← Back
Two family brick
132-28 POPLE AVENUE
QUEENS · Flushing-Willets Point · BIN 4115126
💬 Discuss this project
1945Year Built
2Stories
B1Building Class
R6Zoning
2,000 sfGross Floor Area
2Units
2 Open Violations ▸
Two family brick · Owner of record: HY & SONS ENTERPRISES LLC · 2,500 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction17p · 1 filing · 20 docs
PenthouseUnder Construction2p · 1 filing · 20 docs
Floor 4Under Construction15p · 1 filing · 20 docs
Floor 3Under Construction15p · 1 filing · 20 docs
Floor 2Under Construction17p · 2 filings · 20 docs
Floor 1Under Construction43p · 2 filings · 20 docs
CellarUnder Construction16p · 1 filing · 20 docs
Site & exterior15p · 1 filing · 6 docs
Filed — no permit issued5p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
132-28 CONDOMINIUM4109/13/2026
SAFE-SHIELD ENTERPRISES804/09/2026
LXC CONSTRUCTION103/22/2026
CONSTRUCTION INC LXC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAYSIDE ENGINEERING PC1308/10/2026
ASHRAF CORP307/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES603/21/2026
SUN103/21/2026
CNY ENGINEERING PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LXC CONSTRUCTION INCGeneral Contractor1907/11/2026
JJK BUILDING CONSULTINGGeneral Contractor207/08/2026
SAFE-SHEILD ENTERPRISE INGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S70101008/10/2026
Building Lifecycle
All (82)Filed (16)Permit Issued (16)Signed Off (1)Violation (8)Inspection (3)Objection (8)Special Inspection (30)
08/10/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed foundation design for 4 story building, as per plan, no change occupancy, use, or means of egress.
Q00909669-P3
08/10/2026
Filed — Alteration
Emergency temporary wall bracing to provide structural stability to the existing adjacent buildings (132-36 & 132-26 Pople Ave.) during the construction activities for the new Building on 132-28 Pople ave.
Q01409096-P1
08/08/2026
Special inspection requirement — Designated Seismic System
07/27/2026
Special inspection requirement — Structural Steel - Details
XIUCHENG LI
07/27/2026
Special inspection requirement — Structural Steel - High Strength Bolting
XIUCHENG LI
07/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
07/27/2026
Special inspection requirement — Final
XIUCHENG LI
07/27/2026
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
07/27/2026
Special inspection requirement — Masonry
XIUCHENG LI
07/27/2026
Special inspection requirement — Structural Steel - Welding
XIUCHENG LI
07/24/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/10/2026
Permit issued — Structural
Q00909669-S5-ST
06/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
06/09/2026
Permit issued — General Construction
Q01409096-I1-GC
06/02/2026
Permit issued — General Construction
Q00909669-I1-GC
05/29/2026
Filed — Alteration
Emergency temporary wall bracing to provide structural stability to the existing adjacent buildings (132-36 & 132-26 Pople Ave.) during the construction activities for the new Building on 132-28 Pople ave.
Q01409096-I1
05/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
05/14/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/14/2026
Violation issued (ECB, closed)
Unknown
05/14/2026
Violation issued (ECB, closed)
Site Safety
05/06/2026
Permit issued — Construction Fence
Q00909669-S1-FN
03/23/2026
Violation issued (ECB, open)
Construction
03/02/2026
Permit issued — Structural
Q00909669-S5-ST
02/24/2026
Permit issued — General Construction
Q00909669-I1-GC
02/02/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED FOR NEW BUILDING CONSTRUCTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE
Q01222542-I1
12/11/2025
Permit issued — Foundation
Q00909669-S6-FO
10/08/2025
Special inspection requirement — Duct leakage testing, insulation and design
10/06/2025
Permit issued — Support of Excavation
Q00909669-S3-SE
09/15/2025
Permit issued — Construction Fence
Q00909669-S1-FN
09/10/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed foundation design for 4 story building, as per plan, no change occupancy, use, or means of egress.
Q00909669-S7
09/08/2025
Special inspection requirement — Fenestration air leakage
XIUCHENG LI
09/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/08/2025
Special inspection requirement — Electrical motors and elevators
XIUCHENG LI
09/08/2025
Special inspection requirement — Exterior lighting power
XIUCHENG LI
09/08/2025
Special inspection requirement — Air barrier - visual inspection
XIUCHENG LI
09/08/2025
Special inspection requirement — Metering
XIUCHENG LI
09/08/2025
Special inspection requirement — Air barrier — testing
XIUCHENG LI
09/08/2025
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
09/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
09/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
09/08/2025
Special inspection requirement — Fenestration areas
XIUCHENG LI
09/08/2025
Special inspection requirement — Lighting in dwelling units
XIUCHENG LI
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
09/08/2025
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
09/08/2025
Special inspection requirement — Insulation placement and R values
XIUCHENG LI
09/08/2025
Special inspection requirement — Maintenance information
XIUCHENG LI
09/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
XIUCHENG LI
09/08/2025
Special inspection requirement — Interior lighting power
XIUCHENG LI
09/08/2025
Special inspection requirement — Protection of exposed foundation insulation
XIUCHENG LI
09/02/2025
Objection resolved — Addressed
08/13/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed foundation design for 4 story building, as per plan, no change occupancy, use, or means of egress.
