← Back
BuildNYC
Factory, heavy manufacturing, fireproof
132-02 89TH AVENUE
QUEENS · Richmond Hill · BIN 4438600
💬 Discuss this project
1923Year Built
2Stories
F1Building Class
M1-1Zoning
28,465 sfGross Floor Area
0Units
0 Active Violations 2 likely answered ▸FDNY Report ↗
Factory, heavy manufacturing, fireproof · Owner of record: 7 Fruits · 33,747 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofYork Analytical6p · 1 filing · 14 docs
Floor 5York Lab2p · 2 filings · 6 docs
Floor 4York Lab2p · 2 filings · 6 docs
Floor 3York Lab2p · 2 filings · 6 docs
Floor 2York Lab2p · 2 filings · 6 docs
Floor 1Michael J. Beckerich York Analytical, part of ALS, York Anal18p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Welner Associates1507/08/2026
WL Rich Hill603/21/2026
7 Fruits103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ocean Enterprises505/29/2025
RLM Engineering205/27/2025
Jose L. Pena, P.E206/05/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Just Architecture703/21/2026
Louis Striar403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Bell Construction of NYGeneral Contractor407/08/2026
Neptune Signs & AwningsSign hanger207/08/2026
Pegasus ElectricalElectrical103/21/2026
Fine MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519505/29/2025
Building Lifecycle
All (94)Filed (9)Permit Issued (5)Signed Off (2)Violation (46)Inspection (2)Special Inspection (30)
06/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/05/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
06/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/05/2025
Special inspection requirement — Final
NAVEEN KUMAR
06/05/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
06/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
06/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
06/05/2025
Special inspection requirement — Ventilation and air distribution system
Younes Abouyaala
06/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
06/05/2025
Special inspection requirement — Shutoff dampers
Younes Abouyaala
05/29/2025
Filed — Alteration
Plumbing work at 1st floor commercial space indicated on drawings filed herewith No change in Use Egress or Occupancy under this application
Q01170493-P2
05/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
05/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/27/2025
Filed — Alteration
Mechanical work at 1st floor and roof indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
Q01170528-P1
04/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/26/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
03/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
03/26/2025
Special inspection requirement — Lighting controls
Younes Abouyaala
03/26/2025
Special inspection requirement — Fenestration areas
03/26/2025
Special inspection requirement — Air barrier - visual inspection
03/26/2025
Special inspection requirement — Fenestration air leakage
03/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
03/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
03/26/2025
Special inspection requirement — Final
NAVEEN KUMAR
03/24/2025
Filed — Alteration
General Construction at 1st floor Commercial space indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
Q01170477-P1
03/24/2025
Filed — Alteration
Plumbing work at 1st floor commercial space indicated on drawings filed herewith No change in Use Egress or Occupancy under this application
Q01170493-P1
03/20/2025
Special inspection requirement — Fenestration areas
03/20/2025
Special inspection requirement — Air barrier - visual inspection
03/20/2025
Special inspection requirement — Fenestration air leakage
03/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
03/19/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
03/19/2025
Special inspection requirement — Lighting controls
Younes Abouyaala
03/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
03/19/2025
Special inspection requirement — Final
NAVEEN KUMAR
02/18/2025
Permit issued — Plumbing
Q01170493-I1-PL
02/14/2025
Permit issued — General Construction
Q01170477-I1-GC
02/14/2025
Permit issued — Mechanical Systems
Q01170528-I1-MS
01/28/2025
Filed — Alteration
Mechanical work at 1st floor and roof indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
Q01170528-I1
01/24/2025
Filed — Alteration
General Construction at 1st floor Commercial space indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
Q01170477-I1
01/24/2025
Filed — Alteration
Plumbing work at 1st floor commercial space indicated on drawings filed herewith No change in Use Egress or Occupancy under this application
Q01170493-I1
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/03/2019
Signed off — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - INSIDE PROPERTY LINES - YORK ANALYTICAL LABORATORIES INC. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00169210-I1
09/03/2019
Signed off — Alteration
NON ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - INSIDE PROPERTY LINES - NYC'S FIRST EMERGING CONTAMINANTS LAB. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00169142-I1
07/02/2019
Permit issued — Sign
Q00169142-I1-SG
07/01/2019
Permit issued — Sign
Q00169210-I1-SG
06/05/2019
Filed — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - INSIDE PROPERTY LINES - YORK ANALYTICAL LABORATORIES INC. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00169210-I1
06/05/2019
Filed — Alteration
NON ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - INSIDE PROPERTY LINES - NYC'S FIRST EMERGING CONTAMINANTS LAB. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00169142-I1
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/07/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/25/2017
Violation issued (FDNY_ORDER, closed)
05/10/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/01/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/2016
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
05/10/2016
Violation issued (ECB, closed)
Boilers
12/09/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFine Mechanical02/18/2025
