← Back
Two family brick
1315 76 STREET
BROOKLYN · BIN 3160043
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R4-1Zoning
3,220 sfGross Floor Area
2Units
Rent StabilizedFDNY Report ↗
Two family brick · Owner of record: AZ PALACE LLC · 2,900 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Floor 22p · 1 filing · 16 docs
Floor 13p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AZ PALACE LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/12/2024$1.7M—Private party → AZ PALACE LLC$522/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI601/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor303/21/2026
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394401/06/2025
Building Lifecycle
All (27)Filed (6)Permit Issued (3)Signed Off (2)Inspection (4)Special Inspection (12)
02/13/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NEW YARD DRAIN IN FRONT AND REAR. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01069603-I1
01/17/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01069599-I1
01/16/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
01/10/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
01/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
01/06/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01069599-P3
01/06/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NEW YARD DRAIN IN FRONT AND REAR. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01069603-P1
01/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
01/06/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
01/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
11/26/2024
Permit issued — General Construction
B01069599-I1-GC
08/22/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/22/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/20/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/05/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01069599-P2
07/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
07/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
07/05/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/27/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01069599-P1
06/27/2024
Permit issued — Plumbing
B01069603-I1-PL
06/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/27/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/27/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
06/25/2024
Permit issued — General Construction
B01069599-I1-GC
06/21/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NEW YARD DRAIN IN FRONT AND REAR. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01069603-I1
06/21/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01069599-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC11/26/2024
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC06/27/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC06/25/2024
1 job · most recent 05/19/2025
General Wiring
FiledStatusContractorScope
05/19/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/16/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/22/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/22/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
01/10/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
01/10/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
01/10/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
01/06/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
01/06/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
01/06/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/05/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/05/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
07/05/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/27/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/27/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/27/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026B01069599-I1Request digital key ↗
08/24/2026B01069599-P2Request digital key ↗
08/24/2026B01069599-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026B01069599-I1Open ↗
08/24/2026B01069599-P1Open ↗
08/24/2026B01069599-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/31/2026B01069599-P2Open ↗
08/31/2026B01069599-I1Open ↗
08/26/2026B01069599-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026B01069599-P2Open ↗
08/31/2026B01069599-I1Open ↗
08/26/2026B01069599-P1Open ↗
Showing 3 of 4 on file for this type