← Back
Two family brick
1314 40 STREET
BROOKLYN · BIN 3123232
💬 Discuss this project
1899Year Built
3Stories
B1Building Class
R6Zoning
3,072 sfGross Floor Area
2Units
Rent Stabilized22 Open Violations ▸FDNY Report ↗
Two family brick · Owner of record: BP TOV REALTY INC · 2,003 sf lot · 1.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof11p · 2 filings · 20 docs
Floor 4Under Construction21p · 3 filings · 20 docs
Floor 3Under Construction20p · 3 filings · 20 docs
Floor 2Under Construction20p · 3 filings · 20 docs
Floor 1Under Construction20p · 3 filings · 20 docs
CellarUnder Construction23p · 3 filings · 20 docs
1 job · most recent 09/21/2023
FiledStatusContractorScope
09/21/2023Permit IssuedPIPING & PLUMBING SOLUTIO71 heads
2 jobs · most recent 02/26/2026
Water/Sanitary
FiledStatusContractorScope
02/26/2026Permit IssuedPIPING & PLUMBING SOLUTIOWater/Sanitary
01/15/2024——Water/Sanitary
2 jobs · most recent 11/27/2025
General Wiring
FiledStatusContractorScope
11/27/2025Permit IssuedSHTRAL ELECT'L CONT'G CORGeneral Wiring
08/14/2025Permit IssuedFRIED ELECTRIC CO.General Wiring
1 job · most recent 01/12/2026
Steel Wood
FiledStatusContractorScope
01/12/2026Signed-offJOHN EVAN CONTRACTING CORSteel, Wood
1 job · most recent 01/12/2026
Fence
FiledStatusContractorScope
01/12/2026Signed-offJOHN EVAN CONTRACTING CORFence
1 job · most recent 01/12/2026
Support of Excavation
FiledStatusContractorScope
01/12/2026Signed-offJOHN EVAN CONTRACTING CORSupport of Excavation
Building Lifecycle
All (108)Filed (9)Permit Issued (7)Signed Off (3)Violation (36)Inspection (7)Objection (16)Special Inspection (30)
08/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/11/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/01/2026
Violation issued (HPD, open)
A
04/23/2026
Permit issued — Sprinklers
B00936129-I1-EW-SP
04/01/2026
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO PROPOSE VERTICAL EXTENSION TO EXISTING THREE (3) FAMILYBUILDING, CONVERTING TO EIGHT (8) FAMILY.
B00920155-S2
03/31/2026
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO PROPOSE VERTICAL EXTENSION TO EXISTING THREE (3) FAMILYBUILDING, CONVERTING TO EIGHT (8) FAMILY.
B00920155-S5
03/31/2026
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO PROPOSE VERTICAL EXTENSION TO EXISTING THREE (3) FAMILYBUILDING, CONVERTING TO EIGHT (8) FAMILY.
B00920155-S1
03/24/2026
Permit issued — Support of Excavation
B00920155-S5-SE
03/04/2026
Objection resolved — Addressed
02/26/2026
Filed — Alteration
SUBSEQUENT APPLICATION FILLED HEREWITH FOR PLUMBING WORK TYPE OF NEW PLUMBING FIXTURES ,COLD AND HOT WATER PIPES, NO GAS JOB IS BEING DONE IN THIS PROPERTY, IN CONJUNCTION TO ALT JOB B00920155-I1
B01239067-P1
02/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
02/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
02/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
02/26/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
02/26/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
02/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
02/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
02/18/2026
Permit issued — Foundation
B00920155-S2-FO
02/13/2026
Permit issued — Structural
B00920155-S1-ST
02/09/2026
Objection resolved — Addressed
01/26/2026
Objection raised — Admin
01/26/2026
Objection raised — Admin
01/23/2026
Objection resolved — Addressed
01/23/2026
Objection resolved — Addressed
01/20/2026
Objection raised — Admin
01/20/2026
Objection raised — Admin
01/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/16/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
01/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
01/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
01/16/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
01/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
01/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/15/2026
Objection resolved — Addressed
01/14/2026
Objection raised — Admin
01/14/2026
Objection resolved — Addressed
01/14/2026
Objection raised — Other
01/12/2026
Filed — Alteration CO
APPLICATION FILED HEREWITH TO PROPOSE VERTICAL EXTENSION TO EXISTING THREE (3) FAMILYBUILDING, CONVERTING TO EIGHT (8) FAMILY.
