1924Year Built
9Stories
J4Building Class
C6-6.5Zoning
181,503 sfGross Floor Area
1Units
LL97 Covered23 Open Violations 17 unresolved · 6 paperwork only ▸FISP: UNSAFE
Legitimate theatre, sole use · Owner of record: NYC DEPARTMENT OF CULTURAL AFFAIRS · 25,154 sf lot · 7.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof5p · 2 filings · 20 docs
Floor 64p · 1 filing · 20 docs
Floor 53p · 1 filing · 20 docs
Floor 43p · 1 filing · 20 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY407/08/2026
NYC DEPARTMENT OF CULTURAL AFFAIRS103/22/2026
CULTURAL AFFAIRS 2 1103/22/2026
NY CITY CENTRE INC103/22/2026
CULTURAL AFFAIRS 2403/22/2026
CITY CENTER- 55TH ST T303/22/2026
CITY CENTER 55 THEATER FO103/22/2026
DRAMA INC103/22/2026
DIVISION OF REAL PROPERTY203/22/2026
CITY CENTER 55TH ST THEATRE1703/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS403/21/2026
BOYD CONSULTING203/21/2026
Rigid Structural Design, LLC203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M&A PROJECTS RESTORATION*General Contractor303/21/2026
ANTHONY LUCIANOElectrical203/21/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor207/08/2026
TROADIO MENENDEZElectrical103/21/2026
PHOENIX SUTTON STR INCGeneral Contractor107/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor107/08/2026
Building Lifecycle
All (132)Filed (9)Permit Issued (5)Signed Off (4)Facade (FISP) (19)Violation (60)Objection (14)Special Inspection (21)
03/03/2026
Objection resolved — Addressed
02/23/2026
Objection resolved — Addressed
02/23/2026
Objection resolved — Addressed
02/23/2026
Objection resolved — Addressed
01/22/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/02/2026
Objection raised — Cost
01/02/2026
Objection raised — Scope
12/30/2025
Objection raised — Admin
12/30/2025
Objection raised — Admin
12/22/2025
Objection raised — Scope
12/22/2025
Objection raised — Admin
12/22/2025
Objection raised — Admin
12/19/2025
Filed — Alteration
THE SCOPE OF WORK INCLUDES UPGRADING ROOFTOP HVAC EQUIPMENT AND ITS SUPPORTING DUNNAGE TO ALLOW FOR A NEW CHILLER ANDPUMP PACKAGE. INSTALL NEW AND REPLACE EXISTING LOUVERS, NEW RATED PARTIONS AS PER PLANS
M01313631-S2
12/18/2025
Filed — Alteration
THE SCOPE OF WORK INCLUDES UPGRADING ROOFTOP HVAC EQUIPMENT AND ITS SUPPORTING DUNNAGE TO ALLOW FOR A NEW CHILLER ANDPUMP PACKAGE. INSTALL NEW AND REPLACE EXISTING LOUVERS, NEW RATED PARTIONS AS PER PLANS
M01313631-S3
12/17/2025
Special inspection requirement — Energy Code Compliance Inspections
12/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
12/17/2025
Special inspection requirement — Duct leakage testing, insulation and design
12/17/2025
Special inspection requirement — Electrical motors and elevators
12/17/2025
Special inspection requirement — Maintenance information
12/17/2025
Special inspection requirement — Metering
12/17/2025
Special inspection requirement — Ventilation and air distribution system
12/17/2025
Special inspection requirement — Shutoff dampers
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/17/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
12/17/2025
Special inspection requirement — Heating Systems
12/17/2025
Special inspection requirement — Energy Code Compliance Inspections
12/16/2025
Signed off — Alteration
M00984106-I1
12/15/2025
Filed — Alteration
THE SCOPE OF WORK INCLUDES UPGRADING ROOFTOP HVAC EQUIPMENT AND ITS SUPPORTING DUNNAGE TO ALLOW FOR A NEW CHILLER ANDPUMP PACKAGE. INSTALL NEW AND REPLACE EXISTING LOUVERS, NEW RATED PARTIONS AS PER PLANS
M01313631-S1
12/10/2025
Filed — Alteration
THE SCOPE OF WORK INCLUDES UPGRADING ROOFTOP HVAC EQUIPMENT AND ITS SUPPORTING DUNNAGE TO ALLOW FOR A NEW CHILLER ANDPUMP PACKAGE. INSTALL NEW AND REPLACE EXISTING LOUVERS, NEW RATED PARTIONS AS PER PLANS
M01313631-I1
11/04/2025
Special inspection requirement — Structural Steel - Details
11/04/2025
Special inspection requirement — Structural Steel - Welding
11/04/2025
Special inspection requirement — Final
11/04/2025
Special inspection requirement — Structural Steel - High Strength Bolting
11/04/2025
Special inspection requirement — Mechanical Systems
11/04/2025
Special inspection requirement — Final
11/04/2025
Special inspection requirement — Final
09/30/2024
Signed off — Alteration
M00933613-I1
05/09/2024
Cycle 9 facade report submitted
05/01/2024
Cycle 9 facade inspection completed
03/05/2024
Signed off — Alteration
Filing for limited masonry repairs at facade to address unsafe conditions as per drawings. No change in use, egress or occupancy is involved under this application.
