← Back
Two family frame
132-46 88TH STREET
QUEENS · BIN 4245139
💬 Discuss this project
1960Year Built
2Stories
B2Building Class
R4AZoning
2,496 sfGross Floor Area
2Units
Two family frame · 6,759 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralCivil
Floor 22p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ DESIGN GROUP507/14/2025
TABRIZ GROUP ENTERPRISES304/09/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HYPER STRUCTURES GRP INCGeneral Contractor707/08/2026
PRECISION HOME DEV INCGeneral Contractor104/09/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275604/09/2025
TRIANGLE INSPECTION & TES7495212/31/2024
Building Lifecycle
All (72)Filed (8)Permit Issued (7)Signed Off (3)Inspection (10)Objection (14)Special Inspection (30)
07/17/2025
Signed off — Alteration
PROPOSED 12 FEET WIDE CURB CUT.
Q01238075-I1
07/16/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/14/2025
Filed — Alteration
PROPOSED 12 FEET WIDE CURB CUT.
Q01238075-P1
06/20/2025
Permit issued — Curb Cut
Q01238075-I1-CC
06/16/2025
Filed — Alteration
PROPOSED 12 FEET WIDE CURB CUT.
Q01238075-I1
05/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/09/2025
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Ventilation and air distribution system
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Final
HARI SONI
05/09/2025
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
05/09/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
05/09/2025
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
04/23/2025
Objection resolved — Addressed
04/22/2025
Objection raised — Other
04/17/2025
Signed off — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#Q00965985
Q00994353-I1
04/09/2025
Filed — Alteration CO
TWO STORY HORIZONTAL ENLARGEMENT AND FULL INTERIOR RENOVATION TO EXISTING BUILDING. SINGLE FAMILY TO REMAIN.
Q00965985-P2
04/04/2025
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
04/04/2025
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
04/04/2025
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
04/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
04/04/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/04/2025
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
04/04/2025
Special inspection requirement — Final
HARI SONI
04/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
04/04/2025
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
04/04/2025
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
02/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/03/2025
Permit issued — Earth Work
Q00965985-I1-GC-CX
02/03/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/29/2025
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE TO SAFEGUARD SITE.
Q00999172-I1
12/31/2024
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#Q00965985
Q00994353-P1
11/12/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/04/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/04/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/01/2024
Permit issued — Foundation
Q00965985-I1-GC-CX
11/01/2024
Permit issued — Construction Fence
Q00999172-I1-FN
10/28/2024
Permit issued — Plumbing
Q00994353-I1-PL
03/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/13/2024
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#Q00965985
Q00994353-I1
03/13/2024
Permit issued — Foundation
Q00965985-I1-GC-CX
03/04/2024
Permit issued — Construction Fence
Q00999172-I1-FN
02/22/2024
Objection resolved — Addressed
02/21/2024
Objection raised — Other
02/12/2024
Filed — Alteration CO
TWO STORY HORIZONTAL ENLARGEMENT AND FULL INTERIOR RENOVATION TO EXISTING BUILDING. SINGLE FAMILY TO REMAIN.
Q00965985-P1
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offPRECISION HOME DEV INC06/20/2025
DOB NOWEarth WorkPermit IssuedHYPER STRUCTURES GRP INC02/03/2025
DOB NOWFoundationPermit IssuedHYPER STRUCTURES GRP INC11/01/2024
DOB NOWConstruction FenceSigned-offHYPER STRUCTURES GRP INC11/01/2024
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN10/28/2024
DOB NOWFoundationPermit IssuedHYPER STRUCTURES GRP INC03/13/2024
DOB NOWConstruction FenceSigned-offHYPER STRUCTURES GRP INC03/04/2024
1 job · most recent 04/21/2025
General Wiring
FiledStatusContractorScope
04/21/2025CompleteDNR ELECTRIC INCORPORATEGeneral Wiring
1 job · most recent 04/09/2025
FiledStatusContractorScope
04/09/2025Permit IssuedHYPER STRUCTURES GRP INC3 scope_items
1 job · most recent 04/09/2025
Earthwork
FiledStatusContractorScope
04/09/2025Permit IssuedHYPER STRUCTURES GRP INCEarthwork
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/16/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/12/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/04/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/04/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
05/09/2025Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
05/09/2025Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
05/09/2025Maintenance informationBAKHTIAR SHAMLOOenergy_progress
05/09/2025Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
05/09/2025Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
05/09/2025Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
05/09/2025Permanent certificateBAKHTIAR SHAMLOOenergy_progress
05/09/2025MeteringBAKHTIAR SHAMLOOenergy_progress
05/09/2025Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
05/09/2025Fenestration areasBAKHTIAR SHAMLOOenergy_progress
05/09/2025Ventilation and air distribution systemBAKHTIAR SHAMLOOenergy_progress
05/09/2025Footing and FoundationBAKHTIAR SHAMLOOprogress
05/09/2025FinalHARI SONIprogress
05/09/2025Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
05/09/2025Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
05/09/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
05/09/2025Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
05/09/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
05/09/2025MasonryBAKHTIAR SHAMLOOspecial
04/04/2025Fenestration areasBAKHTIAR SHAMLOOenergy_progress
04/04/2025Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
04/04/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
04/04/2025MasonryBAKHTIAR SHAMLOOspecial
04/04/2025Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
04/04/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
Latest 25 of 57.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026Q00999172-I1Request digital key ↗
08/23/2026Q00994353-P1Request digital key ↗
08/23/2026Q00994353-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00965985-I1Open ↗
08/13/2026Q00965985-P2Open ↗
08/13/2026Q00965985-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00965985-P1Open ↗
08/13/2026Q00965985-I1Open ↗
08/13/2026Q00965985-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00965985-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026Q00965985-I1Open ↗
09/01/2026Q00965985-I1Open ↗
09/01/2026Q00965985-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026Q00999172-I1Open ↗
08/23/2026Q00994353-P1Open ↗
08/23/2026Q00994353-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q00965985-I1Open ↗
09/01/2026Q00965985-I1Open ↗
08/31/2026Q00965985-P2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00965985-I1Open ↗
08/13/2026Q00965985-P1Open ↗
08/13/2026Q00965985-P2Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026Q00994353-P1Open ↗
08/23/2026Q00994353-I1Open ↗
08/20/2026Q00965985-P1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026Q00965985-P1Open ↗
08/13/2026Q00965985-I1Open ↗
08/13/2026Q00965985-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00965985-I1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/13/2026Q00965985-P1Open ↗
08/13/2026Q00965985-I1Open ↗
08/13/2026Q00965985-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00965985-P1Open ↗
08/13/2026Q00965985-I1Open ↗
08/13/2026Q00965985-P2Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00965985-P1Open ↗
08/13/2026Q00965985-I1Open ↗
08/13/2026Q00965985-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026Q00965985-I1Open ↗
08/20/2026Q00965985-P1Open ↗
08/15/2026Q00965985-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00965985-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00965985-I1Open ↗