Elevator apt, semi-fireproof with stores
The 125 Middleton Street Condominium
131 MIDDLETON STREET · BIN 3425886
💬 Discuss this project
2024Year Built
5Stories
D7Building Class
R6Zoning
16,125 sfGross Floor Area
5Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: BSD MIDDLETON LLC · 5,158 sf lot · 3.13 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof37p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 14 docs
Floor 536p · 1 filing · 20 docs
Floor 437p · 1 filing · 20 docs
Floor 335p · 1 filing · 20 docs
Floor 234p · 1 filing · 20 docs
Floor 134p · 1 filing · 20 docs
Cellar39p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER'S REP1007/08/2026
EMERALD BUILDERS GROUPLLC103/22/2026
EMERALD BUILDERS GROUP LL103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/18/2022$5.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2003/21/2026
ADVANCED BUILDERS SERVICES803/21/2026
GEIGER E A GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMERALD BUILDERS GROUPLLCGeneral Contractor2007/08/2026
CORNERSTONE BUILDERS NY LGeneral Contractor807/08/2026
GWT ENTERPRISES INCGeneral Contractor707/08/2026
B&B MECH PLBG & HTG LLCPlumbing407/08/2026
FQE ELECTRIC LLCElectrical203/22/2026
TARGET PIPING NY LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAVID KATZ, P.E.6087205/07/2026
BIG APPLE GROUP NY A RMA91681104/16/2026
BIG APPLE GROUP NY, LLC1258203/26/2026
HRF SERVICES CORP5616406/11/2024
Building Lifecycle
All (169)Filed (24)Permit Issued (24)Signed Off (10)Violation (4)Inspection (14)Objection (63)Special Inspection (30)
08/11/2026
Signed off — Alteration
FILING FOR INSTALLATION AND REGISTRATION OF 3 NEW BOILERS AT BULKHEAD. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01311013-I1
06/22/2026
Signed off — Alteration
FILING FOR INSTALLATION AND REGISTRATION OF 3 NEW BOILERS AT BULKHEAD. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01311013-S1
06/02/2026
Signed off — New Building
PROPOSED 5 STORY MIXED USE BUILDING.
B00750243-S9
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Lighting controls
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Exterior lighting power
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Electrical motors and elevators
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Insulation placement and R values
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Metering
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Air barrier — testing
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Interior lighting power
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Maintenance information
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Lighting in dwelling units
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Air barrier - visual inspection
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Fenestration air leakage
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Protection of exposed foundation insulation
SOORJBALLY HARILALL
06/02/2026
Special inspection requirement — Fenestration areas
SOORJBALLY HARILALL
05/13/2026
Signed off — New Building
PROPOSED 5 STORY MIXED USE BUILDING.
B00750243-S1
05/13/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/11/2026
Permit issued — Boiler Equipment
B01311013-S1-BE
05/07/2026
Filed — Alteration
FILING FOR INSTALLATION AND REGISTRATION OF 3 NEW BOILERS AT BULKHEAD. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01311013-S1
05/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
David Katz
05/07/2026
Special inspection requirement — Maintenance information
David Katz
05/07/2026
Special inspection requirement — Heating Systems
David Katz
05/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
David Katz
04/28/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/23/2026
Signed off — New Building
PROPOSED 5 STORY MIXED USE BUILDING.
B00750243-S6
04/22/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/21/2026
Objection raised — Structural
04/20/2026
Signed off — New Building
PROPOSED 5 STORY MIXED USE BUILDING.
B00750243-S8
04/20/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/16/2026
Filed — New Building
PROPOSED 5 STORY MIXED USE BUILDING.
B00750243-A6
04/15/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SOORJBALLY HARILALL
04/15/2026
Special inspection requirement — Lighting controls
SOORJBALLY HARILALL
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
04/15/2026
Special inspection requirement — Air barrier — testing
SOORJBALLY HARILALL
04/15/2026
Special inspection requirement — Interior lighting power
SOORJBALLY HARILALL
04/15/2026
Special inspection requirement — Insulation placement and R values
SOORJBALLY HARILALL
04/15/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
04/15/2026
Special inspection requirement — Electrical motors and elevators
SOORJBALLY HARILALL
04/15/2026
Special inspection requirement — Fenestration air leakage
SOORJBALLY HARILALL
04/14/2026
Permit issued — Curb Cut
B00750243-S6-CC
04/14/2026
Permit issued — Mechanical Systems
B00750243-S8-MS
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/08/2026
Objection raised — Admin
04/01/2026
Objection raised — Admin
04/01/2026
Objection raised — Scope
03/26/2026
Filed — New Building
PROPOSED 5 STORY MIXED USE BUILDING.
B00750243-A5
03/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/18/2026
Signed off — New Building
PROPOSED 5 STORY MIXED USE BUILDING.
B00750243-S5
02/25/2026
Permit issued — Boiler Equipment
B01311013-I1-BE
02/13/2026
Objection resolved — Addressed
01/27/2026
Objection raised — Other
01/23/2026
Filed — New Building
PROPOSED 5 STORY MIXED USE BUILDING.
