← Back
School or academy
Allen-Stevenson School
130 EAST 78 STREET · Upper East Side-Carnegie Hill · BIN 1083340
💬 Discuss this project
1910Year Built
5Stories
W3Building Class
C1-8XZoning
95,921 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized7 Open Violations ▸FISP: No Report Filed
School or academy · Owner of record: THE ALLEN STEVENSON SCHOOL · 14,168 sf lot · 6.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 6 filings · 20 docs
Floor 71p · 1 filing · 12 docs
Floor 66p · 4 filings · 20 docs
Floor 5
Floor 4
Floor 32 filings · 8 docs
Floor 2Under Construction6p · 3 filings · 20 docs
Floor 11p · 3 filings · 20 docs
Cellar3p · 3 filings · 20 docs
Site & exterior8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALLEN-STEVENSON SCHOOL16109/13/2026
ALLAN-STEVENSON SCHOOL303/21/2026
PAV-LAK CONTRACTING103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EUROCELT EXPEDITING, INC1803/21/2026
DOMANI CONSULTING2503/21/2026
A1 EXPEDITING SERVICE603/21/2026
PATUXENT ENGINEERING603/21/2026
PAR PLUMBING GROUP603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REPUBLIC SCAFFOLD&HOIST CGeneral Contractor3707/08/2026
PAV-LAK CONTRACTING INCGeneral Contractor1107/08/2026
REPUBLIC EXTERIOR SERVICEGeneral Contractor907/08/2026
MACCARONE PLUMBING INCPlumbing307/08/2026
SAV-MOR MECHANICAL, INCGeneral Contractor307/08/2026
SKYVIEW HTG&AIR CON CORPPlumbing207/08/2026
G BUILDERS III LLCGeneral Contractor207/08/2026
MEGA PLBG CORPFire Protection106/28/2026
A & F FIRE PROTECTION COFire Protection107/08/2026
PATRIOT ELECTRIC CORPElectrical103/22/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
MEGA PLBG CORPPlumbing106/28/2026
BRIAN CLARKEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018508/13/2026
DOMANI INSPECTION SERVICE8431803/13/2023
Building Lifecycle
All (267)Filed (48)Permit Issued (46)Signed Off (21)Violation (35)Inspection (7)Objection (80)Special Inspection (30)
08/26/2026
Special inspection requirement — Mechanical Systems
William Ryan
08/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
William Ryan
08/26/2026
Special inspection requirement — Final
William Ryan
08/26/2026
Special inspection requirement — Maintenance information
William Ryan
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
08/26/2026
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
08/26/2026
Special inspection requirement — Post-installed Anchors
William Ryan
08/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
William Ryan
08/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
08/25/2026
Signed off — Alteration
RENOVATION OF A MAKER SPACE IN AN EXISTING SCHOOL BUILDING ON 2ND FLOOR WITH NEW MOP SINK AND ASSOCIATED BRANCH PIPING.
M01404318-S2
08/25/2026
Signed off — Alteration
RENOVATION OF A MAKER SPACE IN AN EXISTING SCHOOL BUILDING ON 2ND FLOOR WITH NEW MOP SINK AND ASSOCIATED BRANCH PIPING.
M01404318-I1
08/25/2026
Objection resolved — Addressed
08/20/2026
Objection raised — Cost
08/13/2026
Filed — Alteration
RENOVATION OF A MAKER SPACE IN AN EXISTING SCHOOL BUILDING ON 2ND FLOOR WITH NEW MOP SINK AND ASSOCIATED BRANCH PIPING.
M01404318-P1
08/03/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/29/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2026
Permit issued — Sprinklers
M01404318-S3-EW-SP
06/12/2026
Permit issued — Plumbing
M01404318-S2-PL
06/11/2026
Permit issued — General Construction
M01404318-I1-GC
06/11/2026
Permit issued — Mechanical Systems
M01404318-S1-MS
06/09/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/08/2026
Objection resolved — Addressed
06/08/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
05/28/2026
Objection raised — Other
05/28/2026
Objection raised — Scope
05/28/2026
Objection raised — Structural
05/28/2026
Objection raised — Scope
05/28/2026
Objection raised — Scope
05/28/2026
Objection raised — Other
05/28/2026
Objection raised — Inspections
05/27/2026
Objection raised — Scope
05/27/2026
Objection raised — Other
05/27/2026
Objection raised — Other
05/27/2026
Objection raised — Cost
05/27/2026
Objection raised — Inspections
05/27/2026
Objection raised — Other
05/21/2026
Filed — Alteration
RENOVATION OF A MAKER SPACE IN AN EXISTING SCHOOL BUILDING ON 2ND FLOOR WITH NEW MOP SINK AND ASSOCIATED BRANCH PIPING.
