← Back
Two stories - detached, small or mid-size
132-15 109 AVENUE
QUEENS · South Ozone Park · BIN 4206177
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R3-2Zoning
1,296 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 1,825 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 1 filing · 7 docs
Floor 1
Cellar14p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 132-15 109 AVENU703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/17/2023$620K—Private party → Private party$478/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCALHEK412/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY BUILDING CONSULTANTSGeneral Contractor107/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCALHEK PC3340412/21/2022
Building Lifecycle
All (36)Filed (4)Permit Issued (2)Signed Off (2)Violation (12)Inspection (7)Objection (4)Special Inspection (5)
02/14/2023
Signed off — Alteration
Remove illegal fixtures in cellar (gas stove, residential sink and shower) , also to remove residential sink and electric stove in second floor . Legalize 2 c bathroom in cellar and legalize 3 pc bathroom in second floor and show partitions 2nd floor.
Q00604166-I1
01/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND CALAMARI
01/02/2023
Objection resolved — Addressed
01/02/2023
Objection resolved — Addressed
01/01/2023
Objection raised — Scope
01/01/2023
Objection raised — Zoning
12/21/2022
Filed — Alteration
Remove illegal fixtures in cellar (gas stove, residential sink and shower) , also to remove residential sink and electric stove in second floor . Legalize 2 c bathroom in cellar and legalize 3 pc bathroom in second floor and show partitions 2nd floor.
Q00604166-P2
12/20/2022
Violation issued (ECB, closed)
Construction
12/20/2022
Violation issued (ECB, closed)
Construction
12/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND CALAMARI
12/19/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/06/2022
Filed — Alteration
Remove illegal fixtures in cellar (gas stove, residential sink and shower) , also to remove residential sink and electric stove in second floor . Legalize 2 c bathroom in cellar and legalize 3 pc bathroom in second floor and show partitions 2nd floor.
Q00604166-P1
12/01/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/22/2022
Signed off — Alteration
application file to remove illegal partitions in cellar, restore second floor back to its legal condition.
Q00602801-I1
11/21/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/21/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/01/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/13/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/06/2022
Permit issued — General Construction
Q00602801-I1-GC
08/05/2022
Permit issued — Plumbing
Q00604166-I1-PL
10/15/2021
Filed — Alteration
Remove illegal fixtures in cellar (gas stove, residential sink and shower) , also to remove residential sink and electric stove in second floor . Legalize 2 c bathroom in cellar and legalize 3 pc bathroom in second floor and show partitions 2nd floor.
Q00604166-I1
10/05/2021
Filed — Alteration
application file to remove illegal partitions in cellar, restore second floor back to its legal condition.
Q00602801-I1
09/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND CALAMARI
09/29/2021
Special inspection requirement — Insulation placement and R values
RAYMOND CALAMARI
09/29/2021
Special inspection requirement — Lighting in dwelling units
RAYMOND CALAMARI
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/18/2021
Violation issued (ECB, closed)
Construction
08/04/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/23/2021
Violation issued (ECB, closed)
Construction
06/23/2021
Violation issued (ECB, closed)
Construction
06/23/2021
Violation issued (ECB, closed)
Zoning
06/23/2021
Violation issued (ECB, closed)
Unknown
06/23/2021
Violation issued (ECB, closed)
Construction
05/04/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCITY BUILDING CONSULTANTS10/06/2022
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP08/05/2022
3 projects · most recent 01/18/2023
General Wiring
FiledStatusContractorScope
01/18/2023CompleteRIVIERA ELECTRIC CORPGeneral Wiring
10/19/2022CompleteRAIDEN ELECTRIC LLC—
02/18/2019Permit IssuedTRIANGLE ELECTRIC INC.1 meters
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/21/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/01/2022Fail-Final General Construction Non-Directive 14FailView ↗
10/13/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/08/2023Fire-Resistant Penetrations and JointsRAYMOND CALAMARIspecial
12/20/2022Fire-Resistant Penetrations and JointsRAYMOND CALAMARIspecial
09/29/2021Fire-Resistant Penetrations and JointsRAYMOND CALAMARIspecial
09/29/2021Insulation placement and R valuesRAYMOND CALAMARIenergy_progress
09/29/2021Lighting in dwelling unitsRAYMOND CALAMARIenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00602801-I1Request digital key ↗
08/25/2026Q00604166-I1Request digital key ↗
08/25/2026Q00604166-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026Q00604166-I1Open ↗
08/25/2026Q00604166-P1Open ↗
08/25/2026Q00604166-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
10/03/2026Q00604166-P2Open ↗
08/25/2026Q00602801-I1Open ↗
08/23/2026Q00604166-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q00602801-I1Open ↗
08/25/2026Q00602801-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026Q00604166-I1Open ↗
08/25/2026Q00604166-P1Open ↗
08/15/2026Q00604166-P2Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00602801-I1Open ↗