, closed)
09/01/2023
Signed off — Alteration
SH/PS195K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(EMERGENCY SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH LLW number 123358, 124357 NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00610523-I1
07/18/2023
Permit issued — Structural
B00692440-S1-ST
07/12/2023
Filed — Alteration
Structural work associated with alteration of existing building. No change in use, egress, or occupancy. See below for SCA project information.
B00692440-P2
07/12/2023
Permit issued — General Construction
B00692440-I1-GC
07/12/2023
Special inspection requirement — Concrete - Cast-In-Place
STEPHEN LATUS
07/12/2023
Special inspection requirement — Final
STEPHEN LATUS
07/12/2023
Special inspection requirement — Structural Steel - Welding
STEPHEN LATUS
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAsh Contracting05/20/2026
DOB NOWGeneral ConstructionPermit IssuedAsh Contracting05/28/2025
DOB NOWStructuralPermit IssuedAsh Contracting05/22/2025
DOB NOWSupported ScaffoldPermit IssuedSteel Construction05/15/2024
DOB NOWStructuralPermit IssuedAsh Contracting05/14/2024
DOB NOWGeneral ConstructionPermit IssuedAsh Contracting05/14/2024
DOB NOWSidewalk ShedPermit IssuedSteel Construction05/08/2024
DOB NOWConstruction FencePermit IssuedSteel Construction05/08/2024
DOB NOWStructuralPermit IssuedAsh Contracting07/18/2023
DOB NOWGeneral ConstructionPermit IssuedAsh Contracting07/12/2023
DOB NOWSupported ScaffoldPermit IssuedSteel Construction06/23/2023
DOB NOWConstruction FencePermit IssuedSteel Construction06/07/2023
DOB NOWSidewalk ShedPermit IssuedSteel Construction06/02/2023
DOB NOWSidewalk ShedSigned-offWhitestone Construction03/21/2023
DOB NOWSidewalk ShedSigned-offWhitestone Construction02/28/2022
BISPLISSUEDMaric Plumbing & Heating08/29/2018
BISOTISSUEDMaric Plumbing & Heating08/29/2018
BISOTISSUEDMaric Plumbing & Heating08/29/2018
BISMHISSUEDMaric Plumbing & Heating08/29/2018
BISOTISSUEDMaric Plumbing & Heating08/29/2018
BISOTISSUEDSCA02/23/2018
BISPLISSUEDMaric Plumbing & Heating09/06/2017
BISMHISSUEDMaric Plumbing & Heating09/06/2017
BISOTISSUEDMaric Plumbing & Heating09/06/2017
BISOTISSUEDMaric Plumbing & Heating09/06/2017
BISOTISSUEDMaric Plumbing & Heating09/06/2017
BISOTISSUEDMaric Plumbing & Heating09/06/2017
BISPLISSUEDMaric Plumbing & Heating08/02/2017
BISOTISSUEDMaric Plumbing & Heating08/02/2017
BISEQISSUEDMaric Plumbing & Heating08/02/2017
BISOTISSUEDMaric Plumbing & Heating09/09/2016
BISFBISSUEDMaric Plumbing & Heating09/09/2016
BISFSISSUEDMaric Plumbing & Heating09/09/2016
BISOTISSUEDMaric Plumbing & Heating09/09/2016
BISPLISSUEDMaric Plumbing & Heating09/09/2016
BISPLISSUEDMaric Plumbing & Heating03/18/2016
BISPLISSUEDWill-Do Plumbing02/03/2016
BISEQISSUEDMaric Plumbing & Heating09/09/2015
BISOTISSUEDMaric Plumbing & Heating09/01/2015
BISFSISSUEDMaric Plumbing & Heating08/31/2015
+ 25 more permits on file
1 project · most recent 07/02/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
07/02/2025——Air Conditioning Systems, Ventilation Systems
1 project · most recent 07/02/2025
Water/Sanitary
FiledStatusContractorScope
07/02/2025——Water/Sanitary
6 projects · most recent 06/01/2026
General Wiring
FiledStatusContractorScope
06/01/2026Permit IssuedMetropolitan Electric of NY IGeneral Wiring
02/04/2026Permit IssuedA & S ElectricGeneral Wiring
06/01/2023Permit IssuedAujla Electric—
10/08/2021CompleteStanco System Electrical Cont—
09/22/2020CompleteMNBC ElectricalGeneral Wiring
05/04/2020CompleteCharan Electrical Enterp's—
1 project · most recent 04/23/2024
Steel Concrete
FiledStatusContractorScope
