← Back
BuildNYC
Church, synagogue, chapel
The Jewish Center
131 WEST 86TH STREET · BIN 1032193
💬 Discuss this project
1920Year Built
11Stories
M1Building Class
R10AZoning
47,584 sfGross Floor Area
3Units
LL97 Covered0 Active ViolationsFISP: SAFE
Church, synagogue, chapel · 6,644 sf lot · 7.16 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSmith School4p · 1 filing · 8 docs
Floor 2The Jewish Center, Smith SchoolUnder Construction2p · 3 filings · 15 docs
Floor 1The Jewish Center, Smith SchoolUnder Construction3p · 3 filings · 15 docs
CellarThe Jewish Center, Smith SchoolUnder Construction4p · 3 filings · 15 docs
Site & exteriorSmith School3p · 1 filing · 1 doc
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Jerrick Associates407/08/2026
Park Ave Court Condominium103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PBDW Architects207/16/2026
JFK Associates206/12/2026
Robert Silman Associates106/10/2026
Newtec Engineering109/22/2025
Feingold and Gregory Architects106/04/2024
Paul Perdek, Prof. Engineering105/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Stonecore203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Borowide Elect'l ContractorsElectrical303/21/2026
RPJ ElectricElectrical103/21/2026
Pro Max Elect'l ContractingElectrical103/21/2026
Arista Air Conditioningspecialty_contractor107/08/2026
JRM Construction ManagementGeneral Contractor108/11/2026
Acker Electric CoElectrical103/21/2026
Jerrick AssociatesScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI Agency254306/12/2026
Obaid Mian849109/22/2025
Feingold & Gregory Architects979106/04/2024
Building Lifecycle
All (96)Filed (8)Permit Issued (3)Signed Off (2)Facade (FISP) (12)Violation (34)Objection (7)Special Inspection (30)
08/10/2026
Permit issued — General Construction
M01427263-I1-GC
07/16/2026
Filed — Alteration
Interior removals of finishes, fixtures and non-load bearing partitions at an existing religious building. No change in egress, zoning, use, or occupancy
M01427263-I1
07/01/2026
Objection raised — Admin
06/29/2026
Objection raised — Admin
06/29/2026
Objection raised — Admin
06/23/2026
Objection raised — Inspections
06/23/2026
Objection raised — Fire_Protection
06/23/2026
Objection raised — Other
06/23/2026
Objection raised — Energy
06/12/2026
Filed — Alteration
Structural work associated with Partial Renovation of religious building at 1st Floor. No change in egress, zoning, use or occupancy.
M01403922-S1
06/11/2026
Filed — Alteration
Structural work associated with Partial Renovation of religious building at 1st Floor. No change in egress, zoning, use or occupancy.
M01403922-S2
06/10/2026
Filed — Alteration
Structural work associated with Partial Renovation of religious building at 1st Floor. No change in egress, zoning, use or occupancy.
M01403922-I1
06/10/2026
Filed — Alteration
Structural work associated with Partial Renovation of religious building at 1st Floor. No change in egress, zoning, use or occupancy.
M01403922-S4
06/10/2026
Special inspection requirement — Maintenance information
06/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/09/2026
Special inspection requirement — Post-installed Anchors
06/09/2026
Special inspection requirement — Energy Code Compliance Inspections
06/09/2026
Special inspection requirement — Structural Cold-Formed Steel
06/09/2026
Special inspection requirement — Post-installed Anchors
06/09/2026
Special inspection requirement — Structural Steel - Details
06/09/2026
Special inspection requirement — Heating Systems
06/04/2026
Special inspection requirement — Fenestration areas
06/04/2026
Special inspection requirement — Sprayed fire-resistant materials
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/04/2026
Special inspection requirement — Energy Code Compliance Inspections
06/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/04/2026
Special inspection requirement — Air barrier continuity plan testing
06/04/2026
Special inspection requirement — Air barrier - visual inspection
06/04/2026
Special inspection requirement — Fenestration air leakage
06/04/2026
Special inspection requirement — Air barrier — testing
06/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/03/2026
Special inspection requirement — Final
06/02/2026
Special inspection requirement — Final
06/02/2026
Special inspection requirement — Mechanical Systems
05/18/2026
Special inspection requirement — Final
01/14/2026
Signed off — Alteration
Replacement of (4) existing split air conditioning units. No change in use egress and occupancy.
M01275357-I1
09/22/2025
Filed — Alteration
Replacement of (4) existing split air conditioning units. No change in use egress and occupancy.
