← Back
BuildNYC
Zoned commercial or Manhattan residential
131 WEST 133RD STREET
MANHATTAN · BIN 1091609
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R7-2Zoning
0 sfGross Floor Area
0Units
Zoned commercial or Manhattan residential · Owner of record: NYC Housing Preservation and Development · 3,324 sf lot · 0 FAR built · Flood zone X
Locations of Work
Structural
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCentral Harlem - Open Door3 filings · 11 docs
Floor 6Central Harlem - Open Door3 filings · 11 docs
Floor 5Central Harlem - Open Door3 filings · 11 docs
Floor 4Central Harlem - Open Door3 filings · 11 docs
Floor 3Central Harlem - Open Door3 filings · 11 docs
Floor 2Central Harlem - Open Door3 filings · 11 docs
Floor 1Central Harlem - Open Door3 filings · 11 docs
CellarCentral Harlem - Open Door3 filings · 11 docs
Filed — no permit issuedSupport of excavation and foundation work6p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ettinger Engineering Associates203/24/2022
Cityscape203/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates303/21/2026
DVA Advisors103/21/2026
Building Lifecycle
All (44)Filed (4)Objection (32)Special Inspection (8)
04/05/2022
Objection raised — Mechanical
04/05/2022
Objection resolved — Addressed
04/05/2022
Objection raised — Other
04/05/2022
Objection resolved — Addressed
04/05/2022
Objection raised — Admin
04/05/2022
Objection resolved — Addressed
04/05/2022
Objection raised — Other
04/05/2022
Objection resolved — Addressed
04/05/2022
Objection raised — Inspections
04/05/2022
Objection resolved — Addressed
04/05/2022
Objection raised — Structural
04/05/2022
Objection resolved — Addressed
04/05/2022
Objection raised — Admin
04/05/2022
Objection resolved — Addressed
03/24/2022
Filed — Alteration
Install new plumbing system in conjunction with NB# 121208004
M00350160-I1
03/12/2022
Objection raised — Other
03/12/2022
Objection raised — Other
03/12/2022
Objection raised — Admin
03/12/2022
Objection raised — Structural
03/07/2022
Filed — Alteration
Structural work in conjunction with NB# 121208004
M00419704-I1
02/18/2022
Special inspection requirement — Concrete - Cast-In-Place
02/18/2022
Special inspection requirement — Concrete - Precast
02/18/2022
Special inspection requirement — Masonry
02/18/2022
Special inspection requirement — Structural Cold-Formed Steel
02/18/2022
Special inspection requirement — Structural Steel - Details
02/18/2022
Special inspection requirement — Structural Steel - Welding
12/19/2021
Objection raised — Admin
12/19/2021
Objection raised — Structural
12/19/2021
Objection raised — Other
12/19/2021
Objection raised — Other
12/19/2021
Objection raised — Other
12/19/2021
Objection raised — Energy
12/19/2021
Objection raised — Other
12/19/2021
Objection raised — Structural
12/19/2021
Objection raised — Other
11/30/2021
Filed — Alteration
SOE work in conjunction with NB# 121208004
M00575430-I1
11/01/2021
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
10/27/2020
Special inspection requirement — Final
05/13/2020
Objection raised — Zoning
05/13/2020
Objection raised — Energy
05/13/2020
Objection raised — Scope
05/13/2020
Objection raised — Admin
05/13/2020
Objection raised — Fire_Protection
05/11/2020
Filed — Alteration
Install new mechanical systems in conjunction with NB# 121208004
M00348007-I1
Nothing on file for this building.
1 project · most recent 05/11/2020
Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
05/11/2020——Air Conditioning Systems, Associated Ducts and Piping
Cooling
Innova HPAC SP92 10,500 BTU · Ptac ×22
HPAC SE92 10,500 BTU · Ptac ×11
HPAC KE92 15,100 BTU · Ptac ×1
Lg ARUN024GSS4 22,000 BTU · Vrf Outdoor ×1
1 project · most recent 03/24/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/24/2022——Gas, Storm, Water/Sanitary
2 projects · most recent 03/07/2022
Steel Concrete Masonry
FiledStatusContractorScope
03/07/2022——Steel, Concrete, Masonry
11/30/2021——2 scope_items
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
02/18/2022Concrete - Cast-In-Place—special
02/18/2022Concrete - Precast—special
02/18/2022Masonry—special
02/18/2022Structural Cold-Formed Steel—special
02/18/2022Structural Steel - Details—special
02/18/2022Structural Steel - Welding—special
11/01/2021Excavations - Sheeting, Shoring, and Bracing—special
10/27/2020Final—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Central Harlem - Open DoorOfficeCellar, Floors 1–6, Roof
Project M00348007 Alteration · Objections · 05/11/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch1
08/15/2026M00575430-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/14/2026M00350160-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00348007-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026M00419704-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION7
04/07/2025121208004Open ↗
03/21/2025121208004Open ↗
06/28/2022121208004Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
02/10/2022141007577Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
05/05/2022121208004Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00575430-I1Open ↗
09/02/2026M00350160-I1Open ↗
08/13/2026M00419704-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/10/2022141007577Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/10/2022141007577Open ↗
▸Trade Schedules & Equipment1
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
05/05/2022121208004Open ↗
▸Safety & Tenant Protection2
▸BISBPP: STREET TREES SITE PLAN1
02/10/2022141007577Open ↗
▸BISSTREET TREE CHECKLIST1
06/15/2022121208004Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/06/2021121208004Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY7
07/11/2022121208004Open ↗
06/15/2022121208004Open ↗
06/15/2022121208004Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/05/2022121208004Open ↗
▸BISSOIL REPORT1
05/05/2022121208004Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/15/2026M00575430-I1Open ↗
08/14/2026M00350160-I1Open ↗
08/13/2026M00419704-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
05/04/2022121208004Open ↗
02/08/2022121208004Open ↗
06/02/2020121208004Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
05/05/2022121208004Open ↗
02/10/2022141007577Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/15/2026M00575430-I1Open ↗
08/13/2026M00419704-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/15/2026M00575430-I1Open ↗
08/13/2026M00419704-I1Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
07/11/2022121208004Open ↗
07/11/2022121208004Open ↗
05/05/2022121208004Open ↗
▸BISEFILING COVER SHEET1
06/02/2020121208004Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/10/2022141007577Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/11/2022121208004Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/05/2022121208004Open ↗