← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The 132 Metro Condominium
132-43 METROPOLITAN AVENUE · Kew Gardens · BIN 4625135
💬 Discuss this project
2022Year Built
8Stories
RMBuilding Class
R6Zoning
28,167 sfGross Floor Area
34Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 132 METRO LLC · 7,500 sf lot · 3.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof1 filing · 9 docs
Floor 8
Floor 71 filing
Floor 61 filing
Floor 51 filing
Floor 42 filings
Floor 31 filing
Floor 27p · 5 filings · 20 docs
Floor 13 filings
Site & exterior3 filings · 8 docs
Filed — no permit issued1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LBS CONSULTING SERVICES4407/08/2026
132-47 METRO703/22/2026
177 WEST END AVE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RBSD ARCHITECTS PC211/25/2025
BICALURO ASSOCIATES PC311/11/2024
KINDO HOLDINGS, LLC1506/10/2024
ENTHINK ENGINEERS LLC508/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FAVIO MARIA BARRIONUEVO1003/21/2026
LBS CONSULTING SERVICES3003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G-NADO INCGeneral Contractor907/08/2026
PROFESSIONAL LINE CORPGeneral Contractor604/09/2026
CAJ CONSTRUCTION CORPGeneral Contractor407/08/2026
AMOK INCPlumbing207/08/2026
AMOK INCFire Protection207/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
RRP PLUMBING CORPFire Protection107/08/2026
DELL MECHANICAL CORPPlumbing107/08/2026
RICHARD NEUElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAVID KATZ, P.E.6087411/25/2025
JOSEPH BOTTA, PE, PC1139411/12/2024
A&B WORLD CONSULTING, INC5704206/10/2024
ZARINA KINDO, RA4900601/12/2023
Building Lifecycle
All (99)Filed (25)Permit Issued (22)Signed Off (15)Violation (37)
05/16/2026
Violation issued (HPD, closed)
C
05/16/2026
Violation issued (HPD, closed)
B
05/11/2026
Violation issued (HPD, closed)
A
05/05/2026
Violation issued (HPD, open)
A
05/05/2026
Violation issued (HPD, closed)
A
05/05/2026
Violation issued (HPD, closed)
C
05/05/2026
Violation issued (HPD, closed)
C
05/05/2026
Violation issued (HPD, closed)
A
05/05/2026
Violation issued (HPD, closed)
A
05/05/2026
Violation issued (HPD, closed)
A
05/05/2026
Violation issued (HPD, closed)
A
03/24/2026
Signed off — Alteration
MEDISYS HEALTH NETWORK SURGICAL & ORTHOPEDIC AMBULATORY CARE CENTER. MODIFICATIONS TO EXISTING WET SPRINKLER SYSTEM- NEW SPRINKLER HEADS, PIPING,, ETC. AS PER PLANS SUBMITTED.
Q01133228-I1
01/08/2026
Signed off — Alteration
Q01133212-I1
01/08/2026
Signed off — Alteration
Q01133198-I1
01/07/2026
Signed off — Alteration
MEDISYS HEALTH NETWORK SURGICAL AND ORTHOPEDIC AMBULATORY CARE CENTER. DEMO EXIST NON-BEARING INTERIOR PARTITIONS, CONSTRUCT NEW NON-BEARING INTERIOR PARTITIONS, SUSPENDED CEILING, AND FINISHES AS PER PLANS SUBMITTED.
Q01133187-I1
11/25/2025
Filed — Alteration
MEDISYS HEALTH NETWORK SURGICAL AND ORTHOPEDIC AMBULATORY CARE CENTER. DEMO EXIST NON-BEARING INTERIOR PARTITIONS, CONSTRUCT NEW NON-BEARING INTERIOR PARTITIONS, SUSPENDED CEILING, AND FINISHES AS PER PLANS SUBMITTED.
Q01133187-P1
11/03/2025
Permit issued — General Construction
Q01133187-I1-GC
03/31/2025
Permit issued — Sprinklers
Q01133228-I1-EW-SP
03/28/2025
Permit issued — Plumbing
Q01133212-I1-PL
03/18/2025
Permit issued — Plumbing
Q01133212-I1-PL
03/07/2025
Permit issued — Mechanical Systems
Q01133198-I1-MS
03/07/2025
Permit issued — General Construction
Q01133187-I1-GC
11/12/2024
Filed — Alteration
MEDISYS HEALTH NETWORK SURGICAL AND ORTHOPEDIC AMBULATORY CARE CENTER. DEMO EXIST NON-BEARING INTERIOR PARTITIONS, CONSTRUCT NEW NON-BEARING INTERIOR PARTITIONS, SUSPENDED CEILING, AND FINISHES AS PER PLANS SUBMITTED.
