BuildNYC
BROOKLYN
1314 53RD STREET
BROOKLYN · Borough Park · BIN 3430530
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
4 Active Violations 1 unresolved · 3 paperwork only 1 old, status unconfirmed ▸
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction17p · 1 filing · 20 docs
BulkheadUnder Construction3p · 1 filing · 20 docs
PenthouseUnder Construction3p · 1 filing · 20 docs
Floor 5Under Construction64p · 1 filing · 20 docs
Floor 4Under Construction66p · 1 filing · 20 docs
Floor 3Under Construction66p · 1 filing · 20 docs
Floor 2Under Construction65p · 1 filing · 20 docs
Floor 1Under Construction48p · 1 filing · 20 docs
CellarUnder Construction66p · 1 filing · 20 docs
Site & exterior1314 53 Management LLCUnder Construction51p · 6 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services307/15/2026
Structural Engineering Technologies603/23/2026
Lester Katz, Ncarb508/21/2025
Aryeh Siegel Architect112/09/2022
Adam Taddonio PE112/19/2017
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & G Construction ServicesScaffold309/02/2026
Prime Piping & HeatingFire Protection109/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161003/23/2026
Building Lifecycle
All (120)Filed (17)Permit Issued (16)Signed Off (1)Violation (10)Inspection (2)Objection (44)Special Inspection (30)
09/01/2026
Permit issued — Sprinklers
B01201735-S5-EW-SP
09/01/2026
Permit issued — Sidewalk Shed
B01411922-I1-SH
08/04/2026
Permit issued — Protection and Mechanical Methods
B01430422-I1-PMM
07/15/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01430414-I1
07/15/2026
Filed — Alteration
FILING TO PROTECT NEIGHBOR DURING MINOR FACADE REPAIR WORK. THIS SYSTEM IS A SITE SPECIFIC ENGINEERED ENCLOSURE SYSTEM SUBJECT TO THE REQUIREMENTS OF BC 3309.17. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
B01430422-I1
07/15/2026
Permit issued — Supported Scaffold
B01430414-I1-SF
06/17/2026
Permit issued — Sidewalk Shed
B01411922-I1-SH
06/12/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01411922-I1
06/11/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/05/2026
Permit issued — Mechanical Systems
B01201735-S1-MS
05/06/2026
Permit issued — Plumbing
B01201735-S4-PL
03/24/2026
Permit issued — Construction Fence
B08045139-I1-FN
03/23/2026
Filed — New Building
PROPOSED CURB CUT IN CONJUCTION WITH b01201735-I1
B01201735-P2
03/13/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SHAHRIAR QUAYYUM
03/13/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
03/13/2026
Special inspection requirement — Structural Steel - Welding
SHAHRIAR QUAYYUM
03/13/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SHAHRIAR QUAYYUM
03/13/2026
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
03/13/2026
Special inspection requirement — Structural Steel - Details
SHAHRIAR QUAYYUM
03/12/2026
Filed — New Building
PROPOSED CURB CUT IN CONJUCTION WITH b01201735-I1
B01201735-P1
03/12/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
03/12/2026
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
03/12/2026
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
SHAHRIAR QUAYYUM
03/12/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
03/12/2026
Special inspection requirement — Footing and Foundation
SHAHRIAR QUAYYUM
03/12/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SHAHRIAR QUAYYUM
02/23/2026
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
02/23/2026
Special inspection requirement — Structural Steel - Details
SHAHRIAR QUAYYUM
02/23/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
02/23/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SHAHRIAR QUAYYUM
02/23/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SHAHRIAR QUAYYUM
02/23/2026
Special inspection requirement — Structural Steel - Welding
SHAHRIAR QUAYYUM
01/25/2026
Permit issued — Support of Excavation
B01201735-S7-SE
01/24/2026
Permit issued — Foundation
B01201735-S9-FO
01/21/2026
Permit issued — Structural
B01201735-S2-ST
01/21/2026
Permit issued — Foundation
B01201735-S3-FO-EA
01/20/2026
Permit issued — General Construction
B01201735-I1-GC
11/24/2025
Objection resolved — Addressed
11/24/2025
Objection resolved — Addressed
11/24/2025
Objection resolved — Addressed
11/24/2025
Objection resolved — Addressed
11/24/2025
Objection resolved — Addressed
10/30/2025
Objection raised — Other
10/16/2025
Filed — New Building
PROPOSED CURB CUT IN CONJUCTION WITH b01201735-I1
B01201735-S9
10/09/2025
Objection raised — Other
10/09/2025
Objection raised — Other
10/09/2025
Objection raised — Other
10/09/2025
Objection raised — Other
09/30/2025
Filed — New Building
PROPOSED CURB CUT IN CONJUCTION WITH b01201735-I1
B01201735-S3
09/30/2025
Signed off — Full Demolition
Full demolition of Existing Building.
