← Back
Two stories - detached, small or mid-size
132-05 109 AVENUE
QUEENS · South Ozone Park · BIN 4206180
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R3-2Zoning
1,568 sfGross Floor Area
1Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: MORENO GROUP, LLC · 3,026 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 23p · 2 filings · 11 docs
Floor 13p · 2 filings · 11 docs
Cellar3p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KALICO GROUP809/13/2026
FEDERAL NATIONAL MORTGAGE ASSOCIATION203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/02/2025$527K—FANNIE MAE A/K/A FEDERAL NATIONAL MORTGAGE ASSOC → MORENO GROUP, LLC$336/sf building
09/07/2018$480K—— → —$306/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ DESIGN GROUP306/04/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor104/09/2026
M & M PIPING AND HEATINGPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275109/30/2025
Building Lifecycle
All (39)Filed (3)Permit Issued (2)Signed Off (2)Violation (29)Special Inspection (3)
07/27/2026
Signed off — Alteration
FILING TO REMOVE SHOWER, KITCHEN SINK AND GAS STOVE IN CELLAR. AND TO MODIFY PLUMBING IN CELLAR FOR TWO FIXTURE TOILET, AND GAS DRYER. REPLACE FIXTURES ON EXISTING ROUGHING IN EXISTING TOILET ON FIRST AND SECOND FLOOR.
Q01295292-I1
07/27/2026
Signed off — Alteration
INTERIOR RENOVATION TO REPAIR WATER DAMAGE ; REPLACE GYPSUM WALL AND CEILING BOARDS AND WOODEN FLOOR FINISHES. REPLACE VINYL SIDING AND ASPHALT ROOF SHINGLE OVER EXISTING.
Q01295242-I1
06/04/2026
Filed — Alteration
FILING TO REMOVE SHOWER, KITCHEN SINK AND GAS STOVE IN CELLAR. AND TO MODIFY PLUMBING IN CELLAR FOR TWO FIXTURE TOILET, AND GAS DRYER. REPLACE FIXTURES ON EXISTING ROUGHING IN EXISTING TOILET ON FIRST AND SECOND FLOOR.
Q01295292-P1
11/25/2025
Violation issued (HPD, open)
I
11/19/2025
Permit issued — Plumbing
Q01295292-I1-PL
10/31/2025
Permit issued — General Construction
Q01295242-I1-GC
09/30/2025
Filed — Alteration
FILING TO REMOVE SHOWER, KITCHEN SINK AND GAS STOVE IN CELLAR. AND TO MODIFY PLUMBING IN CELLAR FOR TWO FIXTURE TOILET, AND GAS DRYER. REPLACE FIXTURES ON EXISTING ROUGHING IN EXISTING TOILET ON FIRST AND SECOND FLOOR.
Q01295292-I1
09/30/2025
Filed — Alteration
INTERIOR RENOVATION TO REPAIR WATER DAMAGE ; REPLACE GYPSUM WALL AND CEILING BOARDS AND WOODEN FLOOR FINISHES. REPLACE VINYL SIDING AND ASPHALT ROOF SHINGLE OVER EXISTING.
Q01295242-I1
09/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
09/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
09/30/2025
Special inspection requirement — Final
BAKHTIAR SHAMLOO
12/05/2024
Violation issued (HPD, open)
I
11/29/2023
Violation issued (HPD, open)
I
11/18/2022
Violation issued (HPD, open)
I
08/26/2014
Violation issued (ECB, closed)
Construction
06/03/2014
Violation issued (ECB, closed)
Construction
03/29/2014
Violation issued (ECB, closed)
Construction
01/25/2014
Violation issued (ECB, closed)
Construction
11/21/2013
Violation issued (ECB, closed)
Construction
09/20/2013
Violation issued (ECB, closed)
Construction
07/19/2013
Violation issued (ECB, closed)
Construction
05/24/2013
Violation issued (ECB, closed)
Construction
03/09/2013
Violation issued (ECB, closed)
Construction
01/03/2013
Violation issued (ECB, closed)
Construction
10/02/2012
Violation issued (ECB, closed)
Construction
08/09/2012
Violation issued (ECB, closed)
Construction
07/02/2012
Violation issued (ECB, closed)
Construction
06/26/2012
Violation issued (ECB, closed)
Construction
04/27/2012
Violation issued (ECB, closed)
Construction
02/07/2012
Violation issued (ECB, closed)
Construction
11/30/2011
Violation issued (ECB, closed)
Construction
10/19/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/13/2011
Violation issued (ECB, closed)
Construction
07/25/2011
Violation issued (ECB, closed)
Construction
06/29/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/05/2011
Violation issued (ECB, closed)
Construction
01/05/2011
Violation issued (HPD, open)
B
01/05/2011
Violation issued (HPD, open)
C
01/05/2011
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING11/19/2025
DOB NOWGeneral ConstructionSigned-offJ&J DESIGNS INC10/31/2025
1 project · most recent 06/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/04/2026Signed-offM & M PIPING AND HEATINGGas, Water/Sanitary
1 project · most recent 10/06/2025
General Wiring
FiledStatusContractorScope
10/06/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/30/2025Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
09/30/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
09/30/2025FinalBAKHTIAR SHAMLOOprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026Q01295242-I1Request digital key ↗
08/16/2026Q01295292-P1Request digital key ↗
08/16/2026Q01295292-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026Q01295242-I1Open ↗
08/16/2026Q01295292-I1Open ↗
08/16/2026Q01295292-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026Q01295242-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01295242-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/18/2026Q01295242-I1Open ↗
08/16/2026Q01295292-I1Open ↗
08/16/2026Q01295292-P1Open ↗