M00941741-I1
03/04/2024
Permit issued — General Construction
M00941741-I1-GC
01/16/2024
Violation issued (ECB, open)
Local Law
01/03/2024
Filed — Alteration
M00984106-I1
01/03/2024
Permit issued — Supported Scaffold
M00984106-I1-SF
11/21/2023
Cycle 9 facade report submitted
11/09/2023
Cycle 9 facade report signed — UNSAFE
10/19/2023
Filed — Alteration
Filing for limited masonry repairs at facade to address unsafe conditions as per drawings. No change in use, egress or occupancy is involved under this application.
M00941741-I1
10/11/2023
Permit issued — Sidewalk Shed
M00933613-I1-SH
10/09/2023
Cycle 9 facade inspection completed
10/04/2023
Filed — Alteration
M00933613-I1
10/02/2023
Special inspection requirement — Final
Robert Bates
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/30/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/30/2020
Violation issued (ECB, open)
Elevators
10/06/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/16/2020
Violation issued (ECB, open)
Construction
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offM&A PROJECTS RESTORATION*03/04/2024
DOB NOWSupported ScaffoldSigned-offINTERSYSTEMS INSTAL S&S01/03/2024
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S10/11/2023
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC05/29/2019
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/16/2018
BISOTISSUEDAM&G WATERPROOFING LLC04/16/2019
BISPLISSUEDKEW FOREST PLBG & HTG INC02/05/2019
BISOTISSUEDAM&G WATERPROOFING LLC06/15/2018
BISPLISSUEDPAR PLUMBING CO., INC06/07/2018
BISOTISSUEDWESTERMAN CONSTRUCTION CO05/17/2018
BISOTISSUEDWESTERMAN CONSTRUCTION CO05/17/2018
BISOTISSUEDWESTERMAN CONSTRUCTION CO05/17/2018
BISMHISSUEDWESTERMAN CONSTRUCTION CO05/17/2018
BISPLISSUEDKEW FOREST PLBG & HTG INC08/10/2017
BISOTISSUEDWESTERMAN CONSTRUCTION CO08/02/2017
BISMHISSUEDWESTERMAN CONSTRUCTION CO08/02/2017
BISOTISSUEDWESTERMAN CONSTRUCTION CO08/02/2017
BISOTISSUEDMANHATTAN THEATRE CLUB IN05/25/2017
BISPLISSUEDAUTHENTIC PLBG CORP12/29/2015
BISMHISSUEDN.Y. LANDMARK CONSTRUCTIO12/28/2015
BISOTISSUEDN.Y. LANDMARK CONSTRUCTIO10/27/2015
BISOTISSUEDN.Y. LANDMARK CONSTRUCTIO09/24/2015
BISSPISSUEDWELKIN FIRE PROTECTION LL01/07/2015
BISPLISSUEDTHOMAS F. CASH & SONS INC08/13/2014
BISMHISSUEDCONSTRUCTION SCIENCE CORP08/11/2014
BISOTISSUEDCONSTRUCTION SCIENCE CORP08/11/2014
BISEQISSUEDPJP INSTALLERS INC06/20/2014
BISEQISSUEDPJP INSTALLERS INC06/19/2014
BIS—ISSUEDRED HOOK SIGN AND ELECT02/03/2014
BISPLISSUEDCRESCENT CONTRG CORP04/09/2013
BISOTISSUEDS. DIGIACOMO & SON INC09/07/2012
BISSPISSUEDASCO SPRINKLER CO.,INC05/25/2012
BISOTRE-ISSUEDS. DIGIACOMO & SON INC05/21/2012
BISMHISSUEDS. DIGIACOMO & SON INC05/21/2012
BISOTRE-ISSUEDS. DIGIACOMO & SON INC05/21/2012
BISOTISSUEDF.J. SCIAME CONSTRUC CO I10/20/2011
BISOTISSUEDF.J. SCIAME CONSTRUC CO I10/20/2011
BISOTISSUEDF.J. SCIAME CONSTRUC CO I10/20/2011
BIS—ISSUEDRED HOOK SIGN AND ELECT C10/03/2011
BIS—ISSUEDRED HOOK SIGN AND ELECT C10/03/2011
+ 15 more permits on file
1 project · most recent 12/19/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/19/2025——Heating and Air Conditioning Systems
Heat / Cool
Aaon V3-C RB-8-0-28FC-41F 3,000 CFM · Ahu ×6
Trane ×1
1 project · most recent 12/19/2025
Water/Sanitary
FiledStatusContractorScope
12/19/2025——Water/Sanitary
5 projects · most recent 09/11/2023
General Wiring
FiledStatusContractorScope
09/11/2023CompleteAUR0RA ELECL CONTG INC—
