← Back
BuildNYC
Auto body / collision or auto repair
132-39 34TH AVENUE
QUEENS · BIN 4111877
💬 Discuss this project
1998Year Built
1Stories
G2Building Class
M2-1Zoning
4,298 sfGross Floor Area
1Units
1 Active Violation ▸
Auto body / collision or auto repair · 3,948 sf lot · 1.09 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Al Auto Repair Shop1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Soyu Architecture205/18/2026
Kenny Lee Architect210/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
C Plus Design Group203/21/2026
Soyu Architecture403/21/2026
Building Lifecycle
All (45)Filed (4)Violation (4)Objection (31)Special Inspection (6)
06/04/2026
Objection raised — Inspections
06/04/2026
Objection raised — Other
06/04/2026
Objection raised — Structural
06/04/2026
Objection raised — Inspections
06/04/2026
Objection raised — Admin
06/04/2026
Objection raised — Structural
06/04/2026
Objection raised — Scope
05/18/2026
Filed — Alteration CO
INSTALLATION OF OFF DOMESTIC SPRINKLER HEADS FOR NEW PAINT SPRAY ROOM.
Q00717752-S1
04/27/2026
Special inspection requirement — Sprinkler Systems
05/04/2022
Objection raised — Admin
05/04/2022
Objection raised — Scope
05/03/2022
Objection raised — Structural
05/03/2022
Objection raised — Fire_Protection
05/02/2022
Filed — Alteration CO
INSTALLATION OF OFF DOMESTIC SPRINKLER HEADS FOR NEW PAINT SPRAY ROOM.
Q00717752-I1
11/12/2021
Objection resolved — Resolved
11/12/2021
Objection resolved — Resolved
11/12/2021
Objection resolved — Resolved
11/12/2021
Objection resolved — Resolved
11/12/2021
Objection resolved — Resolved
11/10/2021
Objection resolved — Resolved
11/10/2021
Objection resolved — Resolved
10/20/2021
Objection raised — Energy
10/20/2021
Objection raised — Structural
10/20/2021
Objection raised — Fire_Protection
10/20/2021
Objection raised — Fire_Protection
10/19/2021
Objection raised — Zoning
10/19/2021
Objection raised — Structural
10/18/2021
Filed — Alteration
INSTALLATION OF PAINT SPRAY BOOTH FOR EXISITNG AUTO REPAIR SHOP. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q00580874-S1
10/14/2021
Objection resolved — Addressed
10/14/2021
Objection resolved — Addressed
10/14/2021
Objection resolved — Addressed
10/14/2021
Special inspection requirement — Mechanical Systems
10/14/2021
Special inspection requirement — Final
10/14/2021
Special inspection requirement — Duct leakage testing, insulation and design
09/21/2021
Objection raised — Zoning
09/19/2021
Objection raised — Energy
09/19/2021
Objection raised — Admin
09/19/2021
Objection raised — Scope
09/14/2021
Filed — Alteration
INSTALLATION OF PAINT SPRAY BOOTH FOR EXISITNG AUTO REPAIR SHOP. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q00580874-I1
09/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/01/2021
Special inspection requirement — Air barrier - visual inspection
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/12/2003
Violation issued (HPD, open)
C
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/14/1997
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDAvon Plumbing & Heating03/27/1998
BIS—ISSUEDCorinth Associates01/15/1998
BISEQISSUEDVery Fine Construction11/18/1997
1 project · most recent 10/18/2021
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/18/2021——Ventilation Systems
Ventilation
Dayton 1AHB7 6,000 CFM · Exhaust Fan ×4
1 project · most recent 05/18/2026
Plumbing-Sprinkler
FiledStatusContractorScope
05/18/2026——Plumbing-Sprinkler
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/27/2026Sprinkler Systems—special
10/14/2021Mechanical Systems—special
10/14/2021Final—progress
10/14/2021Duct leakage testing, insulation and design—energy_progress
09/01/2021Fire-Resistant Penetrations and Joints—special
09/01/2021Air barrier - visual inspection—energy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Al Auto Repair ShopAutomotive / fuelFloor 1
Project Q00717752 Alteration CO · Objections · 05/02/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026Q00580874-S1Request digital key ↗
08/14/2026Q00580874-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026Q00580874-S1Open ↗
08/27/2026Q00580874-I1Open ↗