← Back
BuildNYC
Three families
132-31 58TH ROAD
QUEENS · BIN 4139232
💬 Discuss this project
1945Year Built
3Stories
C0Building Class
R4Zoning
2,440 sfGross Floor Area
3Units
Rent Stabilized6 Active Violations ▸FDNY Report ↗
Three families · Owner of record: 132 31 58th Zheng and Lu · 4,000 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 316p · 2 filings · 20 docs
Floor 217p · 2 filings · 20 docs
Floor 1Unit 1A16p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
132 31 58th Zheng and Lu103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/21/2023$1.4M—Private party → 132 31 58TH ZHENG AND LU LLC$584/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL Engineering501/25/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LT Pro ConstructionGeneral Contractor303/21/2026
Watson's Plumbing, Heating, & BuildingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781501/25/2024
Building Lifecycle
All (48)Filed (5)Permit Issued (2)Signed Off (2)Violation (17)Inspection (4)Special Inspection (18)
05/06/2026
Violation issued (HPD, open)
A
11/21/2025
Violation issued (HPD, open)
I
06/11/2025
Violation issued (HPD, open)
A
09/12/2024
Violation issued (ECB, closed)
Construction
09/12/2024
Violation issued (ECB, closed)
Construction
09/12/2024
Violation issued (ECB, closed)
Zoning
04/15/2024
Violation issued (HPD, open)
A
02/16/2024
Signed off — Alteration
FILE PLUMBING WORK OF 3-FAMILY BUILDING TO INSTALL NEW/RELOCATE PLUMBING FIXTURES AND GAS APPLIANCES AS PER PLAN. THIS APPLICATION IS IN CONJUNCTION WITH CONSTRUCTION WORK #Q00868101. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00868102-I1
02/13/2024
Signed off — Alteration
Q00868101-I1
01/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/26/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
01/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
01/25/2024
Filed — Alteration
FILE PLUMBING WORK OF 3-FAMILY BUILDING TO INSTALL NEW/RELOCATE PLUMBING FIXTURES AND GAS APPLIANCES AS PER PLAN. THIS APPLICATION IS IN CONJUNCTION WITH CONSTRUCTION WORK #Q00868101. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00868102-P2
01/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/25/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
01/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
11/24/2023
Violation issued (HPD, closed)
I
08/14/2023
Filed — Alteration
FILE PLUMBING WORK OF 3-FAMILY BUILDING TO INSTALL NEW/RELOCATE PLUMBING FIXTURES AND GAS APPLIANCES AS PER PLAN. THIS APPLICATION IS IN CONJUNCTION WITH CONSTRUCTION WORK #Q00868101. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00868102-P1
08/11/2023
Filed — Alteration
Q00868101-P1
08/11/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
08/11/2023
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
08/11/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
08/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/11/2023
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
08/11/2023
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
08/11/2023
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
08/11/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
08/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
08/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/11/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
08/11/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
07/11/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/06/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/09/2023
Permit issued — Plumbing
Q00868102-I1-PL
05/08/2023
Permit issued — General Construction
Q00868101-I1-GC
05/05/2023
Filed — Alteration
FILE PLUMBING WORK OF 3-FAMILY BUILDING TO INSTALL NEW/RELOCATE PLUMBING FIXTURES AND GAS APPLIANCES AS PER PLAN. THIS APPLICATION IS IN CONJUNCTION WITH CONSTRUCTION WORK #Q00868101. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00868102-I1
05/05/2023
Filed — Alteration
Q00868101-I1
03/28/2023
Violation issued (HPD, open)
A
11/15/2022
Violation issued (HPD, closed)
I
03/03/2022
Violation issued (HPD, closed)
I
03/03/2022
Violation issued (HPD, open)
A
10/23/2018
Violation issued (HPD, closed)
I
12/01/2017
Violation issued (HPD, closed)
I
11/17/2016
Violation issued (HPD, closed)
I
10/15/2015
Violation issued (HPD, closed)
I
02/26/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWatson's Plumbing, Heating, & Building05/09/2023
DOB NOWGeneral ConstructionSigned-offLT Pro Construction05/08/2023
1 project · most recent 09/21/2023
General Wiring
FiledStatusContractorScope
09/21/2023CompleteCL ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/11/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
01/26/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/26/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
01/26/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
01/25/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/25/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
01/25/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
08/11/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
08/11/2023Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
08/11/2023Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
08/11/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/11/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
08/11/2023Fenestration air leakageCHRISTIAN LOZADAenergy_progress
08/11/2023Fenestration areasCHRISTIAN LOZADAenergy_progress
08/11/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/11/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
08/11/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/11/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/11/2023FinalCHRISTIAN LOZADAprogress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026Q00868101-P1Request digital key ↗
08/24/2026Q00868101-I1Request digital key ↗
08/23/2026Q00868102-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q00868102-P2Open ↗
09/01/2026Q00868102-P2Open ↗
08/28/2026Q00868102-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026Q00868102-P2Open ↗
08/13/2026Q00868102-P1Open ↗
08/13/2026Q00868102-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00868102-P2Open ↗
08/28/2026Q00868102-I1Open ↗
08/25/2026Q00868101-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026Q00868102-I1Open ↗
08/13/2026Q00868102-P1Open ↗
08/13/2026Q00868102-P2Open ↗
Showing 3 of 5 on file for this type