← Back
QUEENS
132-15 60 AVE
QUEENS · BIN 4139351
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
5 Open Violations ▸FDNY Report ↗
Locations of Work
ArchitectureStructural
Roof2p · 1 filing · 7 docs
Floor 21p · 1 filing · 7 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC206/06/2026
Building Lifecycle
All (47)Filed (2)Violation (7)Objection (13)Special Inspection (25)
08/22/2026
Objection resolved — Resolved
08/22/2026
Objection resolved — Resolved
08/22/2026
Objection resolved — Resolved
08/22/2026
Objection resolved — Resolved
08/22/2026
Objection resolved — Resolved
08/22/2026
Objection resolved — Resolved
07/21/2026
Objection raised — Zoning
07/21/2026
Objection raised — Zoning
07/21/2026
Objection raised — Zoning
07/21/2026
Objection raised — Admin
07/21/2026
Objection raised — Other
07/21/2026
Objection raised — Other
06/12/2026
Objection raised — Admin
06/06/2026
Filed — New Building
PROPOSE A THREE STORY WITH THREE FAMILY HOUSE. OBTAIN NEW C OF O
Q01413200-I1
06/06/2026
Special inspection requirement — Mechanical Systems
06/06/2026
Special inspection requirement — Concrete - Cast-In-Place
06/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/06/2026
Special inspection requirement — Heating Systems
06/06/2026
Special inspection requirement — Masonry
06/06/2026
Special inspection requirement — Subgrade Inspections
06/06/2026
Special inspection requirement — Final
06/06/2026
Special inspection requirement — Energy Code Compliance Inspections
06/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/06/2026
Special inspection requirement — Fenestration areas
06/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/06/2026
Special inspection requirement — Insulation placement and R values
06/06/2026
Special inspection requirement — Metering
06/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/06/2026
Special inspection requirement — Permanent certificate
06/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/06/2026
Special inspection requirement — Electric vehicle service equipment requirements
06/06/2026
Special inspection requirement — Air barrier — testing
06/06/2026
Special inspection requirement — Ventilation and air distribution system
06/06/2026
Special inspection requirement — Maintenance information
06/06/2026
Special inspection requirement — Interior lighting power
06/06/2026
Special inspection requirement — Air barrier - visual inspection
06/06/2026
Special inspection requirement — Fenestration air leakage
05/31/2026
Filed — Full Demolition
Q01343842-I1
10/17/2025
Violation issued (HPD, open)
A
09/29/2025
Violation issued (HPD, closed)
I
09/28/2025
Violation issued (HPD, open)
C
09/28/2025
Violation issued (HPD, closed)
C
09/28/2025
Violation issued (HPD, open)
B
09/21/2025
Violation issued (HPD, open)
B
09/21/2025
Violation issued (HPD, open)
A
Nothing on file for this building.
1 project · most recent 06/06/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/06/2026——Heating Systems
Heating
Rheem PROPE50 M2 RH92 CS 40,000 BTU · Electric Heater ×4
1 project · most recent 06/06/2026
FiledStatusContractorScope
06/06/2026——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
06/06/2026Mechanical Systems—special
06/06/2026Concrete - Cast-In-Place—special
06/06/2026Fire-Resistant Penetrations and Joints—special
06/06/2026Heating Systems—special
06/06/2026Masonry—special
06/06/2026Subgrade Inspections—special
06/06/2026Final—progress
06/06/2026Energy Code Compliance Inspections—progress
06/06/2026Fire-Resistance Rated Construction—progress
06/06/2026Fenestration and door U-factor and product ratings—energy_progress
06/06/2026HVAC-R and service water piping design and insulation—energy_progress
06/06/2026Fenestration areas—energy_progress
06/06/2026Duct leakage testing, insulation and design—energy_progress
06/06/2026Insulation placement and R values—energy_progress
06/06/2026Metering—energy_progress
06/06/2026HVAC-R and service water heating equipment—energy_progress
06/06/2026Permanent certificate—energy_progress
06/06/2026HVAC-R and service water heating system controls—energy_progress
06/06/2026Electric vehicle service equipment requirements—energy_progress
06/06/2026Air barrier — testing —energy_progress
06/06/2026Ventilation and air distribution system—energy_progress
06/06/2026Maintenance information—energy_progress
06/06/2026Interior lighting power—energy_progress
06/06/2026Air barrier - visual inspection—energy_progress
06/06/2026Fenestration air leakage—energy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026Q01413200-I1Request digital key ↗
08/15/2026Q01343842-I1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
02/02/2026421844428Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026Q01413200-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/14/2026Q01413200-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026Q01413200-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026Q01343842-I1Open ↗
08/16/2026Q01413200-I1Open ↗
▸Other Documents2
▸DOB NOWSite Survey: Initial1
08/14/2026Q01413200-I1Open ↗
▸DOB NOWStructure Photographs1
08/15/2026Q01343842-I1Open ↗