M01404318-S2
05/21/2026
Filed — Alteration
RENOVATION OF A MAKER SPACE IN AN EXISTING SCHOOL BUILDING ON 2ND FLOOR WITH NEW MOP SINK AND ASSOCIATED BRANCH PIPING.
M01404318-I1
05/21/2026
Filed — Alteration
RENOVATION OF A MAKER SPACE IN AN EXISTING SCHOOL BUILDING ON 2ND FLOOR WITH NEW MOP SINK AND ASSOCIATED BRANCH PIPING.
M01404318-S3
05/21/2026
Filed — Alteration
RENOVATION OF A MAKER SPACE IN AN EXISTING SCHOOL BUILDING ON 2ND FLOOR WITH NEW MOP SINK AND ASSOCIATED BRANCH PIPING.
M01404318-S1
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
09/10/2025
Signed off — Alteration
Installation of new plumbing fixtures. No change in use, egress or occupancy.
M00364811-I1
04/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/12/2023
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
M00108248-I1
06/20/2023
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
06/06/2023
Objection resolved — Addressed
Latest 60 of 267 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offMEGA PLBG CORP06/12/2026
DOB NOWPlumbingPermit IssuedMEGA PLBG CORP06/12/2026
DOB NOWGeneral ConstructionSigned-offG BUILDERS III LLC06/11/2026
DOB NOWMechanical SystemsSigned-offG BUILDERS III LLC06/11/2026
DOB NOWBoiler EquipmentSigned-offNEW YORK HEATING CORP01/06/2023
DOB NOWPlumbingSigned-offMACCARONE PLUMBING INC09/14/2022
DOB NOWPlumbingSigned-offMACCARONE PLUMBING INC08/18/2022
DOB NOWSupported ScaffoldSigned-offREPUBLIC EXTERIOR SERVICE04/06/2022
DOB NOWSidewalk ShedSigned-offREPUBLIC EXTERIOR SERVICE04/06/2022
DOB NOWSupported ScaffoldSigned-offREPUBLIC EXTERIOR SERVICE04/04/2022
DOB NOWSidewalk ShedSigned-offREPUBLIC EXTERIOR SERVICE04/04/2022
DOB NOWSupported ScaffoldSigned-offREPUBLIC EXTERIOR SERVICE04/01/2022
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C02/24/2022
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C02/22/2022
DOB NOWStructuralSigned-offPAV-LAK CONTRACTING INC01/28/2022
DOB NOWConstruction FenceSigned-offPAV-LAK CONTRACTING INC01/28/2022
DOB NOWGeneral ConstructionSigned-offPAV-LAK CONTRACTING INC01/28/2022
DOB NOWMechanical SystemsSigned-offSAV-MOR MECHANICAL, INC01/27/2022
DOB NOWPlumbingSigned-offMACCARONE PLUMBING INC01/13/2022
DOB NOWMechanical SystemsSigned-offSAV-MOR MECHANICAL, INC12/17/2021
DOB NOWGeneral ConstructionSigned-offPAV-LAK CONTRACTING INC11/30/2021
DOB NOWStructuralSigned-offPAV-LAK CONTRACTING INC11/29/2021
DOB NOWBoiler EquipmentSigned-offNEW YORK HEATING CORP09/28/2021
DOB NOWStructuralPermit IssuedPAV-LAK CONTRACTING INC09/10/2021
DOB NOWPlumbingSigned-offSKYVIEW HTG&AIR CON CORP09/08/2021
DOB NOWConstruction FenceSigned-offPAV-LAK CONTRACTING INC08/26/2021
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C04/01/2021
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C04/01/2021
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C04/01/2021
DOB NOWPlumbingSigned-offSKYVIEW HTG&AIR CON CORP03/30/2021
DOB NOWMechanical SystemsSigned-offSAV-MOR MECHANICAL, INC03/02/2021
DOB NOWSprinklersSigned-offADVANCED AUTO SPR.CO.,INC01/28/2021
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C01/15/2021
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C01/14/2021
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C04/23/2020
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C12/14/2019
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C12/14/2019
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C12/13/2019
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C04/02/2019
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C03/30/2019
+ 56 more permits on file
1 project · most recent 08/13/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/13/2026Signed-offG BUILDERS III LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric SUZ-AA18NL 18,000 BTU · Split System ×2
1 project · most recent 08/13/2026
FiledStatusContractorScope
08/13/2026Signed-offREAL PLUMBING CORP—
1 project · most recent 08/13/2026
Water/Sanitary
FiledStatusContractorScope
08/13/2026Permit IssuedREAL PLUMBING CORPWater/Sanitary
9 projects · most recent 06/16/2026
General Wiring
FiledStatusContractorScope
