← Back
BuildNYC
Church, synagogue, chapel
132-05 CROSS BAY BOULEVARD
QUEENS · Ozone Park · BIN 4448911
💬 Discuss this project
1958Year Built
2Stories
M1Building Class
R4AZoning
6,240 sfGross Floor Area
3Units
2 Active Violations 1 likely answered ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: Solid Rock Pentecostal Fellowship Church · 16,249 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11 filing
Sub-Basement1 filing
Site & exterior2 filings
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/02/2024$3.0M—— → —$481/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Anetonne Architecture308/06/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K.w.mcintosh ConstructionGeneral Contractor407/08/2026
K.w.mcintosh ConstructionScaffold407/08/2026
Building Lifecycle
05/22/2026
Permit expired, never signed off — Construction Fence
The city's record still shows this permit as issued, with no sign-off on its filing
Q01039389-I1-FN
05/07/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
Q01035465-I1-GC
02/25/2026
Boiler inspection report filed
Initial · no defects · Accepted
11/14/2025
Failure to file 2024 external low pressure inspection
DOB violation · open
05/22/2025
Permit renewed — Construction Fence
Renewed without changes
Q01039389-I1-FN
42 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—K.w.mcintosh Construction—
DOB NOW—K.w.mcintosh Construction—
DOB NOW—K.w.mcintosh Construction—
DOB NOW—K.w.mcintosh Construction—
Nothing on file for this building.
Nothing on file for this building.
10 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account