DOB NOWGeneral ConstructionPermit IssuedBell Construction of NY02/14/2025
DOB NOWMechanical SystemsPermit IssuedBell Construction of NY02/14/2025
DOB NOWSignSigned-offNeptune Signs & Awnings07/02/2019
DOB NOWSignSigned-offNeptune Signs & Awnings07/01/2019
BISSPISSUEDHeads Up Fire Sprinkler05/25/2017
BISPLISSUEDGo Greener Plumbing04/14/2017
BISSPISSUEDHeads Up Fire Sprinkler04/08/2016
BISSPISSUEDHeads Up Fire Sprinkler03/26/2015
BISOTISSUEDSolar Energy Systems03/26/2010
BISOTISSUEDSolar Energy Systems09/04/2009
1 project · most recent 05/27/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/27/2025Permit IssuedBell Construction of NYHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin AH-1 through AH-12 #FXAQ12PVJU 12,000 BTU · Vrf Indoor ×24
DOAS-1 #FXMQ48MFVJU 48,000 BTU · Vrf Indoor ×2
DOAS-2 #FXMQ96MFVJU 96,000 BTU · Vrf Indoor ×2
HP-1 #RXYQ144AATJB 144,000 BTU · Vrf Outdoor ×2
HP-2 #RXYQ144AATJB 144,000 BTU · Vrf Outdoor ×2
Ventilation
Pennbarry EF-1 #REX12B 700 CFM · Exhaust Fan ×2
EF-2 #REX12B 1,300 CFM · Exhaust Fan ×2
Daikin ERV-1 #VAM300GVJU 300 CFM · Erv ×2
1 project · most recent 05/29/2025
Water/Sanitary
FiledStatusContractorScope
05/29/2025Signed-offFine MechanicalWater/Sanitary
3 projects · most recent 07/03/2025
General Wiring
FiledStatusContractorScope
07/03/2025CompleteKriscorp Electrical ContngGeneral Wiring
09/03/2021Permit IssuedJoseph Weinstein ElectricGeneral Wiring
09/04/2019CompleteRobert S. Covello—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
06/05/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/05/2025Mechanical SystemsYounes Abouyaalaspecial
06/05/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/05/2025FinalNAVEEN KUMARprogress
06/05/2025Maintenance informationYounes Abouyaalaenergy_progress
06/05/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
06/05/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
06/05/2025Ventilation and air distribution systemYounes Abouyaalaenergy_progress
06/05/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
06/05/2025Shutoff dampersYounes Abouyaalaenergy_progress
05/29/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/29/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
05/29/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
03/26/2025Interior lighting powerYounes Abouyaalaenergy_progress
03/26/2025Fenestration and door U-factor and product ratings—energy_progress
03/26/2025Lighting controlsYounes Abouyaalaenergy_progress
03/26/2025Fenestration areas—energy_progress
03/26/2025Air barrier - visual inspection—energy_progress
03/26/2025Fenestration air leakage—energy_progress
03/26/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
03/26/2025Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
03/26/2025FinalNAVEEN KUMARprogress
03/20/2025Fenestration areas—energy_progress
03/20/2025Air barrier - visual inspection—energy_progress
03/20/2025Fenestration air leakage—energy_progress
Latest 25 of 44.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
York AnalyticalLaboratoryFloor 1, Roof
Project Q01170528 Alteration · Permit Entire · 01/28/2025
Michael J. Beckerich York Analytical, part of ALSMedical / HealthcareFloor 1
Project Q01170477 Alteration · Permit Entire · 01/24/2025
Project Q01170493 Alteration · Permit Entire · 01/24/2025
York LabLaboratoryFloors 1–5
Project Q00169142 Alteration · LOC Issued · 06/05/2019
Project Q00169210 Alteration · LOC Issued · 06/05/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
08/20/2026Q01170493-P2Request digital key ↗
08/20/2026Q01170493-P1Request digital key ↗
08/20/2026Q01170493-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sign2
08/28/2026Q00169142-I1Request digital key ↗
08/28/2026Q00169210-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
05/10/2016421322731Open ↗
04/08/2015421097315Open ↗
09/20/2010420075313Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
04/27/2017421322731Open ↗
04/21/2016421097315Open ↗
04/08/2015421097315Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature16
09/12/2026Q01170477-P1Open ↗
09/01/2026Q01170477-P1Open ↗
09/01/2026Q01170477-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026Q01170493-P1Open ↗
08/20/2026Q01170493-I1Open ↗
08/20/2026Q01170493-P2Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
07/01/2016421322731Open ↗
04/08/2015421097315Open ↗
04/08/2015421097315Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q01170493-P1Open ↗
08/28/2026Q01170528-I1Open ↗
08/23/2026Q01170493-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/08/2015421097315Open ↗
09/08/2009420075313Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/08/2009420075313Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/08/2015421097315Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/10/2016421322731Open ↗
04/08/2015421097315Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
05/18/2015421097315Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/20/2026Q01170493-P1Open ↗
08/20/2026Q01170493-I1Open ↗
08/20/2026Q01170493-P2Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/08/2009420075313Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
07/01/2016421322731Open ↗
▸Energy Compliance2
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION1
10/06/2010420075313Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/01/2016421322731Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS3
05/10/2016421322731Open ↗
04/08/2015421097315Open ↗
09/08/2009420075313Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/06/2010420075313Open ↗
10/06/2010420075313Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
10/06/2010420075313Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
10/06/2010420075313Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
10/06/2010420075313Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
07/01/2016421322731Open ↗
04/08/2015421097315Open ↗
10/06/2010420075313Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
05/10/2016421322731Open ↗
04/08/2015421097315Open ↗
09/08/2009420075313Open ↗