B00920155-S2
01/12/2026
Filed — Alteration CO
APPLICATION FILED HEREWITH TO PROPOSE VERTICAL EXTENSION TO EXISTING THREE (3) FAMILYBUILDING, CONVERTING TO EIGHT (8) FAMILY.
B00920155-S5
01/12/2026
Filed — Alteration CO
APPLICATION FILED HEREWITH TO PROPOSE VERTICAL EXTENSION TO EXISTING THREE (3) FAMILYBUILDING, CONVERTING TO EIGHT (8) FAMILY.
B00920155-S1
01/08/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
01/08/2026
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
01/08/2026
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
01/08/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
01/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/08/2026
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
01/08/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
01/08/2026
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
01/08/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
01/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/18/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/15/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/15/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/30/2025
Permit issued — Plumbing
B01239067-I1-PL
06/23/2025
Permit issued — General Construction
B00920155-I1-GC
06/19/2025
Filed — Alteration
SUBSEQUENT APPLICATION FILLED HEREWITH FOR PLUMBING WORK TYPE OF NEW PLUMBING FIXTURES ,COLD AND HOT WATER PIPES, NO GAS JOB IS BEING DONE IN THIS PROPERTY, IN CONJUNCTION TO ALT JOB B00920155-I1
B01239067-I1
06/06/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, closed)
I
Latest 60 of 108 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BP TOV REALTY2907/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/23/2022$1.2M—— → —$391/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHN EVAN CONTRACTING CORGeneral Contractor507/08/2026
FRIED ELECTRIC CO.Electrical103/22/2026
PIPING & PLUMBING SOLUTIOFire Protection107/08/2026
EMPIRE PLUMBING INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519602/26/2026
MSM ENGINEERING SERVICES,8449104/08/2024
M. INT'L ENGINEERING PLLC3129111/13/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedPIPING & PLUMBING SOLUTIO04/23/2026
DOB NOWSupport of ExcavationSigned-offJOHN EVAN CONTRACTING COR03/24/2026
DOB NOWFoundationSigned-offJOHN EVAN CONTRACTING COR02/18/2026
DOB NOWStructuralSigned-offJOHN EVAN CONTRACTING COR02/13/2026
DOB NOWPlumbingPermit IssuedEMPIRE PLUMBING INC06/30/2025
DOB NOWGeneral ConstructionPermit IssuedJOHN EVAN CONTRACTING COR06/23/2025
DOB NOWGeneral ConstructionSigned-offJOHN EVAN CONTRACTING COR11/21/2023
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/11/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
02/26/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/26/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
02/26/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
02/26/2026Maintenance informationYounes Abouyaalaenergy_progress
02/26/2026Permanent certificateYounes Abouyaalaenergy_progress
02/26/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
02/26/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/16/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/16/2026Permanent certificateYounes Abouyaalaenergy_progress
01/16/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
01/16/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
01/16/2026Maintenance informationYounes Abouyaalaenergy_progress
01/16/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
01/16/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/08/2026Subgrade InspectionsYounes Abouyaalaspecial
01/08/2026Structural Cold-Formed SteelYounes Abouyaalaspecial
01/08/2026Structural Steel - DetailsYounes Abouyaalaspecial
01/08/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
01/08/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/08/2026Structural Steel - DetailsYounes Abouyaalaspecial
01/08/2026Structural Steel - High Strength BoltingYounes Abouyaalaspecial
01/08/2026Structural Steel - WeldingYounes Abouyaalaspecial
01/08/2026Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
01/08/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
11/19/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
Latest 25 of 54.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026B00936129-I1Request digital key ↗
08/26/2026B00920316-S1Request digital key ↗
08/26/2026B00920316-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00920155-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00920155-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026B00920316-I1Open ↗
09/02/2026B00920316-I1Open ↗
09/01/2026B01239067-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026B00920316-S1Open ↗
08/26/2026B00920316-I1Open ↗
08/21/2026B01239067-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026B00920316-I1Open ↗
09/01/2026B01239067-P1Open ↗
09/01/2026B00920155-S5Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/13/2026B00920155-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00920155-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/26/2026B00920316-S1Open ↗
08/26/2026B00920316-I1Open ↗
08/21/2026B01239067-I1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents8
▸DOB NOWPlot Diagram3
08/13/2026B00920155-S5Open ↗
08/13/2026B00920155-I1Open ↗
08/13/2026B00920155-S2Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00920155-S1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00920155-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00920155-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00920155-S5Open ↗
▸DOB NOWProperty Ownership Certification1
08/19/2026B00920155-I1Open ↗