04/23/2024Permit IssuedAsh ContractingSteel, Concrete
4 projects · most recent 09/21/2026
Fence Scaffold
FiledStatusContractorScope
09/21/2026——Fence
09/15/2026——Scaffold
05/26/2023Permit IssuedSteel ConstructionScaffold
05/26/2023Permit IssuedSteel ConstructionFence
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
08/20/2026Post-installed Anchors—special
07/01/2025Masonry—special
07/01/2025Fire-Resistant Penetrations and Joints—special
07/01/2025Mastic and Intumescent Fire-resistant Coatings—special
07/01/2025Fire-Resistant Penetrations and JointsHAKEEM ALSHAWABKEHspecial
07/01/2025Fire-Resistance Rated Construction—progress
06/10/2025Mechanical SystemsHAKEEM ALSHAWABKEHspecial
06/10/2025FinalHAKEEM ALSHAWABKEHprogress
06/27/2024Post-installed Anchors—special
04/29/2024Structural Steel - DetailsSTEPHEN LATUSspecial
04/29/2024Structural Stability – Alterations of existing buildingsSTEPHEN LATUSspecial
04/29/2024FinalSTEPHEN LATUSprogress
04/16/2024Structural Stability – Alterations of existing buildingsSTEPHEN LATUSspecial
04/16/2024FinalSTEPHEN LATUSprogress
04/16/2024MasonrySTEPHEN LATUSspecial
04/16/2024Structural Steel - DetailsSTEPHEN LATUSspecial
07/12/2023Concrete - Cast-In-PlaceSTEPHEN LATUSspecial
07/12/2023FinalSTEPHEN LATUSprogress
07/12/2023Structural Steel - WeldingSTEPHEN LATUSspecial
07/12/2023Structural Steel - DetailsSTEPHEN LATUSspecial
07/12/2023Structural Stability – Alterations of existing buildingsSTEPHEN LATUSspecial
05/26/2023Post-installed AnchorsSTEPHEN LATUSspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 195 Manhattan BeachEducationEntire building
Project B01449109 Alteration · Approved · 09/21/2026
Project B01449126 Alteration · Approved · 09/15/2026
Project B01233574 Alteration · Approved · 07/01/2025
Project B00880574 Alteration · Permit Entire · 05/26/2023
Project B00880578 Alteration · Permit Entire · 05/26/2023
Project B00880582 Alteration · Permit Entire · 05/26/2023
Project B00692440 Alteration · Permit Entire · 03/23/2022
Project B00610523 Alteration · LOC Issued · 11/30/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/29/2026B00692440-P2Request digital key ↗
08/29/2026B00692440-P4Request digital key ↗
08/27/2026B00880578-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature15
10/05/2026B01449109-I1Open ↗
10/05/2026B01449126-I1Open ↗
08/31/2026B00610523-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/30/2026B00692440-S1Open ↗
08/29/2026B00692440-P4Open ↗
08/29/2026B00692440-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026B00692440-S1Open ↗
08/29/2026B00692440-P4Open ↗
08/25/2026B00692440-P2Open ↗
▸Safety & Tenant Protection6
▸DOB NOWNYCSCA - Approved Site Safety Plans6
10/05/2026B01449109-I1Open ↗
10/05/2026B01449126-I1Open ↗
08/15/2026B00610523-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/29/2026B00692440-P2Open ↗
08/15/2026B00692440-S1Open ↗
08/15/2026B00692440-I1Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs30
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)15
10/05/2026B01449109-I1Open ↗
10/05/2026B01449126-I1Open ↗
08/29/2026B00692440-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
10/05/2026B01449109-I1Open ↗
10/05/2026B01449126-I1Open ↗
08/29/2026B00692440-P2Open ↗
Showing 3 of 15 on file for this type
▸Other Documents19
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal15
10/05/2026B01449109-I1Open ↗
10/05/2026B01449126-I1Open ↗
08/29/2026B00692440-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProof of Historic Building4
08/15/2026B00692440-I1Open ↗
08/15/2026B00692440-P1Open ↗
08/13/2026B01233574-I1Open ↗
Showing 3 of 4 on file for this type