Q01133187-I1
11/11/2024
Filed — Alteration
MEDISYS HEALTH NETWORK SURGICAL & ORTHOPEDIC AMBULATORY CARE CENTER. MODIFICATIONS TO EXISTING WET SPRINKLER SYSTEM- NEW SPRINKLER HEADS, PIPING,, ETC. AS PER PLANS SUBMITTED.
Q01133228-I1
11/11/2024
Filed — Alteration
Q01133212-I1
11/11/2024
Filed — Alteration
Q01133198-I1
07/30/2024
Signed off — Alteration
Mechanical work in conjunction with NB #421133008
Q00465011-I1
07/09/2024
Signed off — Alteration
Installation of the Wet Standpipe System with sprinkler take-off
Q08035642-I1
06/12/2024
Signed off — Alteration
Plumbing work in conjunction with NB #421133008
Q00461195-I1
06/10/2024
Filed — Alteration
Installation of the Wet Standpipe System with sprinkler take-off
Q08035642-P1
05/13/2024
Signed off — Alteration
Installation of a new curb cut in conjunction with a new building #421133008
Q00506515-I1
05/08/2024
Filed — Alteration
Plumbing work in conjunction with NB #421133008
Q00461195-P2
04/19/2024
Signed off — Alteration
Q00356077-I1
04/19/2024
Permit issued — Curb Cut
Q00506515-I1-CC
02/09/2024
Permit issued — Plumbing
Q00461195-I1-PL
02/09/2024
Permit issued — Mechanical Systems
Q00465011-I1-MS
01/15/2024
Violation issued (ECB, closed)
Unknown
01/15/2024
Violation issued (ECB, closed)
Unknown
01/15/2024
Violation issued (ECB, closed)
Unknown
01/15/2024
Violation issued (ECB, closed)
Unknown
12/12/2023
Violation issued (ECB, closed)
Construction
12/11/2023
Filed — Alteration
Plumbing work in conjunction with NB #421133008
Q00461195-P1
12/04/2023
Signed off — Alteration
Structural work in conjunction with NB #421133008
Q00571406-I1
11/28/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q08028024-I1
11/28/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NYC BUILDING CODE.
Q00821843-I1
11/28/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00818277-I1
11/13/2023
Permit issued — Sidewalk Shed
Q08028024-I1-SH
11/13/2023
Violation issued (ECB, closed)
Construction
10/14/2023
Filed — Alteration
Installation of a new curb cut in conjunction with a new building #421133008
Q00506515-I1
10/10/2023
Signed off — Alteration
Foundation and Earth work in conjunction with NB #421133008
Q00522884-I1
10/10/2023
Permit issued — Structural
Q00571406-I1-ST
08/24/2023
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NYC BUILDING CODE.
Q00821843-P1
08/23/2023
Violation issued (ECB, closed)
Construction
08/23/2023
Violation issued (ECB, closed)
Construction
08/23/2023
Violation issued (ECB, closed)
Construction
08/21/2023
Signed off — Alteration
Q08048501-I1
06/22/2023
Permit issued — Standpipe
Q08035642-I1-EW-SD
06/22/2023
Permit issued — Standpipe
Q08035642-I1-EW-SP
02/07/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q08028024-P1
02/02/2023
Permit issued — Protection and Mechanical Methods
Q00821843-I1-PMM
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCAJ CONSTRUCTION11/03/2025
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.03/31/2025
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG03/28/2025
DOB NOWPlumbingSigned-offDELL MECHANICAL CORP03/18/2025
DOB NOWMechanical SystemsSigned-offCAJ CONSTRUCTION03/07/2025
DOB NOWGeneral ConstructionSigned-offCAJ CONSTRUCTION03/07/2025
DOB NOWCurb CutSigned-offG-NADO INC04/19/2024
DOB NOWPlumbingSigned-offAMOK INC02/09/2024
DOB NOWMechanical SystemsSigned-offG-NADO INC02/09/2024
DOB NOWSidewalk ShedSigned-offPROFESSIONAL LINE CORP11/13/2023