M01275357-I1
09/22/2025
Permit issued — Mechanical Systems
M01275357-I1-MS
08/21/2025
Special inspection requirement — Mechanical Systems
Obaid Mian
08/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Obaid Mian
08/21/2025
Special inspection requirement — Maintenance information
Obaid Mian
08/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Obaid Mian
08/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Obaid Mian
06/04/2024
Filed — Alteration
M01050448-I1
08/17/2022
Cycle 9 facade report submitted
08/14/2022
Cycle 9 facade report signed — SAFE
07/25/2022
Cycle 9 facade inspection completed
02/17/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00519543-I1
05/13/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00519543-I1
05/13/2021
Permit issued — Sidewalk Shed
M00519543-I1-SH
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/14/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Cycle 8 facade report signed — SAFE
08/27/2019
Cycle 8 facade inspection completed
06/20/2019
Cycle 8 facade report submitted
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJRM Construction Management08/10/2026
DOB NOWMechanical SystemsSigned-offArista Air Conditioning09/22/2025
DOB NOWSidewalk ShedSigned-offGE 2A Construction05/13/2021
BISOTISSUEDSummit Development04/05/2019
BISOTISSUEDSummit Development04/05/2019
BISEQISSUEDEverest Scaffolding10/11/2018
BISOTISSUEDSummit Development04/09/2018
BISOTISSUEDSummit Development10/11/2017
BISEQISSUEDEverest Scaffolding10/06/2017
BIS—ISSUEDSpring Roc04/13/2016
BISMHISSUEDArista Air Conditioning04/17/2014
BISOTISSUEDArista Air Conditioning03/26/2014
BISOTISSUEDSNS Orgnization11/27/2012
BISEQISSUEDRock Scaffolding08/07/2012
BISEQISSUEDExterior Wall Stucco Systems07/05/2011
BISPLISSUEDReliable Plumbing & Heating09/12/2008
BISOTISSUEDSpring Roc08/24/2008
BISOTISSUEDSpring Roc08/24/2008
BISMHISSUEDSpring Roc06/20/2008
BISOTISSUEDSpring Roc06/20/2008
BISOTISSUEDSpring Roc11/09/2006
BISOTISSUEDSpring Roc11/09/2006
BISOTISSUEDSuburban Contracting08/25/2005
BISPLISSUEDNew York City Water Works09/22/2004
BISSPISSUEDKapnag Heating & Plumbing07/20/2004
BISPLISSUEDFlytiger P & H06/01/2004
BIS—ISSUEDKenseng05/26/2004
BISOTISSUEDPlaza Build. Service04/29/2004
BISEQISSUEDRockledge Scaffold04/22/2004
BISOTISSUEDPlaza Build. Service12/11/2003
BISEQISSUEDRockledge Scaffold11/21/2003
BISPLISSUEDAljer Plumbing & Heating08/28/2003
BISMHISSUEDLGB Development04/29/2003
BISOTISSUEDLGB Development04/29/2003
BISEQISSUEDRockledge Scaffold03/28/2003
BISPLISSUEDExcellence in Plumbing01/13/2003
BISEQISSUEDRockledge Scaffold11/25/2002
BISOTISSUEDLGB Development10/02/2002
BISOTISSUEDLGB Development10/02/2002
BISPLISSUEDHaron P.umb Heat05/21/2001
+ 7 more permits on file
1 project · most recent 06/12/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/12/2026——Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Trane PUY-AH24NL 2 tons · Condensing Unit ×2
PUY-AH30NL 3 tons · Condensing Unit ×1
TTA240K3DAA 20 tons · Condensing Unit ×1
Heat / Cool
Mitsubishi Electric PEAD-AA24NL 2 tons · Vrf Indoor ×2
PEAD-AA30NL 3 tons · Vrf Indoor ×1
1 project · most recent 06/12/2026
Water/Sanitary
FiledStatusContractorScope
06/12/2026——Water/Sanitary
2 projects · most recent 08/18/2026
General Wiring
FiledStatusContractorScope
08/18/2026Permit IssuedMer ElectricGeneral Wiring
05/20/2021CompleteBorowide Elect'l Contractors—
1 project · most recent 06/12/2026
Steel
FiledStatusContractorScope
06/12/2026——Steel
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
06/10/2026Maintenance information—energy_progress
06/10/2026HVAC-R and service water heating system controls—energy_progress
06/10/2026HVAC-R and service water heating equipment—energy_progress
06/10/2026HVAC-R and service water piping design and insulation—energy_progress
06/09/2026Post-installed Anchors—special
06/09/2026Energy Code Compliance Inspections—progress
06/09/2026Structural Cold-Formed Steel—special
06/09/2026Post-installed Anchors—special
06/09/2026Structural Steel - Details—special
06/09/2026Heating Systems—special
06/04/2026Fenestration areas—energy_progress
06/04/2026Sprayed fire-resistant materials—special
06/04/2026Fire-Resistant Penetrations and Joints—special
06/04/2026Energy Code Compliance Inspections—progress
06/04/2026Fire-Resistance Rated Construction—progress
06/04/2026Structural Stability – Alterations of existing buildings—special
06/04/2026Air barrier continuity plan testing—energy_progress
06/04/2026Air barrier - visual inspection—energy_progress
06/04/2026Fenestration air leakage—energy_progress
06/04/2026Air barrier — testing —energy_progress
06/04/2026Fenestration and door U-factor and product ratings—energy_progress