B00750243-A4
01/16/2026
Filed — New Building
PROPOSED 5 STORY MIXED USE BUILDING.
B00750243-A3
Latest 60 of 169 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offB&B MECH PLBG & HTG LLC05/11/2026
DOB NOWCurb CutSigned-offEMERALD BUILDERS GROUPLLC04/14/2026
DOB NOWMechanical SystemsSigned-offEMERALD BUILDERS GROUPLLC04/14/2026
DOB NOWBoiler EquipmentSigned-offTARGET PIPING NY LLC02/25/2026
DOB NOWConstruction FenceSigned-offEMERALD BUILDERS GROUPLLC11/20/2025
DOB NOWGeneral ConstructionPermit IssuedEMERALD BUILDERS GROUPLLC10/16/2025
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC06/06/2025
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC05/27/2025
DOB NOWProtection and Mechanical MethodsSigned-offGWT ENTERPRISES INC12/30/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC12/26/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC12/26/2024
DOB NOWFoundationSigned-offEMERALD BUILDERS GROUPLLC11/29/2024
DOB NOWGeneral ConstructionPermit IssuedEMERALD BUILDERS GROUPLLC10/09/2024
DOB NOWConstruction FenceSigned-offEMERALD BUILDERS GROUPLLC10/01/2024
DOB NOWSupport of ExcavationSigned-offEMERALD BUILDERS GROUPLLC10/01/2024
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC05/30/2024
DOB NOWFoundationSigned-offEMERALD BUILDERS GROUPLLC11/30/2023
DOB NOWGeneral ConstructionPermit IssuedEMERALD BUILDERS GROUPLLC10/18/2023
DOB NOWConstruction FenceSigned-offEMERALD BUILDERS GROUPLLC10/10/2023
DOB NOWSupport of ExcavationSigned-offEMERALD BUILDERS GROUPLLC10/10/2023
DOB NOWGeneral ConstructionPermit IssuedCORNERSTONE BUILDERS NY L07/05/2023
DOB NOWGeneral ConstructionPermit IssuedCORNERSTONE BUILDERS NY L06/22/2023
DOB NOWConstruction FenceSigned-offCORNERSTONE BUILDERS NY L04/14/2023
DOB NOWSupport of ExcavationSigned-offCORNERSTONE BUILDERS NY L04/04/2023
1 project · most recent 04/16/2026
Sprinkler System
FiledStatusContractorScope
04/16/2026Signed-offTARGET PIPING NY LLCSprinkler System
1 project · most recent 04/16/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/16/2026Signed-offB&B MECH PLBG & HTG LLCGas, Storm, Water/Sanitary
10 projects · most recent 05/17/2026
General Wiring
FiledStatusContractorScope
05/17/2026CompleteFIRST QUALITY ELECL LLCGeneral Wiring
08/15/2025CancelledFQE ELECTRIC LLC7 meters, 7 new_meters
08/15/2025CancelledFQE ELECTRIC LLCGeneral Wiring
08/15/2025CancelledFQE ELECTRIC LLC—
06/20/2025CompleteFIRST QUALITY ELECL LLC—
06/20/2025CompleteFIRST QUALITY ELECL LLC7 meters, 7 new_meters
05/30/2025CompleteABZ ELECTRIC INC—
02/14/2025CompleteWCK ELECTRIC CORP.—
12/20/2024CompleteSOLAS ELECTRICAL CORP—
05/15/2023CompleteS&R ELECTRICAL & MECHANIC—
1 project · most recent 04/16/2026
Concrete
FiledStatusContractorScope
04/16/2026Signed-offEMERALD BUILDERS GROUPLLCConcrete
1 project · most recent 04/16/2026
Fence
FiledStatusContractorScope
04/16/2026Signed-offEMERALD BUILDERS GROUPLLCFence
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
05/13/2026Pass-Final Boiler Equipment InspectionPassView ↗
04/28/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/22/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
04/20/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2025Pass-Final PL - UndergroundPassView ↗
04/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/06/2025Pass-Final PL - UndergroundPassView ↗
09/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2024Pass-Final PL - UndergroundPassView ↗
09/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/02/2026Air barrier - visual inspectionSOORJBALLY HARILALLenergy_progress
06/02/2026Maintenance informationSOORJBALLY HARILALLenergy_progress
06/02/2026Air barrier — testing SOORJBALLY HARILALLenergy_progress
06/02/2026Fenestration and door U-factor and product ratingsSOORJBALLY HARILALLenergy_progress
06/02/2026Exterior lighting powerSOORJBALLY HARILALLenergy_progress
06/02/2026MeteringSOORJBALLY HARILALLenergy_progress
06/02/2026Lighting controlsSOORJBALLY HARILALLenergy_progress
06/02/2026Electrical motors and elevatorsSOORJBALLY HARILALLenergy_progress
06/02/2026Fenestration air leakageSOORJBALLY HARILALLenergy_progress
06/02/2026Lighting in dwelling unitsSOORJBALLY HARILALLenergy_progress
06/02/2026Protection of exposed foundation insulationSOORJBALLY HARILALLenergy_progress
06/02/2026Interior lighting powerSOORJBALLY HARILALLenergy_progress
06/02/2026Insulation placement and R valuesSOORJBALLY HARILALLenergy_progress
06/02/2026Fenestration areasSOORJBALLY HARILALLenergy_progress
06/02/2026Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
06/02/2026Fire-Resistance Rated ConstructionSOORJBALLY HARILALLprogress
06/02/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
05/07/2026Heating SystemsDavid Katzspecial
05/07/2026HVAC-R and service water heating system controlsDavid Katzenergy_progress
05/07/2026HVAC-R and service water heating equipmentDavid Katzenergy_progress
05/07/2026Maintenance informationDavid Katzenergy_progress
04/15/2026MeteringSOORJBALLY HARILALLenergy_progress
04/15/2026Maintenance informationSOORJBALLY HARILALLenergy_progress
04/15/2026Protection of exposed foundation insulationSOORJBALLY HARILALLenergy_progress
04/15/2026Lighting in dwelling unitsSOORJBALLY HARILALLenergy_progress
Latest 25 of 150.