DOB NOWStructuralSigned-offG-NADO INC10/10/2023
DOB NOWStandpipeSigned-offAMOK INC06/22/2023
DOB NOWStandpipeSigned-offAMOK INC06/22/2023
DOB NOWProtection and Mechanical MethodsSigned-offPROFESSIONAL LINE CORP02/02/2023
DOB NOWSupported ScaffoldSigned-offPROFESSIONAL LINE CORP02/01/2023
DOB NOWSidewalk ShedSigned-offPROFESSIONAL LINE CORP10/27/2022
DOB NOWPlumbingSigned-offAMOK INC09/27/2022
DOB NOWMechanical SystemsSigned-offG-NADO INC08/30/2022
DOB NOWEarth WorkSigned-offG-NADO INC08/02/2022
DOB NOWEarth WorkSigned-offG-NADO INC08/02/2022
DOB NOWFoundationSigned-offG-NADO INC06/17/2021
DOB NOWFoundationSigned-offG-NADO INC06/17/2021
BIS—ISSUEDG-NADO INC02/08/2024
BIS—ISSUEDG-NADO INC01/09/2023
BISEQISSUEDCHESAKL ENTERPRISES INC12/20/2022
BIS—ISSUEDG-NADO INC08/31/2022
BIS—ISSUEDG-NADO INC08/31/2022
BIS—ISSUEDG-NADO INC06/06/2022
BIS—RE-ISSUEDG-NADO INC07/13/2021
BIS—ISSUEDG-NADO INC07/13/2021
BISPLISSUEDACCURATE MECHANICAL INC10/07/2004
4 projects · most recent 04/15/2026
General Wiring
FiledStatusContractorScope
04/15/2026Permit IssuedL J ELEC'L SERV. INC.General Wiring
06/19/2024CompleteACCURATE ELEC'L CORP.General Wiring
06/01/2023CompletePOWER DIRECT ELECTRIC INC—
10/27/2022CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
12/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/29/2025Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
05/31/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
05/31/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/31/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/29/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
05/29/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/29/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/10/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
08/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/13/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
12/17/2025Fire-Resistant Penetrations and JointsDavid Katzspecial
12/17/2025Tenant Protection Plan ComplianceJOSEPH BOTTAspecial
12/17/2025FinalDavid Katzprogress
12/17/2025Fire-Resistance Rated ConstructionDavid Katzprogress
12/17/2025Lighting controlsDavid Katzenergy_progress
12/17/2025Interior lighting powerDavid Katzenergy_progress
11/18/2025FinalDavid Katzprogress
11/18/2025Fire-Resistant Penetrations and JointsDavid Katzspecial
11/18/2025Lighting controlsDavid Katzenergy_progress
11/18/2025Interior lighting powerDavid Katzenergy_progress
11/18/2025Fire-Resistance Rated ConstructionDavid Katzprogress
11/18/2025Tenant Protection Plan Compliance—special
11/04/2024Energy Code Compliance InspectionsDavid Katzprogress
11/04/2024HVAC-R and service water heating system controlsDavid Katzenergy_progress
11/04/2024Maintenance informationDavid Katzenergy_progress
11/04/2024Tenant Protection Plan ComplianceJOSEPH BOTTAspecial
11/04/2024Shutoff dampersDavid Katzenergy_progress
11/04/2024Permanent certificateDavid Katzenergy_progress
11/04/2024HVAC-R and service water heating equipmentDavid Katzenergy_progress
11/04/2024HVAC-R and service water piping design and insulationDavid Katzenergy_progress
10/28/2024Post-installed AnchorsDavid Katzspecial
10/28/2024FinalDavid Katzprogress
10/28/2024Fire-Resistant Penetrations and JointsDavid Katzspecial
10/28/2024Sprinkler SystemsDavid Katzspecial
10/28/2024Tenant Protection Plan ComplianceJOSEPH BOTTAspecial
Latest 25 of 61.
