← Back
Three families
1314 63 STREET
BROOKLYN · BIN 3141828
💬 Discuss this project
1970Year Built
3Stories
C0Building Class
R5BZoning
2,068 sfGross Floor Area
3Units
Three families · 2,040 sf lot · 1.01 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivil
Floor 24p · 2 filings · 14 docs
Floor 15p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TIMING CONSTRUCTION TEAM INC.707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/22/2025$1.7M—Private party → Private party$841/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI504/06/2026
WEI STUDIO204/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MHYDESIGN1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor104/09/2026
TIMING CONSTRUCTION TEAM*General Contractor107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394304/06/2026
WEI STUDIO7998204/22/2025
Building Lifecycle
All (37)Filed (7)Permit Issued (4)Signed Off (4)Inspection (8)Special Inspection (14)
04/27/2026
Signed off — Alteration
RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 3-PC BATHROOM, WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN 1ST FLOOR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01311424-I1
04/27/2026
Signed off — Alteration
RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01311417-I1
04/20/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/09/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/06/2026
Filed — Alteration
RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01311417-P2
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
04/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
12/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/15/2025
Filed — Alteration
RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01311417-P1
12/15/2025
Filed — Alteration
RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 3-PC BATHROOM, WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN 1ST FLOOR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01311424-P1
12/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
12/15/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
11/14/2025
Permit issued — General Construction
B01311417-I1-GC
11/14/2025
Permit issued — Plumbing
B01311424-I1-PL
11/10/2025
Filed — Alteration
RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 3-PC BATHROOM, WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN 1ST FLOOR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01311424-I1
11/10/2025
Filed — Alteration
RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01311417-I1
06/17/2025
Signed off — Alteration
GENERAL RENOVATION OF 2-FAMILY HOUSE WITH REPAIR/REMOVE PARTITION, DOOR, CEILING, FLOOR, PAINTING WORK AS PER PLAN. REMOVE RCA(COMPLAIN # 3983108) NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01213565-S1
06/17/2025
Signed off — Alteration
GENERAL RENOVATION OF 2-FAMILY HOUSE WITH REPAIR/REMOVE PARTITION, DOOR, CEILING, FLOOR, PAINTING WORK AS PER PLAN. REMOVE RCA(COMPLAIN # 3983108) NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01213565-I1
06/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/29/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/07/2025
Permit issued — General Construction
B01213565-I1-GC
04/30/2025
Permit issued — Plumbing
B01213565-S1-PL
04/22/2025
Filed — Alteration
GENERAL RENOVATION OF 2-FAMILY HOUSE WITH REPAIR/REMOVE PARTITION, DOOR, CEILING, FLOOR, PAINTING WORK AS PER PLAN. REMOVE RCA(COMPLAIN # 3983108) NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01213565-S1
04/22/2025
Filed — Alteration
GENERAL RENOVATION OF 2-FAMILY HOUSE WITH REPAIR/REMOVE PARTITION, DOOR, CEILING, FLOOR, PAINTING WORK AS PER PLAN. REMOVE RCA(COMPLAIN # 3983108) NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01213565-I1
04/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Ruoyu Wei
04/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
Ruoyu Wei
04/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ruoyu Wei
04/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ruoyu Wei
04/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Ruoyu Wei
04/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ruoyu Wei
04/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ruoyu Wei
04/21/2025
Special inspection requirement — Final
Ruoyu Wei
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC11/14/2025
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC11/14/2025
DOB NOWGeneral ConstructionSigned-offTIMING CONSTRUCTION TEAM*05/07/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.04/30/2025
1 project · most recent 11/24/2025
General Wiring
FiledStatusContractorScope
11/24/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/20/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/09/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
04/06/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
04/06/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
04/06/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
12/15/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
12/15/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
12/15/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
04/21/2025Energy Code Compliance InspectionsRuoyu Weiprogress
04/21/2025Fire-Resistance Rated ConstructionRuoyu Weiprogress
04/21/2025Tenant Protection Plan ComplianceRuoyu Weispecial
04/21/2025Tenant Protection Plan ComplianceRuoyu Weispecial
04/21/2025Energy Code Compliance InspectionsRuoyu Weiprogress
04/21/2025Fire-Resistant Penetrations and JointsRuoyu Weispecial
04/21/2025Fire-Resistant Penetrations and JointsRuoyu Weispecial
04/21/2025FinalRuoyu Weiprogress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026B01213565-S1Request digital key ↗
08/21/2026B01213565-I1Request digital key ↗
08/19/2026B01311424-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/19/2026B01311424-P1Open ↗
08/19/2026B01311424-I1Open ↗
08/17/2026B01311417-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B01311417-P1Open ↗
08/31/2026B01213565-I1Open ↗
08/31/2026B01213565-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B01311417-P1Open ↗
08/31/2026B01213565-I1Open ↗
08/31/2026B01213565-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B01213565-S1Open ↗
08/13/2026B01213565-I1Open ↗