Q00909669-P2
07/28/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED FOR NEW BUILDING CONSTRUCTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE
Q01222542-P2
07/20/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED FOR NEW BUILDING CONSTRUCTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE
Q01222542-P1
07/15/2025
Objection raised — Scope
06/17/2025
Filed — Alteration
INSTALL NEW PLUMBING AND SPRINKLER SYSTEM FOR NEW 4-STORY MIS-USE BUILDING IN CONJUNCTION WITH DOB NOW#Q00909669.NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q01206964-I1
06/11/2025
Objection resolved — Addressed
06/10/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed foundation design for 4 story building, as per plan, no change occupancy, use, or means of egress.
Q00909669-P1
06/10/2025
Objection raised — Scope
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedLXC CONSTRUCTION INC07/10/2026
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC06/09/2026
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC06/02/2026
DOB NOWConstruction FencePermit IssuedJJK BUILDING CONSULTING05/06/2026
DOB NOWStructuralPermit IssuedLXC CONSTRUCTION INC03/02/2026
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC02/24/2026
DOB NOWFoundationPermit IssuedLXC CONSTRUCTION INC12/11/2025
DOB NOWSupport of ExcavationPermit IssuedLXC CONSTRUCTION INC10/06/2025
DOB NOWConstruction FencePermit IssuedLXC CONSTRUCTION INC09/15/2025
DOB NOWSidewalk ShedSigned-offSAFE-SHEILD ENTERPRISE IN05/09/2025
DOB NOWFoundationPermit IssuedLXC CONSTRUCTION INC12/23/2024
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC12/20/2024
DOB NOWSupport of ExcavationPermit IssuedLXC CONSTRUCTION INC10/07/2024
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC08/29/2024
DOB NOWConstruction FencePermit IssuedLXC CONSTRUCTION INC07/10/2024
DOB NOWConstruction FencePermit IssuedJJK BUILDING CONSULTING03/01/2024
1 project · most recent 06/17/2025
FiledStatusContractorScope
06/17/2025——67 heads
2 projects · most recent 08/10/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/10/2026——Storm
06/17/2025——Storm, Water/Sanitary
1 project · most recent 08/10/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/10/2026Permit IssuedLXC CONSTRUCTION INCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/24/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 101
DateRequirementInspectorRole
08/08/2026Designated Seismic System—special
07/27/2026Structural Steel - WeldingXIUCHENG LIspecial
07/27/2026Concrete - Cast-In-PlaceXIUCHENG LIspecial
07/27/2026FinalXIUCHENG LIprogress
07/27/2026Structural Steel - High Strength BoltingXIUCHENG LIspecial
07/27/2026Structural Steel - DetailsXIUCHENG LIspecial
07/27/2026Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
07/27/2026MasonryXIUCHENG LIspecial
06/24/2026Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
05/29/2026Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
10/08/2025Duct leakage testing, insulation and design—energy_progress
09/08/2025Maintenance informationXIUCHENG LIenergy_progress
09/08/2025Lighting in dwelling unitsXIUCHENG LIenergy_progress
09/08/2025Lighting controlsXIUCHENG LIenergy_progress
09/08/2025Air barrier — testing XIUCHENG LIenergy_progress
09/08/2025Structural Stability – Alterations of existing buildings—special
09/08/2025Interior lighting powerXIUCHENG LIenergy_progress
09/08/2025Concrete - Cast-In-PlaceXIUCHENG LIspecial
09/08/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
09/08/2025Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
09/08/2025Fire-Resistance Rated ConstructionXIUCHENG LIprogress
09/08/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
09/08/2025Fenestration areasXIUCHENG LIenergy_progress
09/08/2025MeteringXIUCHENG LIenergy_progress
09/08/2025Air barrier - visual inspectionXIUCHENG LIenergy_progress
Latest 25 of 101.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/23/2026Q00909669-S9Request digital key ↗
08/23/2026Q00909669-S3Request digital key ↗
08/23/2026Q00909669-P3Request digital key ↗
Showing 3 of 18 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00909669-I1Open ↗
08/13/2026Q00909669-P2Open ↗
08/13/2026Q00909669-P1Open ↗
▸Seals & Professional Certifications40
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/23/2026Q00909669-P2Open ↗
08/23/2026Q00909669-S3Open ↗
08/23/2026Q00909669-P3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026Q01409096-P1Open ↗
08/29/2026Q01409096-I1Open ↗
08/28/2026Q00909669-S6Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026Q00909669-S6Open ↗
08/28/2026Q00909669-S6Open ↗
08/27/2026Q00909669-S5Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00909669-P1Open ↗
08/13/2026Q00909669-I1Open ↗
08/13/2026Q00909669-P2Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00909669-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/23/2026Q00909669-S8Open ↗
08/23/2026Q00909669-S3Open ↗
08/23/2026Q00909669-P3Open ↗
Showing 3 of 12 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00909669-S3Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00909669-S3Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/13/2026Q00909669-P2Open ↗
08/13/2026Q00909669-P1Open ↗
08/13/2026Q00909669-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00909669-P2Open ↗
08/13/2026Q00909669-P1Open ↗
08/13/2026Q00909669-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/23/2026Q00909669-P2Open ↗
08/23/2026Q00909669-I1Open ↗
08/14/2026Q00909669-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00909669-S3Open ↗