06/03/2026Final—progress
06/02/2026Final—progress
06/02/2026Mechanical Systems—special
05/18/2026Final—progress
Latest 25 of 31.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Jewish CenterReligiousCellar, Floors 1, 2
Project M01427263 Alteration · Permit Entire · 07/16/2026
Project M01403922 Alteration · Plan Examiner Review · 06/10/2026
Smith SchoolEducationCellar, Floors 1, 2, Roof
Project M01275357 Alteration · LOC Issued · 09/22/2025
Project M01050448 Alteration · Objections · 06/04/2024
Project M00519543 Alteration · LOC Issued · 05/13/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 162 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/03/2026M00519543-I1Request digital key ↗
08/27/2026M01050448-I1Request digital key ↗
08/21/2026M01275357-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION14
12/03/2020104837526Open ↗
12/03/2020121659375Open ↗
11/26/2018102793149Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION10
04/08/2019123187764Open ↗
10/11/2018140703040Open ↗
04/13/2018123187764Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWLPC Approval/Permit3
08/16/2026M01427263-I1Open ↗
08/13/2026M01050448-I1Open ↗
08/13/2026M01275357-I1Open ↗
▸BISPLACE OF ASSEMBLY2
11/10/2014121659375Open ↗
01/02/2014121659375Open ↗
▸Seals & Professional Certifications35
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
09/13/2019123187764Open ↗
09/13/2019123187764Open ↗
10/05/2017123187764Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026M01050448-I1Open ↗
08/16/2026M01403922-S1Open ↗
08/16/2026M01403922-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/19/2026M01275357-I1Open ↗
09/19/2026M01275357-I1Open ↗
09/19/2026M01275357-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/05/2017123187764Open ↗
10/05/2017140703040Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/05/2017123187764Open ↗
08/13/2012121180239Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/05/2017140703040Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/13/2012121180239Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/05/2017140703040Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/19/2026M01275357-I1Open ↗
▸Trade Schedules & Equipment7
▸BISEQUIPMENT USE PERMITS4
08/20/2014121335073Open ↗
08/20/2014121335073Open ↗
08/20/2014121335073Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT2
10/10/2014121335073Open ↗
08/20/2014121335073Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
05/03/2012121050263Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026M01050448-I1Open ↗
08/16/2026M01427263-I1Open ↗
08/14/2026M01403922-S4Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
10/05/2017123187764Open ↗
08/14/2012121335073Open ↗
10/23/2012121418965Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
05/03/2012121050263Open ↗
07/11/2011120737220Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
09/13/2019123187764Open ↗
09/13/2019123187764Open ↗
10/10/2014121335073Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
09/13/2019123187764Open ↗
10/10/2014121335073Open ↗
08/15/2013121418965Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/05/2017140703040Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
11/12/2020140703040Open ↗
11/12/2020140703040Open ↗
11/10/2020101153920Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs32
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
11/12/2020140703040Open ↗
11/12/2020102793149Open ↗
11/10/2020101153920Open ↗
Showing 3 of 13 on file for this type
▸BISLANDMARKS APPROVAL5
10/05/2017123187764Open ↗
10/05/2017140703040Open ↗
10/10/2014121335073Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/16/2026M01427263-I1Open ↗
08/15/2026M01403922-S2Open ↗
08/14/2026M01403922-S4Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
10/23/2012121418965Open ↗
08/14/2012121335073Open ↗
08/13/2012121180239Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS SIGNOFF2
11/12/2020102793149Open ↗
11/10/2020140703040Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
11/25/2014121659375Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/10/2014121335073Open ↗
▸BISSHED LETTER1
10/11/2018140703040Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
09/13/2019123187764Open ↗
10/05/2017123187764Open ↗
10/10/2014121335073Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms14
▸BISBOROUGH INTAKE FORM7
09/13/2019123187764Open ↗
11/20/2018121180239Open ↗
11/20/2018120737220Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET5
10/05/2017123187764Open ↗
10/23/2012121418965Open ↗
08/13/2012121180239Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/05/2017140703040Open ↗
08/14/2012121335073Open ↗
▸Other Documents1
▸BISFEE EXEMPTION DOCUMENTATION1
10/05/2017140703040Open ↗