← Back
BuildNYC
One family attached or semi-detached
131 VESPA AVENUE
STATEN ISLAND · BIN 5092289
💬 Discuss this project
1986Year Built
3Stories
A5Building Class
R3XZoning
2,052 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One family attached or semi-detached · 2,754 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation1p · 1 filing · 9 docs
Floor 21p · 1 filing · 8 docs
Floor 1
Site & exterior1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering110/16/2024
Ronald D.victorio R.A205/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jon AdamoGeneral Contractor403/21/2026
Sunrun Installation ServiceGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272110/16/2024
A Tech Engineering NYC, P6738205/28/2024
Building Lifecycle
12/09/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01124444-I1
10/21/2024
Permit issued — Solar
S01124444-I1-SL
10/16/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01124444-I1
10/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
24 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service10/21/2024
DOB NOWStructuralSigned-offJon Adamo09/06/2024
DOB NOWFoundationSigned-offJon Adamo08/23/2024
1 project · most recent 10/16/2024
FiledStatusContractorScope
10/16/2024CompleteSunrun Solar Electl—
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
10/09/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/09/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/09/2024Energy Code Compliance InspectionsWalid Abdullaprogress
10/09/2024FinalWalid Abdullaprogress
10/09/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
05/15/2024Structural Stability – Alterations of existing buildingsanthony santorospecial
05/15/2024Concrete - Cast-In-Placeanthony santorospecial
05/15/2024Finalanthony santoroprogress
05/15/2024Structural Wood Frameanthony santoroprogress
05/15/2024Subgrade Inspectionsanthony santorospecial
05/15/2024Structural Stability – Alterations of existing buildingsanthony santorospecial
05/15/2024Finalanthony santoroprogress
05/15/2024Footing and Foundationanthony santoroprogress
17 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account