← Back
Elevator apt, fireproof with stores
132-14 41 ROAD
QUEENS · BIN 4114210
💬 Discuss this project
2024Year Built
6Stories
D6Building Class
R6Zoning
13,200 sfGross Floor Area
12Units
0 Open Violations
Elevator apt, fireproof with stores · Owner of record: LIBRA NY LLC · 4,125 sf lot · 3.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction75p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 2 docs
Floor 6Under Construction50p · 1 filing · 20 docs
Floor 5Under Construction69p · 1 filing · 20 docs
Floor 4Under Construction68p · 1 filing · 20 docs
Floor 3Under Construction68p · 1 filing · 20 docs
Floor 2Under Construction74p · 1 filing · 20 docs
Floor 1Under Construction49p · 1 filing · 20 docs
CellarUnder Construction73p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EXCELLENT METROPOLITAN CONSTRUCTION208/29/2026
13214 REALTY5507/08/2026
4630 ROBINSON STREET307/08/2026
PLATINUM SERVICES NY503/22/2026
TLS CONSTRUCTION GROUP I*703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/28/2022$3.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
EDWARD LUI ARCHITECT1003/21/2026
PHS CONSULTING SERVICE1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXCELLENT METROPOLITANGeneral Contractor1407/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor303/21/2026
CROWN PLUMBING INCPlumbing307/08/2026
TLS CONSTRUCTION GROUP I*General Contractor303/21/2026
L&L CONSTRUCTION DEVELOPGeneral Contractor207/08/2026
KJK ELECTRIC INCElectrical103/22/2026
AMERGY SOLAR INCGeneral Contractor107/08/2026
FLINT MECHANICAL CORPFire Protection106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC77781307/30/2026
SQ. ARCH, LLC4802105/24/2026
Building Lifecycle
All (128)Filed (18)Permit Issued (19)Signed Off (3)Violation (23)Inspection (9)Objection (26)Special Inspection (30)
07/30/2026
Filed — New Building
NB attached 6-story plus cellar mixed use building with 10 dwelling units on 2nd floor thru 6th floors and community facility on 1st floor and cellar.
Q00918451-P9
07/28/2026
Special inspection requirement — Sprinkler Systems
XIONGCAI GU
06/25/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/01/2026
Permit issued — Solar
Q01386088-I1-SL
05/24/2026
Filed — Alteration
Q01386088-I1
04/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/23/2026
Special inspection requirement — Air barrier - visual inspection
Kaijin Liang
04/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kaijin Liang
04/13/2026
Special inspection requirement — Final
Kaijin Liang
04/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Kaijin Liang
04/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kaijin Liang
01/08/2026
Permit issued — Plumbing
Q00918451-S7-PL
12/31/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/26/2025
Signed off — New Building
NB attached 6-story plus cellar mixed use building with 10 dwelling units on 2nd floor thru 6th floors and community facility on 1st floor and cellar.
Q00918451-S1
11/17/2025
Filed — New Building
NB attached 6-story plus cellar mixed use building with 10 dwelling units on 2nd floor thru 6th floors and community facility on 1st floor and cellar.
Q00918451-P8
10/22/2025
Special inspection requirement — Sprinkler Systems
XIONGCAI GU
10/12/2025
Violation issued (ECB, closed)
Unknown
10/04/2025
Violation issued (ECB, closed)
Construction
07/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/23/2025
Permit issued — Sprinklers
Q00918451-S7-PL
07/22/2025
Permit issued — Plumbing
Q00918451-S7-EW-SP
07/18/2025
Permit issued — General Construction
Q00918451-I1-GC
07/17/2025
Permit issued — Supported Scaffold
Q01221108-I1-SF
05/29/2025
Objection raised — Other
05/29/2025
Objection resolved — Addressed
05/12/2025
Filed — Alteration
Install supported pipe scaffold as per plans
Q01221108-I1
04/29/2025
Violation issued (ECB, closed)
Construction
04/08/2025
Violation issued (ECB, closed)
Construction
03/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIONGCAI GU
03/24/2025
Special inspection requirement — Electrical motors and elevators
XIONGCAI GU
03/24/2025
Special inspection requirement — Heating Systems
XIONGCAI GU
03/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIONGCAI GU
03/24/2025
Special inspection requirement — Duct leakage testing, insulation and design
XIONGCAI GU
03/24/2025
Special inspection requirement — Shutoff dampers
XIONGCAI GU
03/24/2025
Special inspection requirement — Final
XIONGCAI GU
03/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIONGCAI GU
03/24/2025
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
03/24/2025
Special inspection requirement — Maintenance information
XIONGCAI GU
03/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
03/24/2025
Special inspection requirement — Mechanical Systems
XIONGCAI GU
03/10/2025
Filed — New Building
NB attached 6-story plus cellar mixed use building with 10 dwelling units on 2nd floor thru 6th floors and community facility on 1st floor and cellar.