08/09/2021CompleteJAM ELECTRICAL CORP—
10/11/2019Permit IssuedABSOLUTE ELEC'L CONTRG OFGeneral Wiring
05/21/2019CompleteTOP SHELF ELECTRIC CORP—
03/07/2018CompleteELPO ELECTRICAL CONTG INC—
1 project · most recent 12/19/2025
Steel
FiledStatusContractorScope
12/19/2025——Steel
1 project · most recent 05/28/2019
Sidewalk Shed
FiledStatusContractorScope
05/28/2019Permit IssuedPLATINUM SERVICES NY LLCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
12/17/2025Energy Code Compliance Inspections—progress
12/17/2025Fire-Resistance Rated Construction—progress
12/17/2025Duct leakage testing, insulation and design—energy_progress
12/17/2025Electrical motors and elevators—energy_progress
12/17/2025Maintenance information—energy_progress
12/17/2025Metering—energy_progress
12/17/2025Ventilation and air distribution system—energy_progress
12/17/2025Shutoff dampers—energy_progress
12/17/2025Fire-Resistant Penetrations and Joints—special
12/17/2025Fire-Resistant Penetrations and Joints—special
12/17/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
12/17/2025Heating Systems—special
12/17/2025Energy Code Compliance Inspections—progress
11/04/2025Structural Steel - Details—special
11/04/2025Structural Steel - Welding—special
11/04/2025Final—progress
11/04/2025Structural Steel - High Strength Bolting—special
11/04/2025Mechanical Systems—special
11/04/2025Final—progress
11/04/2025Final—progress
10/02/2023FinalRobert Batesprogress
▾Documents — 920 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
09/06/2026M00027753-I1Request digital key ↗
08/29/2026M00933613-I1Request digital key ↗
08/28/2026M00941741-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00171069-I1Request digital key ↗
▸Applications & Permits209
▸BISPLAN / WORK APPROVAL APPLICATION103
06/01/2021123348724Open ↗
08/13/2018123224395Open ↗
07/03/2018123224395Open ↗
Showing 3 of 103 on file for this type
▸BISWORK PERMIT APPLICATION77
04/17/2019123190787Open ↗
06/15/2018123190787Open ↗
06/12/2018123410022Open ↗
Showing 3 of 77 on file for this type
▸BISPLACE OF ASSEMBLY20
05/12/2015120344056Open ↗
05/12/2015120344047Open ↗
05/12/2015120844168Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWLPC Approval/Permit5
08/13/2026M00941741-I1Open ↗
08/13/2026M01313631-I1Open ↗
08/13/2026M01313631-S3Open ↗
Showing 3 of 5 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications209
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION158
04/16/2018123410022Open ↗
04/16/2018123410022Open ↗
04/16/2018123410022Open ↗
Showing 3 of 158 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST20
07/31/2017123348724Open ↗
06/14/2017123083279Open ↗
01/21/2016122638048Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/05/2026M00171069-I1Open ↗
08/29/2026M00933613-I1Open ↗
08/28/2026M00941741-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
07/31/2017123348724Open ↗
07/31/2017123348724Open ↗
06/14/2017123083279Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026M00941741-I1Open ↗
▸Trade Schedules & Equipment79
▸BISSCHEDULE B - PLUMBING18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISSELF-CERT PLUMBING NOTICE16
02/05/2015121972231Open ↗
10/28/2014121972222Open ↗
Showing 2 of 16 on file for this type
▸BISEQUIPMENT USE PERMITS15
04/28/2021123410022Open ↗
Showing 1 of 15 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
04/28/2021123410022Open ↗