06/16/2026Permit IssuedJ.M.C. ELECTRICAL CORP.General Wiring
06/28/2022CompletePATRIOT ELECTRIC CORPGeneral Wiring
12/27/2021CompletePATRIOT ELECTRIC CORPGeneral Wiring
10/18/2021CompletePATRIOT ELECTRIC CORPGeneral Wiring
09/29/2021CompletePATRIOT ELECTRIC CORPGeneral Wiring
09/29/2021CompletePATRIOT ELECTRIC CORPGeneral Wiring
02/05/2021CompletePATRIOT ELECTRIC CORPGeneral Wiring
06/03/2019CompleteNYCOM ELECTRICAL CORP—
01/31/2018CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/03/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/29/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/24/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/07/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
08/26/2026Mechanical SystemsWilliam Ryanspecial
08/26/2026HVAC-R and service water heating system controlsWilliam Ryanenergy_progress
08/26/2026FinalWilliam Ryanprogress
08/26/2026Maintenance informationWilliam Ryanenergy_progress
08/26/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
08/26/2026Energy Code Compliance InspectionsWilliam Ryanprogress
08/26/2026Post-installed AnchorsWilliam Ryanspecial
08/26/2026HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
08/26/2026HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
06/05/2026HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
06/03/2026Energy Code Compliance InspectionsWilliam Ryanprogress
05/21/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
06/20/2023Public Assembly Emergency LightingJOHN MCMONAGLEprogress
05/16/2023Public Assembly Emergency LightingJOHN MCMONAGLEprogress
03/13/2023Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
02/09/2023Fire-Resistant Penetrations and JointsSTEPHEN WOODCHEKEspecial
01/20/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsJOHN MCMONAGLEspecial
01/16/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsJOHN MCMONAGLEspecial
08/31/2022Fire-Resistant Penetrations and JointsSTEPHEN WOODCHEKEspecial
08/30/2022Public Assembly Emergency LightingSTEPHEN WOODCHEKEprogress
08/11/2022Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/18/2022Public Assembly Emergency LightingSTEPHEN WOODCHEKEprogress
10/04/2021Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
10/04/2021Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
10/04/2021Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
Latest 25 of 56.
▾Documents — 986 on file (BIS + DOB NOW)
▸Plans & Drawings48
▸DOB NOWPlans/Sketch19
09/06/2026M00001032-I1Request digital key ↗
09/06/2026M00001024-I1Request digital key ↗
09/06/2026M00033742-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold9
09/05/2026M00115549-I1Request digital key ↗
09/04/2026M00444731-I1Request digital key ↗
09/04/2026M00453669-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly8
09/05/2026M00183850-P1Request digital key ↗
09/04/2026M00350124-P1Request digital key ↗
08/15/2026M00183868-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/04/2026M00364811-I1Request digital key ↗
09/04/2026M00364811-P5Request digital key ↗
08/15/2026M00364811-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/04/2026M00364842-P1Request digital key ↗
09/04/2026M00364842-P2Request digital key ↗
09/04/2026M00364842-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/06/2026M00108248-I1Request digital key ↗
09/05/2026M00281733-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/14/2026M00364698-I1Request digital key ↗
▸Applications & Permits219
▸BISPLAN / WORK APPROVAL APPLICATION136
09/30/2025121191842Open ↗
06/26/2025121191842Open ↗
03/26/2025140559287Open ↗
Showing 3 of 136 on file for this type
▸BISWORK PERMIT APPLICATION64
01/15/2025121191842Open ↗
03/29/2023121191842Open ↗
01/10/2023140798457Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWLPC Approval/Permit16
08/17/2026M01404318-P1Open ↗
08/15/2026M01404318-S1Open ↗
08/15/2026M01404318-I1Open ↗
Showing 3 of 16 on file for this type
▸BISLL114/19 PERMIT RESTRICTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications191
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION53