Q00918451-P6
03/10/2025
Filed — New Building
NB attached 6-story plus cellar mixed use building with 10 dwelling units on 2nd floor thru 6th floors and community facility on 1st floor and cellar.
Q00918451-P7
02/24/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01073547-I1
02/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIONGCAI GU
02/18/2025
Special inspection requirement — Electrical motors and elevators
XIONGCAI GU
02/18/2025
Special inspection requirement — Maintenance information
XIONGCAI GU
02/18/2025
Special inspection requirement — Final
XIONGCAI GU
02/18/2025
Special inspection requirement — Mechanical Systems
XIONGCAI GU
02/18/2025
Special inspection requirement — Duct leakage testing, insulation and design
XIONGCAI GU
02/18/2025
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
02/18/2025
Special inspection requirement — Shutoff dampers
XIONGCAI GU
02/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIONGCAI GU
02/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
02/18/2025
Special inspection requirement — Heating Systems
XIONGCAI GU
02/05/2025
Violation issued (ECB, closed)
Construction
12/26/2024
Permit issued — Construction Fence
Q00918451-S1-FN
12/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/30/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/25/2024
Violation issued (ECB, closed)
Construction
08/27/2024
Violation issued (ECB, closed)
Construction
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedAMERGY SOLAR INC06/01/2026
DOB NOWPlumbingPermit IssuedCROWN PLUMBING INC01/08/2026
DOB NOWSprinklersPermit IssuedCROWN PLUMBING INC07/23/2025
DOB NOWPlumbingPermit IssuedBLETSAS P&H CORP07/22/2025
DOB NOWGeneral ConstructionPermit IssuedEXCELLENT METROPOLITAN07/18/2025
DOB NOWSupported ScaffoldPermit IssuedEXCELLENT METROPOLITAN07/17/2025
DOB NOWConstruction FenceSigned-offEXCELLENT METROPOLITAN12/26/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC07/15/2024
DOB NOWStructuralPermit IssuedEXCELLENT METROPOLITAN05/29/2024
DOB NOWMechanical SystemsPermit IssuedEXCELLENT METROPOLITAN05/29/2024
DOB NOWGeneral ConstructionPermit IssuedEXCELLENT METROPOLITAN05/28/2024
DOB NOWPlumbingPermit IssuedCROWN PLUMBING INC05/23/2024
DOB NOWEarth WorkPermit IssuedEXCELLENT METROPOLITAN01/29/2024
DOB NOWConstruction FenceSigned-offEXCELLENT METROPOLITAN01/02/2024
DOB NOWSupport of ExcavationPermit IssuedEXCELLENT METROPOLITAN01/02/2024
DOB NOWSupport of ExcavationPermit IssuedL&L CONSTRUCTION DEVELOP12/27/2023
DOB NOWConstruction FenceSigned-offL&L CONSTRUCTION DEVELOP12/12/2023
DOB NOWConstruction FenceSigned-offTLS CONSTRUCTION GROUP I*11/30/2023
DOB NOWConstruction FenceSigned-offEXCELLENT METROPOLITAN07/31/2023
BIS—ISSUEDTLS CONSTRUCTION GROUP I*08/04/2023
BISPLISSUEDACCESS PLBG & HTG CORP01/05/1995
BIS—ISSUEDN/A10/04/1994
1 project · most recent 07/30/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/30/2026Permit IssuedEXCELLENT METROPOLITANAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MITSUBISHI, MXZ-3C24NAHZ3-U1 22,000 BTU · Split System ×8
MITSUBISHI, PUHY-P96TNU-A 96,000 BTU · Vrf Outdoor ×2
Mitsubishi, MXZ-2C20NAHZ3-U1 18,000 BTU · Split System ×2
1 project · most recent 07/30/2026
Sprinkler System
FiledStatusContractorScope
07/30/2026Permit IssuedBLETSAS P&H CORPSprinkler System
1 project · most recent 07/30/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/30/2026Permit IssuedCROWN PLUMBING INCGas, Storm, Water/Sanitary
4 projects · most recent 05/22/2026
General Wiring
FiledStatusContractorScope
05/22/2026CompleteI.P. ELECTRIC INC—
01/06/2025CompleteKJK ELECTRIC INCGeneral Wiring
07/19/2024Permit IssuedINFINITI ELECTRIC CORP—
07/02/2024CompleteILLUMINOUS ELECTRIC CORP.—
1 project · most recent 07/30/2026
Concrete
FiledStatusContractorScope
07/30/2026Permit IssuedCROWN PLUMBING INCConcrete
2 projects · most recent 07/30/2026
Fence Scaffold
FiledStatusContractorScope
07/30/2026Permit IssuedCROWN PLUMBING INCFence
05/12/2025Permit IssuedEXCELLENT METROPOLITANScaffold
1 project · most recent 07/30/2026
Earthwork
FiledStatusContractorScope
