Five to six families
131 NORTH 6 STREET
BROOKLYN · BIN 3390229
💬 Discuss this project
2002Year Built
4Stories
C2Building Class
M1-2/R6AZoning
—Gross Floor Area
5Units
7 Open Violations 5 unresolved · 2 paperwork only ▸FDNY Report ↗
Five to six families · 2 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof7p · 2 filings · 20 docs
Floor 46p · 2 filings · 20 docs
Floor 36p · 2 filings · 20 docs
Floor 26p · 2 filings · 20 docs
Floor 15p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALLAN YANG ARCHITECT, P.C.208/25/2026
NASIR J, KHANZADA LLC312/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NASIR J. KHANZADA LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NUFORM CONSTRUCTION INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NASIR J. KHANZADA LLC1527312/24/2025
Building Lifecycle
All (72)Filed (5)Permit Issued (1)Violation (26)Inspection (4)Objection (10)Special Inspection (26)
08/25/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FIRST FLOOR FRONT AND REAR ENLARGEMENT WITH PARTIAL CONVERSION INTO A RETAIL SPACE. EXISTING RESIDENTIAL APARTMENTS ABOVE THE FIRST FLOOR WILL REMAIN. THE SCOPE OF WORK ALSO INCLUDES CELLAR AND FIRST FLOOR INTERIOR RENOVATION.
B01443755-I1
08/10/2026
Special inspection requirement — Fenestration air leakage
08/10/2026
Special inspection requirement — Insulation placement and R values
08/10/2026
Special inspection requirement — Air barrier - visual inspection
08/10/2026
Special inspection requirement — Fenestration areas
08/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
08/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/10/2026
Special inspection requirement — Energy Code Compliance Inspections
08/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/10/2026
Special inspection requirement — Interior lighting power
08/10/2026
Special inspection requirement — Maintenance information
05/08/2026
Violation issued (HPD, open)
A
03/31/2026
Filed — Alteration CO
FIRST FLOOR FRONT AND REAR ENLARGEMENT WITH PARTIAL CONVERSION INTO A RETAIL SPACE. EXISTING RESIDENTIAL APARTMENTS ABOVE THE FIRST FLOOR WILL REMAIN. THE SCOPE OF WORK ALSO INCLUDES CELLAR AND FIRST FLOOR INTERIOR RENOVATION.
B01353615-I1
12/30/2025
Objection resolved — Addressed
12/30/2025
Special inspection requirement — Exterior lighting power
Nasir Khanzada
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
12/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
12/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
12/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nasir Khanzada
12/29/2025
Objection raised — Cost
12/24/2025
Filed — Alteration CO
RENOVATION OF ROOF AREA FOR 5 FAMILY DWELLING AND TO REVISE CERTIFICATE OF OCCUPANCY.
B00599227-P3
12/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
12/23/2025
Special inspection requirement — Exterior lighting power
Nasir Khanzada
12/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nasir Khanzada
12/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
12/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2025
Violation issued (HPD, closed)
I
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
10/16/2025
Violation issued (ECB, open)
Construction
10/16/2025
Violation issued (ECB, open)
Construction
06/13/2025
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, closed)
I
04/16/2024
Violation issued (HPD, closed)
A
03/30/2023
Violation issued (HPD, closed)
A
11/15/2022
Violation issued (HPD, closed)
I
10/26/2022
Filed — Alteration CO
RENOVATION OF ROOF AREA FOR 5 FAMILY DWELLING AND TO REVISE CERTIFICATE OF OCCUPANCY.
