← Back
BuildNYC
Parochial school, yeshiva
1311 ST LAWRENCE AVENUE
BRONX · BIN 2027860
💬 Discuss this project
1930Year Built
1Stories
W2Building Class
R5Zoning
14,300 sfGross Floor Area
4Units
69 Active Violations 67 unresolved · 2 paperwork only ▸
Parochial school, yeshiva · Owner of record: EL Amanecer de la Esperanza Ministry · 23,000 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
StructuralEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1El Amanecer De LA Esperanza MinistryUnder Construction4p · 3 filings · 9 docs
Cellar1311 Saint Lawrence Avenue1 filing · 5 docs
Site & exteriorInstallation of sidewalk shed, pipe scaffolding8p · 1 filing · 1 doc
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EL Amanecer de la Esperanza Ministr910/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kce Consulting Engineering310/23/2025
Volume Space Consulting107/03/2025
Sullivan Group Design109/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Studio203/21/2026
American Gotham Consultants803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & D General ContractingScaffold404/09/2026
John Evan ContractingGeneral Contractor104/09/2026
Paul Toth Excavationspecialty_contractor107/08/2026
John Evan ContractingScaffold110/04/2026
Paul Toth ExcavationScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616110/23/2025
Kce Consulting Engineering3712111/13/2024
Building Lifecycle
All (87)Filed (5)Permit Issued (6)Signed Off (1)Violation (60)Objection (8)Special Inspection (7)
07/23/2026
Permit issued — Construction Fence
X01145112-I1-FN
03/03/2026
Objection resolved — Addressed
03/01/2026
Objection raised — Admin
02/25/2026
Objection resolved — Addressed
02/16/2026
Objection raised — Admin
02/12/2026
Objection resolved — Addressed
02/12/2026
Objection resolved — Addressed
11/07/2025
Objection raised — Admin
11/07/2025
Objection raised — Admin
10/23/2025
Filed — Alteration
shoring installation to support excavation
X01109728-I1
10/20/2025
Permit issued — Curb Cut
X01110500-I1-CC
10/16/2025
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
10/16/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SHAHRIAR QUAYYUM
10/16/2025
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
10/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHRIAR QUAYYUM
10/16/2025
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
09/12/2025
Signed off — Full Demolition
application filed for full demolition of existing 2 story & cellar building with on site fill
X01098522-I1
07/11/2025
Permit issued — Sidewalk Shed
X01250530-I1-SH
07/11/2025
Permit issued — Supported Scaffold
X01250530-I1-SF
07/03/2025
Filed — Alteration
X01250530-I1
07/01/2025
Permit issued — Full Demolition
X01098522-I1-FD
06/17/2025
Permit issued — Construction Fence
X01145112-I1-FN
01/16/2025
Filed — Alteration
application and plans filed for temporary construction fence 3'-0" from property line during construction.
X01145112-I1
11/13/2024
Filed — Full Demolition
application filed for full demolition of existing 2 story & cellar building with on site fill
X01098522-I1
09/13/2024
Filed — Alteration
X01110500-I1
09/11/2024
Special inspection requirement — Demolition
Kemba Walcott
09/11/2024
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Kemba Walcott
05/31/2012
Violation issued (HPD, open)
I
06/19/2006
Violation issued (DOB, closed)
V%*-DOB VIOLATION - DISMISSED
02/17/2006
Violation issued (ECB, closed)
Construction
01/19/2006
Violation issued (ECB, closed)
Construction
12/07/2005
Violation issued (HPD, open)
I
12/01/2005
Violation issued (HPD, open)
C
11/13/2005
Violation issued (HPD, open)
C
11/13/2005
Violation issued (HPD, open)
B
11/13/2005
Violation issued (HPD, open)
B
11/13/2005
Violation issued (HPD, open)
C
11/13/2005
Violation issued (HPD, open)
B
11/13/2005
Violation issued (HPD, open)
B
11/13/2005
Violation issued (HPD, open)
B
11/13/2005
Violation issued (HPD, open)
C
11/02/2005
Violation issued (HPD, open)
B
11/02/2005
Violation issued (HPD, open)
B
11/02/2005
Violation issued (HPD, open)
B
11/02/2005
Violation issued (HPD, open)
B
11/02/2005
Violation issued (HPD, open)
B
11/02/2005
Violation issued (HPD, open)
B
11/02/2005
Violation issued (HPD, open)
B
11/02/2005
Violation issued (HPD, open)
C
11/02/2005
Violation issued (HPD, open)
B
11/02/2005
Violation issued (HPD, open)
A
11/02/2005
Violation issued (HPD, open)
B
11/02/2005
Violation issued (HPD, open)
C
11/02/2005
Violation issued (HPD, open)
B
11/02/2005
Violation issued (HPD, open)
B
11/02/2005
Violation issued (HPD, open)
C
07/27/2005
Violation issued (HPD, open)
B
07/27/2005
Violation issued (HPD, open)
B
07/27/2005
Violation issued (HPD, open)
B
07/27/2005
Violation issued (HPD, open)
B
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedJohn Evan Contracting07/23/2026
DOB NOWCurb CutPermit IssuedJohn Evan Contracting10/20/2025
DOB NOWSidewalk ShedPermit IssuedA & D General Contracting07/11/2025
DOB NOWSupported ScaffoldPermit IssuedA & D General Contracting07/11/2025
DOB NOWFull DemolitionSigned-offPaul Toth Excavation07/01/2025
DOB NOWConstruction FencePermit IssuedPaul Toth Excavation06/17/2025
1 project · most recent 07/25/2025
FiledStatusContractorScope
07/25/2025CompleteRichard Neu—
1 project · most recent 10/23/2025
FiledStatusContractorScope
10/23/2025——2 scope_items
1 project · most recent 01/16/2025
Fence
FiledStatusContractorScope
01/16/2025Permit IssuedJohn Evan ContractingFence
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/16/2025Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
10/16/2025Excavations - Sheeting, Shoring, and BracingSHAHRIAR QUAYYUMspecial
10/16/2025Post-installed AnchorsSHAHRIAR QUAYYUMspecial
10/16/2025Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
10/16/2025Subgrade InspectionsSHAHRIAR QUAYYUMspecial
09/11/2024DemolitionKemba Walcottspecial
09/11/2024Structural Stability – Alterations of existing BuildingsKemba Walcottspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
El Amanecer De LA Esperanza MinistryReligiousFloor 1
Project X01110500 Alteration · Permit Entire · 09/13/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026X01110500-I1Request digital key ↗
08/20/2026X01098522-I1Request digital key ↗
08/20/2026X01145112-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026X01110500-I1Open ↗
08/20/2026X01145112-I1Open ↗
08/19/2026X01250530-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026X01098522-I1Open ↗
08/26/2026X01098522-I1Open ↗
08/25/2026X01109728-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026X01098522-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01098522-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01098522-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X01098522-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01098522-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026X01098522-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026X01109728-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026X01145112-I1Open ↗
08/13/2026X01110500-I1Open ↗
08/13/2026X01109728-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents5
▸DOB NOWCommunity Board Notification1
08/13/2026X01098522-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026X01098522-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01098522-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01098522-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X01109728-I1Open ↗