B01194644-I1
09/30/2025
Filed — New Building
PROPOSED CURB CUT IN CONJUCTION WITH b01201735-I1
B01201735-S7
09/30/2025
Filed — New Building
PROPOSED CURB CUT IN CONJUCTION WITH b01201735-I1
B01201735-S2
08/25/2025
Permit issued — Full Demolition
B01194644-I1-FD
08/25/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/22/2025
Violation issued (ECB, closed)
Construction
08/22/2025
Violation issued (ECB, closed)
Construction
08/22/2025
Violation issued (ECB, closed)
Construction
08/21/2025
Filed — New Building
PROPOSED CURB CUT IN CONJUCTION WITH b01201735-I1
B01201735-S5
08/18/2025
Objection raised — Other
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedPrime Piping & Heating09/01/2026
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services09/01/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedJ & G Construction Services08/04/2026
DOB NOWSupported ScaffoldPermit IssuedJ & G Construction Services07/15/2026
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services06/17/2026
DOB NOWMechanical SystemsPermit IssuedBlue Dream Builders06/05/2026
DOB NOWPlumbingPermit IssuedKishan Plumbing05/06/2026
DOB NOWConstruction FencePermit IssuedBlue Dream Builders03/24/2026
DOB NOWSupport of ExcavationPermit IssuedBlue Dream Builders01/25/2026
DOB NOWFoundationPermit IssuedBlue Dream Builders01/24/2026
DOB NOWStructuralPermit IssuedBlue Dream Builders01/21/2026
DOB NOWFoundationPermit IssuedBlue Dream Builders01/21/2026
DOB NOWGeneral ConstructionPermit IssuedBlue Dream Builders01/20/2026
DOB NOWFull DemolitionSigned-offHexagon Industries08/25/2025
DOB NOWConstruction FencePermit IssuedBlue Dream Builders04/02/2025
DOB NOWConstruction FencePermit IssuedPioneer General Construction12/20/2017
1 project · most recent 03/23/2026
Sprinkler System
FiledStatusContractorScope
03/23/2026Permit IssuedPrime Piping & HeatingSprinkler System
2 projects · most recent 08/13/2026
General Wiring
FiledStatusContractorScope
08/13/2026Permit IssuedB.P. ElectricGeneral Wiring
06/04/2026Permit IssuedRichard Neu—
2 projects · most recent 07/15/2026
Concrete
FiledStatusContractorScope
07/15/2026Permit IssuedJ & G Construction Services1 scope_items
03/23/2026Permit IssuedPrime Piping & HeatingConcrete
1 project · most recent 03/23/2026
Earthwork
FiledStatusContractorScope
03/23/2026Permit IssuedPrime Piping & HeatingEarthwork
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/11/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/11/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
03/13/2026Subsurface Conditions – Fill Placement & In-Place DensitySHAHRIAR QUAYYUMspecial
03/13/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
03/13/2026Structural Steel - WeldingSHAHRIAR QUAYYUMspecial
03/13/2026Excavations - Sheeting, Shoring, and BracingSHAHRIAR QUAYYUMspecial
03/13/2026Subgrade InspectionsSHAHRIAR QUAYYUMspecial
03/13/2026Structural Steel - DetailsSHAHRIAR QUAYYUMspecial
03/12/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
03/12/2026Subgrade InspectionsSHAHRIAR QUAYYUMspecial
03/12/2026Underpinning and alternate methods of support of buildings and adjacent propertySHAHRIAR QUAYYUMspecial
03/12/2026FinalSHAHRIAR QUAYYUMprogress
03/12/2026Footing and FoundationSHAHRIAR QUAYYUMprogress
03/12/2026Excavations - Sheeting, Shoring, and BracingSHAHRIAR QUAYYUMspecial
02/23/2026Subgrade InspectionsSHAHRIAR QUAYYUMspecial
02/23/2026Structural Steel - DetailsSHAHRIAR QUAYYUMspecial
02/23/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
02/23/2026Subsurface Conditions – Fill Placement & In-Place DensitySHAHRIAR QUAYYUMspecial
02/23/2026Excavations - Sheeting, Shoring, and BracingSHAHRIAR QUAYYUMspecial
02/23/2026Structural Steel - WeldingSHAHRIAR QUAYYUMspecial
08/12/2025Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
08/12/2025Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
07/30/2025Shutoff dampersSHAHRIAR QUAYYUMenergy_progress
07/30/2025Heating SystemsSHAHRIAR QUAYYUMspecial
07/30/2025Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
07/30/2025HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
07/30/2025Maintenance informationSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 43.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
09/03/2026B00006683-I1Request digital key ↗
08/28/2026B08045139-I1Request digital key ↗
08/22/2026B01194644-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/20/2026B01201735-P3Open ↗
08/13/2026B01201735-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/20/2026B01201735-P3Open ↗
08/13/2026B01201735-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01201735-I1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/03/2026B00006683-I1Open ↗
08/20/2026B01201735-P3Open ↗
08/16/2026B01411922-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/20/2026B01201735-S4Open ↗
09/01/2026B01201735-S5Open ↗
09/01/2026B01201735-S7Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/20/2026B01201735-S4Open ↗
09/20/2026B01201735-S4Open ↗
08/26/2026B01201735-S1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01201735-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/20/2026B01201735-P3Open ↗
08/13/2026B01201735-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01201735-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/22/2026B01194644-I1Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification3
08/22/2026B01194644-I1Open ↗
08/20/2026B01201735-P3Open ↗
08/13/2026B01201735-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/20/2026B01201735-P3Open ↗
08/13/2026B01201735-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B01201735-S3Open ↗
08/13/2026B01201735-S7Open ↗
▸DOB NOWSite Survey: Initial1
08/20/2026B01201735-P3Open ↗