B00599227-P2
10/26/2022
Objection raised — Structural
10/26/2022
Objection raised — Structural
10/26/2022
Objection raised — Fire_Protection
10/26/2022
Objection raised — Other
10/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
10/25/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
10/25/2022
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
10/25/2022
Special inspection requirement — Fire-Resistance Rated Construction
Nasir Khanzada
10/25/2022
Special inspection requirement — Exterior lighting power
Nasir Khanzada
10/20/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/21/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/08/2022
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/19/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2022
Violation issued (ECB, closed)
Construction
12/10/2021
Permit issued — General Construction
B00599227-I1-GC
10/26/2021
Violation issued (ECB, open)
Construction
09/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNUFORM CONSTRUCTION INC12/10/2021
BIS—ISSUEDCHESTER CONTRACTING CORP02/18/2005
BISEQISSUEDCHESTER CONTRACTING CORP12/10/2004
BISPLISSUEDHADERA PLBG & HTG CORP04/14/2004
BISBLISSUEDHADERA PLBG & HTG CORP04/02/2004
BIS—ISSUEDCHESTER CONTRACTING CORP03/19/2003
BIS—ISSUEDCHESTER CONTRACTING CORP12/03/2002
BISEQISSUEDCHESTER CONTRACTING CORP12/03/2002
BISPLISSUEDHADERA PLBG & HTG CORP08/02/2002
BIS—ISSUEDCHESTER CONTRACTING CORP03/26/2002
BISEQISSUEDCHESTER CONTRACTING CORP03/19/2002
BISEQISSUEDSAFWAY STEEL PRODUCTS, INC.03/14/2002
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/20/2022Pass-Final CND-Occupancy InspectionPassView ↗
04/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
08/10/2026Fenestration air leakage—energy_progress
08/10/2026Insulation placement and R values—energy_progress
08/10/2026Air barrier - visual inspection—energy_progress
08/10/2026Fenestration areas—energy_progress
08/10/2026Fenestration and door U-factor and product ratings—energy_progress
08/10/2026Structural Stability – Alterations of existing buildings—special
08/10/2026Fire-Resistant Penetrations and Joints—special
08/10/2026Energy Code Compliance Inspections—progress
08/10/2026Fire-Resistance Rated Construction—progress
08/10/2026Interior lighting power—energy_progress
08/10/2026Maintenance information—energy_progress
12/30/2025Exterior lighting powerNasir Khanzadaenergy_progress
12/30/2025Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
12/30/2025Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
12/30/2025Energy Code Compliance InspectionsNasir Khanzadaprogress
12/30/2025Fire-Resistance Rated ConstructionNasir Khanzadaprogress
12/23/2025Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
12/23/2025Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
12/23/2025Exterior lighting powerNasir Khanzadaenergy_progress
12/23/2025Fire-Resistance Rated ConstructionNasir Khanzadaprogress
12/23/2025Energy Code Compliance InspectionsNasir Khanzadaprogress
10/25/2022Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
10/25/2022Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
10/25/2022Energy Code Compliance InspectionsNasir Khanzadaprogress
10/25/2022Fire-Resistance Rated ConstructionNasir Khanzadaprogress
Latest 25 of 26.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026B01443755-I1Request digital key ↗
08/19/2026B00599227-I1Request digital key ↗
08/19/2026B00599227-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/26/2026B01443755-I1Open ↗
08/17/2026B01353615-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00599227-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B00599227-P2Open ↗
09/01/2026B00599227-P2Open ↗
09/01/2026B00599227-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00599227-P2Open ↗
09/01/2026B00599227-P2Open ↗
08/29/2026B00599227-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026B01443755-I1Open ↗
08/17/2026B01353615-I1Open ↗
08/13/2026B00599227-P2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026B00599227-P2Open ↗
08/13/2026B00599227-I1Open ↗
08/13/2026B00599227-P3Open ↗
▸DOB NOWHPD-1: Anti-Harassment Area Checklist3
08/13/2026B00599227-P2Open ↗
08/13/2026B00599227-P3Open ↗
08/13/2026B00599227-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00599227-I1Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification3
08/13/2026B00599227-P2Open ↗
08/13/2026B00599227-I1Open ↗
08/13/2026B00599227-P3Open ↗
▸DOB NOWSite Survey: Initial2
08/26/2026B01443755-I1Open ↗
08/17/2026B01353615-I1Open ↗
▸DOB NOWPlot Diagram1
08/17/2026B01353615-I1Open ↗