▾Documents — 255 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch19
08/27/2026Q00522884-P2Request digital key ↗
08/27/2026Q00522884-P1Request digital key ↗
08/25/2026Q08028024-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/22/2026Q00461195-P2Request digital key ↗
08/15/2026Q00461195-P1Request digital key ↗
08/15/2026Q00461195-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/25/2026Q00465011-I1Request digital key ↗
08/25/2026Q00465011-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00356077-I1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION18
07/11/2025421840725Open ↗
08/28/2024421133008Open ↗
03/04/2024401599230Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION7
06/27/2025421133008Open ↗
06/27/2025421133008Open ↗
06/03/2025421133008Open ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records17
▸BISADDRESS: NEW HOUSE NUMBER APPROVED3
07/18/2024421840725Open ↗
07/18/2024421840725Open ↗
06/07/2022421133008Open ↗
▸BISZONING DIAGRAM3
11/09/2023421133008Open ↗
08/03/2022421133008Open ↗
05/24/2021421133008Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED3
07/16/2024421840725Open ↗
10/20/2023440808805Open ↗
06/07/2022421133008Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
07/18/2024421840725Open ↗
08/03/2022421133008Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
07/18/2024421840725Open ↗
08/03/2022421133008Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
07/18/2024421840725Open ↗
▸BISRESTRICTION: EASEMENT AGREEMENT1
08/03/2022421133008Open ↗
▸BISVERIFY TAX LOT1
05/03/2024421133008Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/24/2024421133008Open ↗
▸Seals & Professional Certifications77
▸DOB NOWProgress Inspector Seal & Signature26
09/07/2026Q00571406-I1Open ↗
09/01/2026Q00461195-P1Open ↗
09/01/2026Q00461195-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/28/2026Q00356077-I1Open ↗
08/27/2026Q00571406-I1Open ↗
08/27/2026Q00522884-P1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/07/2026Q00571406-I1Open ↗
09/07/2026Q00571406-I1Open ↗
09/07/2026Q00571406-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/20/2023440808805Open ↗
12/15/2022440761365Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/15/2022440761365Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/20/2023440808805Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/15/2021421133008Open ↗
▸Trade Schedules & Equipment4
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
05/24/2021421133008Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/08/2024421133008Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/09/2024421133008Open ↗
▸BISPLUMBING (PL) SIGNOFF1
07/17/2024421133008Open ↗
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST3
10/25/2023440808805Open ↗
06/07/2022421133008Open ↗
05/24/2021421133008Open ↗
▸BISSTREET TREES SITE PLAN2
07/24/2024440808805Open ↗
07/24/2024421133008Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
09/15/2021421133008Open ↗
07/06/2021421133008Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
10/07/2024421133008Open ↗
▸BISBPP: STREET TREES SITE PLAN1
10/26/2023440808805Open ↗
▸BISSTREET TREE SIGNOFF1
07/24/2024440808805Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/06/2021421133008Open ↗
05/24/2021421133008Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00461195-I1Open ↗
08/13/2026Q00465011-I1Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/30/2024421133008Open ↗
▸BISFENESTRATION AREAS1
07/30/2024421133008Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
07/30/2024421133008Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/30/2024421133008Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/30/2024421133008Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/30/2024421133008Open ↗
▸BISELECTRIC MOTORS1
07/30/2024421133008Open ↗
▸BISLIGHTING CONTROLS1
07/30/2024421133008Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/15/2021421133008Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/30/2024421133008Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY4
10/02/2023440761365Open ↗
12/15/2022440761365Open ↗
07/06/2021421133008Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
05/24/2024421133008Open ↗
05/24/2024421133008Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/30/2024421133008Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/30/2024421133008Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
07/30/2024421133008Open ↗
▸BISSOIL REPORT1
05/05/2021421133008Open ↗
▸Approvals, Objections & Sign-offs17
▸BISSCHEDULE A - OCCUPANCY / USE12
08/28/2024421133008Open ↗
11/08/2023421133008Open ↗
09/19/2023421133008Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
09/19/2025421133008Open ↗
09/19/2025421133008Open ↗
09/19/2025421133008Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL1
10/02/2023440761365Open ↗
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE3
07/03/2025421133008Open ↗
09/15/2021421133008Open ↗
07/06/2021421133008Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/02/2023440761365Open ↗
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION9
11/09/2023421133008Open ↗
11/06/2023421133008Open ↗
10/18/2023421133008Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM5
07/14/2025421840725Open ↗
07/03/2025421133008Open ↗
07/03/2025421133008Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/20/2023440808805Open ↗
12/15/2022440761365Open ↗
▸BISEFILING COVER SHEET2
07/14/2025421840725Open ↗
07/06/2021421133008Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026Q00461195-P2Open ↗
▸Other Documents12
▸BISRECORDS MGMT FEE PAYMENT RECEIPT2
07/16/2024421840725Open ↗
10/20/2023440808805Open ↗
▸BISPLOT DIAGRAM2
04/23/2022421133008Open ↗
05/24/2021421133008Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/25/2023440808805Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
07/30/2024421133008Open ↗
▸BISVESTIBULES1
07/30/2024421133008Open ↗
▸BISMAINTENANCE INFORMATION1
07/30/2024421133008Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
07/30/2024421133008Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/20/2023440808805Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
07/30/2024421133008Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00522884-I1Open ↗