04/28/2021123410022Open ↗
Showing 2 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
05/23/2018123410022Open ↗
04/16/2018123410022Open ↗
07/31/2017123348724Open ↗
Showing 3 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
10/22/2015122569666Open ↗
Showing 1 of 4 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-843
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSIGN HANGER CERTIFICATE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM5
04/16/2018123410022Open ↗
04/12/2018123190787Open ↗
Showing 2 of 5 on file for this type
▸BISTenant Protection Plan and Notes3
04/16/2018123410022Open ↗
02/02/2018123190787Open ↗
08/03/2017123348724Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos36
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
04/16/2018123410022Open ↗
02/02/2018123190787Open ↗
01/31/2018123224395Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT CONDITIONAL COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/28/2026M00941741-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/16/2018123410022Open ↗
06/14/2017123083279Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE2
04/16/2018123410022Open ↗
07/31/2017123348724Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY7
07/19/2021123190787Open ↗
07/19/2021123190787Open ↗
06/01/2021123348724Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
05/18/2018123410022Open ↗
▸Approvals, Objections & Sign-offs141
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST47
07/22/2021123190787Open ↗
06/01/2021123348724Open ↗
04/28/2021123410022Open ↗
Showing 3 of 47 on file for this type
▸BISADMINISTRATIVE OBJECTIONS30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISLANDMARKS APPROVAL22
05/18/2018123410022Open ↗
10/02/2017123083279Open ↗
09/26/2017122638048Open ↗
Showing 3 of 22 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
05/18/2018123410022Open ↗
05/18/2018123410022Open ↗
05/18/2018123410022Open ↗
Showing 3 of 10 on file for this type
▸BISCCD1-Construction Code Determination6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026M00941741-I1Open ↗
08/13/2026M01313631-S3Open ↗
08/13/2026M01313631-S1Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS SIGNOFF3
07/22/2021123190787Open ↗
06/01/2021123348724Open ↗
04/28/2021123410022Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026M01313631-S3Open ↗
08/13/2026M01313631-S1Open ↗
08/13/2026M01313631-S2Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership72
▸BISCOST AFFIDAVIT72
07/19/2021123190787Open ↗
06/01/2021123348724Open ↗
04/28/2021123410022Open ↗
Showing 3 of 72 on file for this type
▸Filing & Intake Forms91
▸BISEFILING COVER SHEET55
04/16/2018123410022Open ↗
04/16/2018123410022Open ↗
04/16/2018123410022Open ↗
Showing 3 of 55 on file for this type
▸BISADDITIONAL INFORMATION31
05/18/2018123410022Open ↗
05/07/2018123190787Open ↗
04/12/2018123190787Open ↗
Showing 3 of 31 on file for this type
▸BISBOROUGH INTAKE FORM4
05/03/2018123190787Open ↗
10/02/2017123083279Open ↗
09/26/2017122638048Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents38
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION31
06/01/2021123348724Open ↗
06/15/2018123190787Open ↗
04/19/2018123190787Open ↗
Showing 3 of 31 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProof of Historic Building1
08/13/2026M00941741-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00027753-I1Open ↗