Professional building / stand-alone funeral home
1313 CLOVE ROAD
STATEN ISLAND · BIN 5015446
💬 Discuss this project
1959Year Built
2Stories
O7Building Class
R2Zoning
4,140 sfGross Floor Area
2Units
Professional building / stand-alone funeral home · Owner of record: CRIMSONRISE, INC. · 6,135 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
StructuralPlumbingFire ProtectionGeneral
Floor 16p · 2 filings · 20 docs
Cellar7p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
Sub-Basement4p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES V MORRI405/29/2026
A TECH ENGINEERING NYC, PLLC.106/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAMES V MORRI, RA303/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JACOBSON CONTRACTING,INCGeneral Contractor204/09/2026
FIVE BOROUGH NYC LLCFire Protection106/28/2026
ALISON PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES V MORRI, RA1042205/29/2026
A TECH ENGINEERING NYC, P6738106/24/2025
Building Lifecycle
All (50)Filed (5)Permit Issued (4)Signed Off (1)Inspection (9)Objection (1)Special Inspection (30)
06/08/2026
Objection raised — Scope
05/29/2026
Filed — Alteration CO
INSTALLATION OF NEW AND ALTERED WATER/SANITARY WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01130301-P1
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Morri
05/22/2026
Special inspection requirement — Insulation placement and R values
James Morri
05/22/2026
Special inspection requirement — Lighting controls
James Morri
05/22/2026
Special inspection requirement — Fenestration areas
James Morri
05/22/2026
Special inspection requirement — Fenestration air leakage
James Morri
05/22/2026
Special inspection requirement — Air barrier - visual inspection
James Morri
05/22/2026
Special inspection requirement — Air barrier — testing
James Morri
05/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
James Morri
05/22/2026
Special inspection requirement — Structural Wood Frame
James Morri
05/22/2026
Special inspection requirement — Preliminary
James Morri
05/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
James Morri
05/22/2026
Special inspection requirement — Final
James Morri
05/22/2026
Special inspection requirement — Energy Code Compliance Inspections
James Morri
05/22/2026
Special inspection requirement — Subgrade Inspections
James Morri
05/22/2026
Special inspection requirement — Masonry
James Morri
02/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/08/2026
Signed off — Alteration
8' HIGH CONSTRUCTION FENCE
S01288405-I1
12/31/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/18/2025
Permit issued — Construction Fence
S01288405-I1-FN
09/17/2025
Filed — Alteration
8' HIGH CONSTRUCTION FENCE
S01288405-I1
08/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/03/2025
Permit issued — Sprinklers
S01233097-I1-EW-SP
06/24/2025
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME.
S01233097-I1
06/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2025
Permit issued — Plumbing
S01130301-S1-PL
06/11/2025
Filed — Alteration CO
INSTALLATION OF NEW AND ALTERED WATER/SANITARY WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01130301-S1
05/29/2025
Special inspection requirement — Sprinkler Systems
anthony santoro
04/15/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/10/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
03/17/2025
Permit issued — Structural
S01130301-I1-GC-CX
03/03/2025
Special inspection requirement — Masonry
James Morri
03/03/2025
Special inspection requirement — Subgrade Inspections
James Morri
12/04/2024
Filed — Alteration CO
INSTALLATION OF NEW AND ALTERED WATER/SANITARY WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01130301-I1
10/21/2024
Special inspection requirement — Fenestration air leakage
James Morri
10/21/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
James Morri
10/21/2024
Special inspection requirement — Air barrier - visual inspection
James Morri
10/21/2024
Special inspection requirement — Fenestration areas
James Morri
10/21/2024
Special inspection requirement — Air barrier — testing
James Morri
10/21/2024
Special inspection requirement — Structural Wood Frame
James Morri
10/21/2024
Special inspection requirement — Preliminary
James Morri
10/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
James Morri
10/21/2024
Special inspection requirement — Energy Code Compliance Inspections
James Morri
10/21/2024
Special inspection requirement — Final
James Morri
10/21/2024
Special inspection requirement — Lighting controls
James Morri
10/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Morri
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offJACOBSON CONTRACTING,INC09/18/2025
DOB NOWSprinklersPermit IssuedFIVE BOROUGH NYC LLC07/03/2025
DOB NOWPlumbingPermit IssuedALISON PLBG & HTG INC06/12/2025
DOB NOWStructuralPermit IssuedJACOBSON CONTRACTING,INC03/17/2025
1 project · most recent 06/24/2025
FiledStatusContractorScope
06/24/2025Permit IssuedFIVE BOROUGH NYC LLC58 heads
2 projects · most recent 05/29/2026
Water/Sanitary
FiledStatusContractorScope
05/29/2026Permit IssuedALISON PLBG & HTG INCWater/Sanitary
06/24/2025——Water/Sanitary
1 project · most recent 06/20/2025
General Wiring
FiledStatusContractorScope
06/20/2025CompleteLMS ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/31/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/10/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/22/2026Fire-Resistant Penetrations and JointsJames Morrispecial
05/22/2026Insulation placement and R valuesJames Morrienergy_progress
05/22/2026Lighting controlsJames Morrienergy_progress
05/22/2026Fenestration areasJames Morrienergy_progress
05/22/2026Fenestration air leakageJames Morrienergy_progress
05/22/2026Air barrier - visual inspectionJames Morrienergy_progress
05/22/2026Air barrier — testing James Morrienergy_progress
05/22/2026Fenestration and door U-factor and product ratingsJames Morrienergy_progress
05/22/2026Structural Wood FrameJames Morriprogress
05/22/2026PreliminaryJames Morriprogress
05/22/2026Fire-Resistance Rated ConstructionJames Morriprogress
05/22/2026FinalJames Morriprogress
05/22/2026Energy Code Compliance InspectionsJames Morriprogress
05/22/2026Subgrade InspectionsJames Morrispecial
05/22/2026MasonryJames Morrispecial
05/29/2025Sprinkler Systemsanthony santorospecial
03/03/2025MasonryJames Morrispecial
03/03/2025Subgrade InspectionsJames Morrispecial
10/21/2024Fenestration air leakageJames Morrienergy_progress
10/21/2024Fenestration and door U-factor and product ratingsJames Morrienergy_progress
10/21/2024Air barrier - visual inspectionJames Morrienergy_progress
10/21/2024Fenestration areasJames Morrienergy_progress
10/21/2024Air barrier — testing James Morrienergy_progress
10/21/2024Structural Wood FrameJames Morriprogress
10/21/2024PreliminaryJames Morriprogress
Latest 25 of 31.
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026S01288405-I1Request digital key ↗
08/16/2026S01130301-I1Request digital key ↗
08/16/2026S01130301-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026S01130301-P1Open ↗
08/13/2026S01130301-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01130301-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/16/2026S01130301-P1Open ↗
08/13/2026S01130301-S1Open ↗
08/13/2026S01233097-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026S01130301-P1Open ↗
09/01/2026S01130301-P1Open ↗
09/01/2026S01130301-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026S01233097-I1Open ↗
09/01/2026S01130301-P1Open ↗
08/31/2026S01130301-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/15/2026S01130301-P1Open ↗
08/13/2026S01130301-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/15/2026S01130301-P1Open ↗
08/13/2026S01130301-I1Open ↗
08/13/2026S01130301-S1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/15/2026S01130301-P1Open ↗
08/13/2026S01130301-I1Open ↗