← Back
Four families
1319 67 STREET
BROOKLYN · BIN 3142595
💬 Discuss this project
1920Year Built
2Stories
C3Building Class
R5BZoning
3,280 sfGross Floor Area
4Units
Rent Stabilized11 Open Violations 9 unresolved · 2 paperwork only ▸FDNY Report ↗
Four families · 4,000 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP206/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371206/28/2024
Building Lifecycle
All (30)Filed (2)Permit Issued (1)Signed Off (1)Violation (18)Inspection (2)Special Inspection (6)
05/01/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/06/2025
Violation issued (HPD, open)
A
03/18/2025
Signed off — Alteration
Remove 1 existing boiler and 1 H.W.H. in the existing 2 story building. Plumbing works as per plan. Install 4 new boilers and 4 H.W.H.. No change in egress, use, or occupancy.
B00965575-I1
11/27/2024
Violation issued (HPD, open)
I
07/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/28/2024
Filed — Alteration
Remove 1 existing boiler and 1 H.W.H. in the existing 2 story building. Plumbing works as per plan. Install 4 new boilers and 4 H.W.H.. No change in egress, use, or occupancy.
B00965575-P1
06/28/2024
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
06/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
06/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
06/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
06/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
06/14/2024
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
04/08/2024
Violation issued (HPD, open)
A
11/27/2023
Permit issued — Plumbing
B00965575-I1-PL
11/21/2023
Filed — Alteration
Remove 1 existing boiler and 1 H.W.H. in the existing 2 story building. Plumbing works as per plan. Install 4 new boilers and 4 H.W.H.. No change in egress, use, or occupancy.
B00965575-I1
11/21/2023
Violation issued (HPD, open)
I
03/21/2023
Violation issued (HPD, open)
A
11/09/2022
Violation issued (HPD, open)
I
02/22/2022
Violation issued (HPD, open)
A
04/06/2021
Violation issued (HPD, closed)
A
10/29/2019
Violation issued (HPD, closed)
I
10/15/2018
Violation issued (HPD, closed)
I
11/17/2017
Violation issued (HPD, closed)
I
10/07/2015
Violation issued (HPD, closed)
I
12/12/2007
Violation issued (ECB, open)
Zoning
12/12/2007
Violation issued (ECB, open)
Construction
11/13/2001
Violation issued (ECB, closed)
HPD
11/13/2001
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC11/27/2023
BISOTRE-ISSUEDUNIVERSAL GROUP OF NY INC12/12/2001
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/28/2024Tenant Protection Plan ComplianceEric Sunspecial
06/28/2024Fire-Resistant Penetrations and JointsEric Sunspecial
06/28/2024Energy Code Compliance InspectionsEric Sunprogress
06/14/2024Fire-Resistant Penetrations and JointsEric Sunspecial
06/14/2024Tenant Protection Plan ComplianceEric Sunspecial
06/14/2024Energy Code Compliance InspectionsEric Sunprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026B00965575-P1Request digital key ↗
08/24/2026B00965575-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWSpecial Inspector Seal & Signature4
08/22/2026B00965575-P1Open ↗
08/22/2026B00965575-I1Open ↗
08/22/2026B00965575-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026B00965575-I1Open ↗
08/24/2026B00965575-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026B00965575-P1Open ↗
08/22/2026B00965575-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026B00965575-I1Open ↗
08/24/2026B00965575-P1Open ↗