← Back
Two family frame
1317 EDWARDS AVENUE
BRONX · Throgs Neck-Schuylerville · BIN 2073546
💬 Discuss this project
1920Year Built
2.5Stories
B2Building Class
R4-1Zoning
1,496 sfGross Floor Area
2Units
Two family frame · 2,000 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/02/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/12/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/02/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/13/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01381731-I1
04/10/2026
Permit issued — Solar
X01381731-I1-SL
04/02/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01381731-I1
04/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/02/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/01/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC04/10/2026
1 project · most recent 04/02/2026
FiledStatusContractorScope
04/02/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 04/02/2026
FiledStatusContractorScope
04/02/2026Signed-offSUNRUN INSTALLATION SVC38 panels, 17.1 kw, 399.38 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/02/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/02/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
04/01/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/01/2026Energy Code Compliance InspectionsWalid Abdullaprogress
04/01/2026FinalWalid Abdullaprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026X01381731-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/22/2026X01381731-I1Open ↗
08/22/2026X01381731-I1Open ↗
08/22/2026X01381731-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026X01381731-I1Open ↗
08/22/2026X01381731-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026X01381731-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026X01381731-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026X01381731-I1Open ↗