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 53 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature48
09/06/2026M00001032-I1Open ↗
09/06/2026M00033742-I1Open ↗
09/05/2026M00183868-P3Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
09/29/2026M00108248-I1Open ↗
09/25/2026M00523429-I1Open ↗
09/23/2026M00453669-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/25/2026M00523429-I1Open ↗
09/25/2026M00523429-I1Open ↗
09/25/2026M00523429-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment53
▸BISSCHEDULE B - PLUMBING29
06/26/2025121191842Open ↗
07/09/2024121191842Open ↗
07/01/2024121191842Open ↗
Showing 3 of 29 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA10
03/12/2025121191842Open ↗
Showing 1 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/03/2022140798457Open ↗
▸BISSPRINKLER SYSTEMS1
07/05/2023140546773Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE SIGNOFF1
03/16/2023121191842Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00115549-P6Open ↗
▸Environmental & Asbestos26
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/04/2026M00364842-P2Open ↗
09/04/2026M00364842-P1Open ↗
09/04/2026M00364842-I1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/03/2022140798457Open ↗
12/20/2021140798457Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
11/10/2023140546773Open ↗
12/27/2022140798457Open ↗
▸Inspections & Test Reports46
▸BISTECHNICAL REPORT: RESPONSIBILITY37
10/28/2025121191842Open ↗
10/16/2025121191842Open ↗
07/18/2024121191842Open ↗
Showing 3 of 37 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
03/21/2023121191842Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
07/15/2022122166967Open ↗
▸Approvals, Objections & Sign-offs163
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter45
09/06/2026M00001032-I1Open ↗
09/06/2026M00033742-I1Open ↗
09/05/2026M00183850-P1Open ↗
Showing 3 of 45 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST25
03/31/2025140559287Open ↗
01/15/2025123427096Open ↗
11/15/2023140546773Open ↗
Showing 3 of 25 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION23
03/29/2023121191842Open ↗
03/29/2023121191842Open ↗
01/10/2023140798457Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE22
01/23/2025121191842Open ↗
01/21/2025121191842Open ↗
12/24/2024121191842Open ↗
Showing 3 of 22 on file for this type
▸BISLANDMARKS APPROVAL15
03/21/2023121191842Open ↗
Showing 1 of 15 on file for this type
▸BISLANDMARKS SIGNOFF14
03/17/2023140546773Open ↗
03/17/2023140559287Open ↗
03/17/2023122670207Open ↗
Showing 3 of 14 on file for this type
▸BISFINAL8
03/07/2025140559287Open ↗
07/05/2023140546773Open ↗
03/03/2023140856580Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT32
07/02/2024121191842Open ↗
01/03/2022140798457Open ↗
12/20/2021140798457Open ↗
Showing 3 of 32 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
01/15/2025123427096Open ↗
10/10/2024140559287Open ↗
01/23/2024121191842Open ↗
Showing 3 of 7 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
03/29/2023121191842Open ↗
Showing 1 of 3 on file for this type
▸Filing & Intake Forms133
▸BISADDITIONAL INFORMATION81
11/20/2024121191842Open ↗
10/28/2024122670207Open ↗
01/09/2024121191842Open ↗
Showing 3 of 81 on file for this type
▸BISEFILING COVER SHEET24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISBOROUGH INTAKE FORM17
01/15/2025121191842Open ↗
03/16/2022121191842Open ↗
Showing 2 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents26
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION15
04/19/2024123863266Open ↗
04/19/2024123863266Open ↗
12/20/2023123430661Open ↗
Showing 3 of 15 on file for this type
▸BISSupporting Document: Fee Exempt3
03/03/2023140856580Open ↗
03/02/2023123206119Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWAlternate Plan 23
08/15/2026M00183868-P3Open ↗
08/14/2026M00183868-P1Open ↗
08/14/2026M00183868-I1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREVISE PW1A TO SHOW C.F. AS U.G. 41
11/13/2025121191842Open ↗
▸BISFUEL-OIL STORAGE AND FUEL-OIL PIPING SYSTEMS1
12/27/2022140798457Open ↗
▸DOB NOWDoc 11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type