▾Documents — 195 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
08/23/2026B01159847-I1Request digital key ↗
08/23/2026B01159886-I1Request digital key ↗
08/17/2026B00750243-P1Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits6
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
12/02/2025322122760Open ↗
12/02/2025322122760Open ↗
12/02/2025322122760Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
11/26/2025322122760Open ↗
02/22/2023340880416Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
02/22/2023340880416Open ↗
▸Zoning, Tax Lot & Property Records16
▸DOB NOWZD1: DOB Zoning Diagram5
08/17/2026B00750243-A6Open ↗
08/13/2026B00750243-A4Open ↗
08/13/2026B00750243-A3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/17/2026B00750243-A6Open ↗
08/13/2026B00750243-A3Open ↗
08/13/2026B00750243-P7Open ↗
Showing 3 of 5 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
12/05/2025322122760Open ↗
12/05/2025322122760Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/05/2025322122760Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/05/2025322122760Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
12/05/2025322122760Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00750243-I1Open ↗
▸Seals & Professional Certifications73
▸DOB NOWProgress Inspector Seal & Signature25
09/19/2026B00750243-P9Open ↗
09/19/2026B00750243-P9Open ↗
09/19/2026B00750243-P9Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/17/2026B00750243-P1Open ↗
08/17/2026B00750243-A6Open ↗
08/17/2026B00750243-A5Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/19/2026B00750243-P9Open ↗
09/19/2026B00750243-P9Open ↗
09/19/2026B00750243-P9Open ↗
Showing 3 of 22 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/22/2023340880416Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/22/2023340880416Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
08/13/2026B00750243-P3Open ↗
08/13/2026B00750243-P9Open ↗
08/13/2026B00750243-S1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection15
▸DOB NOWStreet Tree Checklist8
08/17/2026B00750243-A3Open ↗
08/17/2026B00750243-A6Open ↗
08/17/2026B00750243-P7Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStreet Tree Sign Off2
08/17/2026B00750243-I1Open ↗
08/15/2026B00750243-S1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026B00750243-S1Open ↗
08/13/2026B00750243-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/03/2023340880416Open ↗
▸BISSTREET TREE CHECKLIST1
05/03/2023340880416Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00750243-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis1
08/17/2026B00750243-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/17/2026B01311013-I1Open ↗
▸Inspections & Test Reports12
▸DOB NOWSOIL REPORT9
08/13/2026B00750243-P2Open ↗
08/13/2026B00750243-P9Open ↗
08/13/2026B00750243-P5Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00750243-S1Open ↗
08/13/2026B00750243-S7Open ↗
▸DOB NOWTR5 Test Report1
08/15/2026B00750243-S1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION7
12/05/2025322122760Open ↗
12/05/2025322122760Open ↗
12/05/2025322122760Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY OR SCHEDULE A1
12/05/2025322122760Open ↗
▸Filing & Intake Forms3
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/03/2023340880416Open ↗
▸BISEFILING COVER SHEET1
11/26/2025322122760Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/22/2023340880416Open ↗
▸Other Documents29
▸DOB NOWSite Survey: Initial8
08/17/2026B00750243-A6Open ↗
08/13/2026B00750243-A4Open ↗
08/13/2026B00750243-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
08/17/2026B00750243-A6Open ↗
08/13/2026B00750243-S1Open ↗
08/13/2026B00750243-P9Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProperty Ownership Certification5
08/17/2026B00750243-A6Open ↗
08/17/2026B00750243-A3Open ↗
08/17/2026B00750243-P7Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM PD 1 WITH TOPOGRAPHICAL STA1
12/05/2025322122760Open ↗
▸BISNYC DIGITAL TAX MAP1
12/05/2025322122760Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/26/2025322122760Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
12/05/2025322122760Open ↗
▸BISPLOT DIAGRAM1
12/05/2025322122760Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
05/03/2023340880416Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00750243-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00750243-S7Open ↗