07/30/2026Permit IssuedCROWN PLUMBING INCEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/25/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/31/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/31/2024Pass-Final PL - UndergroundPassView ↗
04/26/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
07/28/2026Sprinkler SystemsXIONGCAI GUspecial
04/23/2026Structural Stability – Alterations of existing buildingsKaijin Liangspecial
04/23/2026Air barrier - visual inspectionKaijin Liangenergy_progress
04/13/2026FinalKaijin Liangprogress
04/13/2026Energy Code Compliance InspectionsKaijin Liangprogress
04/13/2026Fire-Resistant Penetrations and JointsKaijin Liangspecial
10/22/2025Sprinkler SystemsXIONGCAI GUspecial
03/24/2025HVAC-R and service water heating equipmentXIONGCAI GUenergy_progress
03/24/2025Shutoff dampersXIONGCAI GUenergy_progress
03/24/2025HVAC-R and service water heating system controlsXIONGCAI GUenergy_progress
03/24/2025HVAC-R and service water piping design and insulationXIONGCAI GUenergy_progress
03/24/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
03/24/2025Heating SystemsXIONGCAI GUspecial
03/24/2025Energy Code Compliance InspectionsXIONGCAI GUprogress
03/24/2025FinalXIONGCAI GUprogress
03/24/2025Duct leakage testing, insulation and designXIONGCAI GUenergy_progress
03/24/2025Electrical motors and elevatorsXIONGCAI GUenergy_progress
03/24/2025Mechanical SystemsXIONGCAI GUspecial
03/24/2025Maintenance informationXIONGCAI GUenergy_progress
02/18/2025Mechanical SystemsXIONGCAI GUspecial
02/18/2025HVAC-R and service water heating system controlsXIONGCAI GUenergy_progress
02/18/2025Heating SystemsXIONGCAI GUspecial
02/18/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
02/18/2025Electrical motors and elevatorsXIONGCAI GUenergy_progress
02/18/2025HVAC-R and service water piping design and insulationXIONGCAI GUenergy_progress
Latest 25 of 76.
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/25/2026Q00842767-I1Request digital key ↗
08/22/2026Q01073547-I1Request digital key ↗
08/20/2026Q01221108-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/28/2023421809680Open ↗
▸BISWORK PERMIT APPLICATION1
10/11/2023421809680Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00918451-P5Open ↗
08/13/2026Q00918451-I1Open ↗
▸Seals & Professional Certifications94
▸DOB NOWProgress Inspector Seal & Signature42
09/02/2026Q00918451-P3Open ↗
09/01/2026Q00918451-S5Open ↗
09/01/2026Q00918451-S5Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature34
09/19/2026Q00918451-P8Open ↗
09/02/2026Q00918451-P3Open ↗
09/02/2026Q00918451-P3Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/25/2026Q00842767-I1Open ↗
08/22/2026Q01073547-I1Open ↗
08/20/2026Q01221108-I1Open ↗
Showing 3 of 18 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00918451-P5Open ↗
08/13/2026Q00918451-I1Open ↗
▸BISGAS CUT-OFF1
10/11/2023421809680Open ↗
▸BISSEWER CUT-OFF1
10/11/2023421809680Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00918451-P5Open ↗
08/13/2026Q00918451-I1Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
10/11/2023421809680Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/13/2023421809680Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
10/11/2023421809680Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00918451-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/11/2023421809680Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00918451-S2Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00918451-S2Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/13/2023421809680Open ↗
10/11/2023421809680Open ↗
10/11/2023421809680Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
10/11/2023421809680Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
10/13/2023421809680Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
10/11/2023421809680Open ↗
▸BISEFILING COVER SHEET1
06/28/2023421809680Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification2
08/18/2026Q00918451-I1Open ↗
08/14/2026Q00918451-P5Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00918451-I1Open ↗
08/13/2026Q00918451-P5Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00918451-I1Open ↗
08/13/2026Q00918451-P5Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00918451-S3Open ↗
08/13/2026Q00918451-S2Open ↗